| By: Harris | H.B. No. 5590 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to a cost overage exemption for interconnection of | |
| advanced nuclear reactors to the ERCOT transmission system. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Section 35.004(d-2), Utilities Code, is amended | |
| to read as follows: | |
| (d-2) Costs in excess of the transmission-owning utility | |
| allowance provided by Subsection (d-1) incurred to interconnect | |
| generation resources with the ERCOT transmission system must be | |
| directly assigned to and collected from the generation resource | |
| interconnecting through the facilities. This subsection does not | |
| apply to excess costs incurred to interconnect a generation | |
| resource that is an advanced nuclear reactor. For purposes of this | |
| subsection, an advanced nuclear reactor is a fission-based reactor | |
| belonging to one of the following categories: | |
| (1) a large reactor, with a generation capacity | |
| between 400 and 1400 megawatts of electricity; | |
| (2) a small modular reactor, with a generation | |
| capacity between 50 and 400 megawatts of electricity; or | |
| (3) a microreactor, with a generation capacity of less | |
| than 50 megawatts of electricity. | |
| SECTION 2. This Act takes effect September 1, 2025. |