Introduced
Underlined text would be added to current law. Struck-through text would be removed.
| 89R908 PRL-D | ||
| By: Cortez | H.B. No. 533 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to imposing liens for labor and supplies provided by | |
| cleaners. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Sections 53.001(2) and (4), Property Code, are | |
| amended to read as follows: | |
| (2) "Improvement" includes: | |
| (A) a house, building, structure, parking | |
| structure, physical appurtenance, pool, utility, railroad, well, | |
| storage facility, abutting sidewalks and streets, utilities in or | |
| on those sidewalks and streets, land reclaimed from overflow, and | |
| other fixtures or modifications to real property; | |
| (B) clearing, grubbing, draining, or fencing of | |
| land; | |
| (C) machinery or apparatuses used for raising | |
| water or for supplying or storing water for stock, domestic use, or | |
| irrigation; | |
| (D) work described by Section 53.021(4) or (6); | |
| and | |
| (E) a design, drawing, plan, plat, survey, or | |
| specification provided by a licensed architect, engineer, or | |
| surveyor. | |
| (4) "Material" means all or part of: | |
| (A) the material, machinery, fixtures, or tools: | |
| (i) incorporated into the work; | |
| (ii) used in the direct performance of the | |
| work; | |
| (iii) specially fabricated for an | |
| improvement; or | |
| (iv) ordered and delivered for | |
| incorporation or use; | |
| (B) rent at a reasonable rate and actual running | |
| repairs at a reasonable cost for construction equipment used or | |
| reasonably required and delivered for use in the direct performance | |
| of the work at the site of the construction or repair; or | |
| (C) power, water, fuel, [ |
|
| cleaning supplies consumed or ordered and delivered for consumption | |
| in the direct performance of the work. | |
| SECTION 2. Section 53.021, Property Code, is amended to | |
| read as follows: | |
| Sec. 53.021. PERSONS ENTITLED TO LIEN. A person has a lien | |
| if the person, under a contract with the owner or the owner's agent, | |
| trustee, receiver, contractor, or subcontractor: | |
| (1) labors or furnishes labor or materials for | |
| construction or repair of an improvement; | |
| (2) specially fabricates material, even if the | |
| material is not delivered; | |
| (3) is a licensed architect, engineer, or surveyor | |
| providing services to prepare a design, drawing, plan, plat, | |
| survey, or specification; | |
| (4) provides labor, plant material, or other supplies | |
| for the installation of landscaping for an improvement, including | |
| the construction of a retention pond, retaining wall, berm, | |
| irrigation system, fountain, or other similar installation; [ |
|
| (5) performs labor as part of, or furnishes labor or | |
| materials for, the demolition of an improvement on real property; | |
| or | |
| (6) provides labor or other supplies for the interior | |
| cleaning of a home or office. | |
| SECTION 3. Section 53.023, Property Code, is amended to | |
| read as follows: | |
| Sec. 53.023. PAYMENT SECURED BY LIEN. The lien secures | |
| payment for: | |
| (1) the labor done or material furnished for the | |
| construction, repair, design, survey, [ |
|
| cleaning; or | |
| (2) the specially fabricated material, even if the | |
| material has not been delivered or incorporated into the | |
| construction or repair, less its fair salvage value. | |
| SECTION 4. Section 53.124(e), Property Code, is amended to | |
| read as follows: | |
| (e) The time of inception of a lien that is created under | |
| Section 53.021(3), (4), (5), or (6) [ |
|
| date of recording of an affidavit of lien under Section 53.052. The | |
| priority of a lien claimed by a person entitled to a lien under | |
| Section 53.021(3), (4), (5), or (6) [ |
|
| respect to other mechanic's liens is determined by the date of | |
| recording. A lien created under Section 53.021(3), (4), (5), or (6) | |
| [ |
|
| grantee or purchaser who acquires an interest in the real property | |
| before the time of inception of the lien. | |
| SECTION 5. The changes in law made by this Act apply only to | |
| an original contract entered into on or after the effective date of | |
| this Act. An original contract entered into before the effective | |
| date of this Act is governed by the law as it existed immediately | |
| before the effective date of this Act, and that law is continued in | |
| effect for that purpose. | |
| SECTION 6. This Act takes effect September 1, 2025. |