Enrolled
Underlined text would be added to current law. Struck-through text would be removed.
| H.B. No. 5247 |
| AN ACT | ||
| relating to an alternative capital recovery process for certain | ||
| utilities. | ||
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
| SECTION 1. Subchapter E, Chapter 36, Utilities Code, is | ||
| amended by adding Section 36.216 to read as follows: | ||
| Sec. 36.216. SINGLE CAPITAL INVESTMENT PROCEDURE FOR | ||
| CERTAIN UTILITIES. (a) This section applies only to an electric | ||
| utility, other than a river authority, that: | ||
| (1) operates solely inside ERCOT; and | ||
| (2) was identified by the commission as responsible | ||
| for constructing transmission as part of the reliability plan for | ||
| the Permian Basin approved by the commission under Section 39.167, | ||
| as added by Chapter 892 (H.B. 5066), Acts of the 88th Legislature, | ||
| Regular Session, 2023. | ||
| (b) An electric utility that makes total capital | ||
| expenditures that exceed 300 percent of annual depreciation in a | ||
| calendar year may elect in the following calendar year to file a | ||
| single annual proceeding to adjust nonfuel rates on a system-wide | ||
| basis to reflect changes in transmission and distribution invested | ||
| capital in lieu of adjustments to retail and wholesale transmission | ||
| and distribution rates authorized under Section 36.210, Section | ||
| 38.078, as added by Chapter 836 (H.B. 2555), Acts of the 88th | ||
| Legislature, Regular Session, 2023, and commission rules adopted | ||
| under Section 35.004. | ||
| (c) An electric utility seeking to make an election under | ||
| this section shall: | ||
| (1) except as provided by Subsection (d), use the | ||
| filing requirements adopted by the commission for the adjustment | ||
| proceedings described by Subsection (b); | ||
| (2) file a notice with the commission of the utility's | ||
| intent to make the election and supporting documentation of the | ||
| capital expenditures described by Subsection (b) at least 60 days | ||
| before the date the utility makes a filing under Subsection (b); | ||
| (3) provide evidence of the utility's ongoing | ||
| eligibility in the annual proceeding under Subsection (b); and | ||
| (4) notify the commission if the utility determines | ||
| that the utility no longer qualifies for continued use of the | ||
| adjustment under this section. | ||
| (d) An electric utility that makes an election under this | ||
| section: | ||
| (1) may defer all or a portion of the costs, including | ||
| depreciation expense and carrying costs, associated with the | ||
| transmission and distribution invested capital at the utility's | ||
| weighted average cost of capital established in the commission's | ||
| final order in the utility's most recent base rate proceeding for | ||
| invested capital, as described by Section 36.053, not currently | ||
| reflected in the utility's rates for recovery as a regulatory | ||
| asset; and | ||
| (2) shall: | ||
| (A) update the allocation of costs among customer | ||
| classes to reflect customer growth; and | ||
| (B) take into account changes in the number of | ||
| the utility's customers and the effects, on a weather-normalized | ||
| basis, that energy consumption and energy demand have on the amount | ||
| of revenue recovered through the utility's base rates. | ||
| (e) Unless otherwise agreed to by an electric utility that | ||
| makes an election under this section, the commission shall: | ||
| (1) include the regulatory asset in rates set under | ||
| this section; and | ||
| (2) authorize amortization of the regulatory asset | ||
| over: | ||
| (A) a period not to exceed 18 months; or | ||
| (B) if a recovery period described by Paragraph | ||
| (A) would cause the utility to earn more than the utility's allowed | ||
| return on investment as normalized for weather, a longer recovery | ||
| period. | ||
| (f) During a period when an electric utility that makes an | ||
| election under this section earns more than the utility's allowed | ||
| return on investment, on a weather-adjusted basis, the utility | ||
| shall apply the over-earnings to the balance of the regulatory | ||
| asset under Subsections (d) and (e). | ||
| (g) The commission shall approve an adjustment under this | ||
| section not later than the 120th day after the date an electric | ||
| utility files a request for the adjustment. | ||
| (h) The electric utility shall provide notice to retail | ||
| electric providers of rates approved under this section not later | ||
| than the 45th day before the date the rates take effect. | ||
| (i) If the commission does not issue a final order in the | ||
| period described by Subsection (g) and the electric utility | ||
| complies with Subsection (h), the utility may place the requested | ||
| rates into effect on a temporary basis not earlier than the 165th | ||
| day after filing the request. The utility shall refund or credit | ||
| against future bills any difference between the temporary rate and | ||
| the final rate along with interest at the current interest rate as | ||
| determined by the commission. | ||
| (j) An electric utility that makes an election under this | ||
| section may not petition for another adjustment under this section, | ||
| Section 36.210, Section 38.078, as added by Chapter 836 (H.B. | ||
| 2555), Acts of the 88th Legislature, Regular Session, 2023, or | ||
| commission rules adopted under Section 35.004 before the first | ||
| anniversary of the date the utility files a request under | ||
| Subsection (b). | ||
| (k) Notwithstanding any other law, in setting the rate of | ||
| return in a comprehensive base rate proceeding for an electric | ||
| utility receiving a rate adjustment under this section, the | ||
| commission may expressly consider the effect of the adjustment on | ||
| the utility's financial risk and rate of return. | ||
| (l) An electric utility's use of this section terminates | ||
| when the utility no longer qualifies for an adjustment under this | ||
| section, except that the utility's rates in effect on the date the | ||
| utility no longer qualifies remain in effect until modified in a | ||
| future proceeding. | ||
| (m) Nothing in this section is intended to: | ||
| (1) conflict with a provision of a financing order | ||
| issued under Subchapter I; | ||
| (2) affect the limitation on the commission's | ||
| jurisdiction under Section 32.002; | ||
| (3) limit the jurisdiction of a municipality over the | ||
| rates, operations, and services of an electric utility under | ||
| Section 33.001 or limit the ability of a municipality to obtain a | ||
| reimbursement under Section 33.023; | ||
| (4) prevent an electric utility, including a river | ||
| authority, from requesting cost recovery or rate relief under a | ||
| mechanism authorized under Chapter 36 or other provisions of this | ||
| title if the utility or authority is ineligible or becomes | ||
| ineligible to make an election under this section; or | ||
| (5) prevent the commission from: | ||
| (A) reviewing the investment costs included in an | ||
| adjustment under this section in the electric utility's next | ||
| comprehensive base rate proceeding to determine whether the costs | ||
| were prudent, reasonable, and necessary; | ||
| (B) refunding to customers any amount improperly | ||
| recovered through an adjustment under this section, with | ||
| appropriate carrying costs; or | ||
| (C) if applicable, refunding to customers the | ||
| realized equity portion of carrying costs deferred under Subsection | ||
| (d)(1) on a transmission project associated with the reliability | ||
| plan described by Subsection (a) if the in-service date is | ||
| unreasonably delayed beyond December 31, 2030, due to the utility's | ||
| actions, unless the utility demonstrates through contemporaneous | ||
| documentation of the utility's analysis and decision-making that | ||
| the delay is necessary to maximize the load serving capability of | ||
| other transmission projects. | ||
| (n) This section expires December 31, 2035. | ||
| SECTION 2. As soon as practicable after the effective date | ||
| of this Act, the Public Utility Commission of Texas shall adopt | ||
| rules necessary to implement Section 36.216, Utilities Code, as | ||
| added by this Act. | ||
| SECTION 3. It is the intent of the 89th Legislature, Regular | ||
| Session, 2025, that the amendments made by this Act be harmonized | ||
| with another Act of the 89th Legislature, Regular Session, 2025, | ||
| relating to nonsubstantive additions to and corrections in enacted | ||
| codes. | ||
| SECTION 4. This Act takes effect immediately if it receives | ||
| a vote of two-thirds of all the members elected to each house, as | ||
| provided by Section 39, Article III, Texas Constitution. If this | ||
| Act does not receive the vote necessary for immediate effect, this | ||
| Act takes effect September 1, 2025. | ||
| ______________________________ | ______________________________ | |
| President of the Senate | Speaker of the House | |
| I certify that H.B. No. 5247 was passed by the House on May 8, | ||
| 2025, by the following vote: Yeas 137, Nays 8, 2 present, not | ||
| voting; and that the House concurred in Senate amendments to H.B. | ||
| No. 5247 on May 28, 2025, by the following vote: Yeas 110, Nays 28, | ||
| 1 present, not voting. | ||
| ______________________________ | ||
| Chief Clerk of the House | ||
| I certify that H.B. No. 5247 was passed by the Senate, with | ||
| amendments, on May 25, 2025, by the following vote: Yeas 31, Nays | ||
| 0. | ||
| ______________________________ | ||
| Secretary of the Senate | ||
| APPROVED: __________________ | ||
| Date | ||
| __________________ | ||
| Governor |
Official text from the Texas Legislature. Formatting has been adapted for reading on Ratifi.