| relating to the reliability of the ERCOT power grid. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Section 39.1591, Utilities Code, is amended to | |
| read as follows: | |
| Sec. 39.1591. REPORT ON DISPATCHABLE AND NON-DISPATCHABLE | |
| GENERATION FACILITIES. Not later than December 1 of each year, the | |
| commission shall file a report with the legislature that: | |
| (1) includes: | |
| (A) the estimated annual costs incurred by | |
| load-serving entities and generation facilities under this | |
| subchapter associated with backing up dispatchable and | |
| non-dispatchable electric generation facilities to guarantee that | |
| a firm amount of electric energy will be available to the ERCOT | |
| power grid; and | |
| (B) as calculated by the independent system | |
| operator, the cumulative annual costs that have been incurred in | |
| the ERCOT market to facilitate the transmission of dispatchable and | |
| non-dispatchable electricity to load and to interconnect | |
| transmission level loads, including a statement of the total | |
| cumulative annual costs and of the cumulative annual costs incurred | |
| for each type of activity described by this paragraph; [ |
|
| (2) documents the status of the implementation of this | |
| subchapter, including whether the rules and protocols adopted to | |
| implement this subchapter have materially improved the | |
| reliability, resilience, and transparency of the electricity | |
| market; and | |
| (3) recommends any additional legislative measures | |
| necessary to ensure that market signals are adequate to preserve | |
| existing dispatchable generation and incentivize the construction | |
| of new dispatchable generation capacity sufficient to meet the | |
| reliability requirements adopted under Section 39.159 for at least | |
| five years from the date of the report. | |
| SECTION 2. Section 39.1592, Utilities Code, is amended to | |
| read as follows: | |
| Sec. 39.1592. GENERATION RELIABILITY REQUIREMENTS. (a) | |
| This section applies only to an electric generation facility in the | |
| ERCOT power region that is subject to [ |
|
| generator interconnection agreement, [ |
|
| and [ |
|
| (a-1) For the purposes of this section, a generation | |
| facility is considered to be non-dispatchable if the facility's | |
| output is controlled primarily by forces outside of human control. | |
| (b) Not later than December 1 of each year, an owner or | |
| operator of a non-dispatchable [ |
|
| the commission the ability of the facility to ensure that during at | |
| least 95 hours of the highest 100 net load hours to occur in the next | |
| calendar year the facility's hourly availability factor, as | |
| determined under Subsection (b-1), will equal or exceed the | |
| facility's expected availability factor, as determined under | |
| Subsection (b-2). | |
| (b-1) The commission shall determine a non-dispatchable | |
| generation facility's hourly availability factor by dividing the | |
| facility's hourly average generation by the facility's installed | |
| capacity. | |
| (b-2) The commission shall determine a non-dispatchable | |
| generation facility's expected availability factor by calculating | |
| the average generation of the facility, divided by the facility's | |
| installed capacity, during the highest 100 net load hours each | |
| calendar year in an average of two or more immediately preceding | |
| calendar years, [ |
|
| (b-3) The owner or operator may [ |
|
| the performance requirements described by this section | |
| [ |
|
| resources that are eligible to act as ancillary service reserves | |
| according to the protocols of the independent organization | |
| certified for the ERCOT power region under Section 39.151 | |
| [ |
|
| (c) The commission shall require the independent | |
| organization certified under Section 39.151 for the ERCOT power | |
| region to: | |
| (1) enforce the requirements of this section | |
| [ |
|
| the commission, for failing to comply with the performance | |
| requirements described by this section [ |
|
| (2) provide financial incentives, as determined by the | |
| commission, for exceeding the performance requirements described | |
| by this section [ |
|
| (d) The independent organization certified under Section | |
| 39.151 for the ERCOT power region may not impose penalties under | |
| Subsection (c): | |
| (1) for resource unavailability due to planned | |
| maintenance outages or transmission outages; or | |
| (2) on resources that are already subject to | |
| performance obligations [ |
|
| reliability services established by the commission or the | |
| independent organization[ |
|
| [ |
|
| (e) The commission by rule may establish an ancillary | |
| service market or a separate reliability service to implement this | |
| section. | |
| SECTION 3. The owner or operator of a generation facility to | |
| which Section 39.1592(b), Utilities Code, as amended by this Act, | |
| applies shall make the first demonstration required by that section | |
| not later than December 1, 2026. | |
| SECTION 4. This Act takes effect September 1, 2025. |