Introduced
Underlined text would be added to current law. Struck-through text would be removed.
| 89R10416 CS-D | ||
| By: Lozano | H.B. No. 3407 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to installation and operation of meter socket adapters for | |
| residential electric service customers. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Subchapter A, Chapter 17, Utilities Code, is | |
| amended by adding Section 17.011 to read as follows: | |
| Sec. 17.011. METER SOCKET ADAPTER. (a) In this section, | |
| "meter socket adapter" means an electronic device that is installed | |
| between a residential electric meter and the meter socket to | |
| facilitate the deployment of customer-owned or customer-leased | |
| technology. | |
| (b) The commission by rule shall require an electric utility | |
| to authorize the installation and operation of a meter socket | |
| adapter by a residential electric service customer of the utility, | |
| regardless of whether the adapter is owned by the customer or a | |
| third party, if the adapter meets standards adopted by the | |
| commission. In adopting the standards, the commission shall | |
| consider: | |
| (1) National Electrical Code requirements for | |
| connecting a meter socket adapter to the supply side of the service | |
| disconnect; | |
| (2) meter socket adapters approved or listed by a | |
| nationally recognized testing laboratory; | |
| (3) ratings of adapters for the meter sockets into | |
| which the adapters are intended to be installed; and | |
| (4) certifications of meter socket adapters offered by | |
| a nationally recognized testing laboratory. | |
| (c) An electric utility is not required to authorize the | |
| installation of a meter socket adapter that prevents access to the | |
| sealed meter socket compartment or the pull section of the service | |
| section of the electric meter or switchboard. | |
| (d) An electric utility or a third party, including a | |
| manufacturer of meter socket adapters, may install, maintain, and | |
| service a meter socket adapter or associated equipment under this | |
| section on behalf of a residential electric service customer. | |
| (e) Not later than the 60th day after the date an electric | |
| utility receives a request from a residential customer in the | |
| utility's service area or a third party to approve for installation | |
| a specific model of meter socket adapter, the utility shall approve | |
| or deny the request. | |
| (f) An electric utility shall publish on the utility's | |
| website a list of each specific model of meter socket adapter the | |
| utility has approved under Subsection (e). An electric utility | |
| that denies a request to approve a specific model of meter socket | |
| adapter under Subsection (e) shall provide an explanation to the | |
| requestor providing the reason for the denial. | |
| SECTION 2. The Public Utility Commission of Texas shall | |
| require each electric utility to modify the utility's electric | |
| service requirements as required by Section 17.011, Utilities Code, | |
| as added by this Act, as soon as possible after the effective date | |
| of the rules adopted under that section. | |
| SECTION 3. This Act takes effect September 1, 2025. |
Official text from the Texas Legislature. Formatting has been adapted for reading on Ratifi.