Introduced
Underlined text would be added to current law. Struck-through text would be removed.
| 89R12258 ANG-D | ||
| By: Patterson | H.B. No. 3244 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to the location of and light pollution mitigation for wind | |
| turbine generators; authorizing an administrative penalty. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Subchapter A, Chapter 35, Utilities Code, is | |
| amended by adding Sections 35.0023 and 35.0024 to read as follows: | |
| Sec. 35.0023. WIND TURBINE LIGHT POLLUTION MITIGATION. (a) | |
| This section applies only to an electric cooperative, electric | |
| utility, municipally owned utility, power generation company, or | |
| exempt wholesale generator that: | |
| (1) is required by the Federal Aviation Administration | |
| to use aviation obstruction lighting; and | |
| (2) sells at wholesale electric energy produced by a | |
| wind turbine generator. | |
| (b) The commission by rule shall require an electric | |
| cooperative, electric utility, municipally owned utility, power | |
| generation company, or exempt wholesale generator to apply to the | |
| Federal Aviation Administration, or another applicable federal | |
| entity, for authorization to install and operate technology to | |
| mitigate light pollution from the wind turbine generator using a | |
| light mitigation technology system. | |
| (c) The rules adopted under Subsection (b) must require an | |
| electric cooperative, electric utility, municipally owned utility, | |
| power generation company, or exempt wholesale generator that: | |
| (1) installs a wind turbine generator on or after | |
| December 31, 2026, to: | |
| (A) submit an application for approval of light | |
| mitigation technology to the Federal Aviation Administration not | |
| later than 180 days before the commercial operations date for the | |
| wind turbine generator; | |
| (B) install light mitigation technology on all | |
| wind turbine generators not later than 18 months after receiving | |
| approval of the technology from the Federal Aviation | |
| Administration; and | |
| (C) if installation of the light mitigation | |
| technology is delayed due to forces outside of the control of the | |
| cooperative, utility, company, or generator, make a quarterly | |
| report to the commission detailing the reasons for the delay; or | |
| (2) installs a wind turbine generator before December | |
| 31, 2026, to: | |
| (A) on repowering or not later than the 180th day | |
| after the execution of a newly signed long-term power purchase | |
| agreement, submit an application for approval of light mitigation | |
| technology to the Federal Aviation Administration; | |
| (B) install light mitigation technology on all | |
| wind turbine generators not later than 18 months after receiving | |
| approval of the technology from the Federal Aviation | |
| Administration; and | |
| (C) if installation of the light mitigation | |
| technology is delayed due to forces outside of the control of the | |
| cooperative, utility, company, or generator, make a quarterly | |
| report to the commission detailing the reasons for the delay. | |
| (d) Subsection (c) applies only to a wind turbine generator | |
| with a commercial operations date that occurs after December 31, | |
| 2008. | |
| (e) Notwithstanding Section 15.023(b), the total amount of | |
| an administrative penalty assessed for a violation continuing or | |
| occurring on separate days under this section may not exceed $1 | |
| million. | |
| Sec. 35.0024. WIND TURBINE GENERATION FACILITY | |
| DETERMINATION. (a) Before an electric cooperative, electric | |
| utility, municipally owned utility, power generation company, or | |
| other person required by commission rule to register with the | |
| commission before generating electricity may begin operation of or | |
| expand a wind turbine generation facility, the cooperative, | |
| utility, company, or person must submit documentation to the | |
| commission establishing that: | |
| (1) the Federal Aviation Administration has | |
| determined the facility will not be a hazard to air navigation; and | |
| (2) the Military Aviation and Installation Assurance | |
| Siting Clearinghouse, or its successor agency, has determined that: | |
| (A) the facility will not have an adverse impact | |
| on military operations or readiness; or | |
| (B) a mitigation agreement has been executed to | |
| overcome an adverse impact on military operations or readiness. | |
| (b) The commission may impose an administrative penalty | |
| under Section 15.023 on an electric cooperative or municipally | |
| owned utility that violates Subsection (a). | |
| SECTION 2. Section 35.0024, Utilities Code, as added by | |
| this Act, applies only to a wind turbine generation facility | |
| installed on or after the effective date of this Act. A generation | |
| facility installed before the effective date of this Act is | |
| governed by the law as it existed immediately before that date, and | |
| the law is continued in effect for that purpose. | |
| SECTION 3. This Act takes effect September 1, 2025. |