By: King (Senate Sponsor - Schwertner)
H.B. No. 144
(In the Senate - Received from the House April 29, 2025;
May 12, 2025, read first time and referred to Committee on Business &
Commerce; May 23, 2025, reported favorably by the following vote:
Yeas 8, Nays 0; May 23, 2025, sent to printer.)
Click here to see the committee vote
A BILL TO BE ENTITLED
AN ACT
11 unchanged paragraphs
relating to plans for the management and inspection of distribution
poles.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
SECTION 1. The heading to Subchapter E, Chapter 38,
Utilities Code, is amended to read as follows:
SUBCHAPTER E. INFRASTRUCTURE IMPROVEMENT AND MAINTENANCE [ REPORT ]
SECTION 2. Subchapter E, Chapter 38, Utilities Code, is
amended by adding Section 38.103 to read as follows:
Sec. 38.103. DISTRIBUTION POLE PLAN. (a) Each electric
cooperative, electric utility, and municipally owned utility that
distributes electric energy to the public shall submit to the
commission a plan for the management and inspection of distribution
poles the cooperative or utility owns in the cooperative's or
poles in the entity'sutility's distribution system.
(b) Each plan submitted under Subsection (a) must include:
(1) a statement of the plan's scope and objectives; for
ensuring public safety through the effective management,
inspection, maintenance, and repair of distribution poles;
(2) the roles and responsibilities of individuals
responsible for overseeing and executing the plan;
(3) a description of the cooperative's or utility's
processes for:
(A) the management and inspection of
distribution poles on the entity's distribution system;
(B3) theprocesses for training and certifying of personnel,
including third-party vendors, who inspect distribution poles; and
(4) an estimated timeline for completing inspections
and remedial action required for any pole identified as unreliable,
unsafe, or needing repair;
(C5) theprocesses documentationfor ofdocumenting and responseresponding to a report
report or complaint made by a landowner regarding the condition or repair
repair of a distribution polespole;
(4) for each distribution pole to be inspected:
(6) for a plan submitted by an electric utility, the
estimated cost of implementing the plan; and
(A7) a deadlinedescription by whichof the inspectioncooperative's willor beutility's
completed;
(B) a process by which inspection records will be
submitted; and
methods to monitor compliance with the plan.
(c) Not later than May 1 of each year, an entity to which
this section applies shall submit an update to the commission
detailing the entity's compliance with the plan's objectives, the
costs of implementing the plan to date, and the results of the
entity's inspection of distribution poles, including the number of
(C)poles ainspected timeline forand any remedialremediation or replacement action requiredtaken.
for a pole identified as unreliable, unsafe, or needing repair; and
(5) a proposed budget for implementing the plan.
An electric utility may submit the update in a report required under
Section 38.101.
(cd) The commission shall approve,review modify, or reject aeach plan and update
submitted under this section to determine whether the commissionentity under Subsection (a) not later than thethat
180th day after the date the plan is submitted.
submitted the plan or update is in compliance with the plan's
(d)objectives Except as provideddescribed by Subsection (eb),(1) atand leastnotify oncethe entity
everywhether threeor years,not anthe entity tois whichin thiscompliance sectionwith appliesthose shallobjectives.
submit(e) anThe updatecommission tomay accept in place of the commission detailing the entity'sinformation
compliance with the plan's objectives and the costs of implementing
the plan. An electric utility may submit the update in a report
required under Sectionthis 38.101.section any information required under other
(e) At least once each month, an entity to which this
section applies shall submit an update to the commission in a form
prescribedlaw bythat theis commissionsubstantially ofsimilar to the information describedrequired byunder
Subsection (b)(4). After an entity to which this section applies
submits at least 24 monthly updates in compliance with this
section, on application by the entity, the commission may allow the
entity to instead file an annual update not later than May 1 of each
year. An update must include for each distribution pole inspected
an indication of whether the pole passed inspection and was
determined to be safe, reliable, and able to withstand extreme
weather conditions, including high winds.
(f) This section does not expand the commission's
jurisdiction over an electric cooperative beyond the jurisdiction
granted under Section 41.004(5)(A). A plan or update filed under
this section is considered a report to ensure public safety for the
purposesthis of Section 41section.004.
SECTION 3. Not later than January 1, 2027, each entity to
10 unchanged paragraphs
which Section 38.103, Utilities Code, as added by this Act, applies
shall submit the plan required by that section to the Public Utility
Commission of Texas. The Public Utility Commission of Texas may
establish different plan submission dates for each class of entity
to which Section 38.103, Utilities Code, as added by this Act,
applies.
SECTION 4. This Act takes effect immediately if it receives
a vote of two-thirds of all the members elected to each house, as
provided by Section 39, Article III, Texas Constitution. If this
Act does not receive the vote necessary for immediate effect, this
Act takes effect September 1, 2025.
* * * * *
______________________________
______________________________
President of the Senate
Speaker of the House
I certify that H.B. No. 144 was passed by the House on April
29, 2025, by the following vote: Yeas 125, Nays 21, 1 present, not
voting; and that the House concurred in Senate amendments to H.B.
No. 144 on May 29, 2025, by the following vote: Yeas 110, Nays 18,
1 present, not voting.
______________________________
Chief Clerk of the House
I certify that H.B. No. 144 was passed by the Senate, with
amendments, on May 26, 2025, by the following vote: Yeas 31, Nays
0.
______________________________
Secretary of the Senate
APPROVED: __________________
Date
__________________
Governor