Introduced
Underlined text would be added to current law. Struck-through text would be removed.
| By: Hinojosa | H.B. No. 1174 |
| A BILL TO BE ENTITLED | |
| AN ACT | |
| relating to a requirement that an applicant for a permit to drill an | |
| oil or gas well submit a gas capture plan for the well. | |
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | |
| SECTION 1. Subchapter F, Chapter 86, Natural Resources | |
| Code, is amended by adding Section 86.186 to read as follows: | |
| Sec. 86.186. GAS CAPTURE PLAN. (a) The commission may not | |
| issue a permit to drill, deepen, plug back, or reenter an oil or gas | |
| well unless the applicant submits with the application a gas | |
| capture plan to minimize flaring from the well. | |
| (b) The gas capture plan must include: | |
| (1) the volume of gas anticipated to be produced from | |
| the well annually, measured in thousands of cubic feet; | |
| (2) the volume of oil anticipated to be produced from | |
| the well annually, measured in barrels; | |
| (3) the volume of condensate anticipated to be | |
| produced from the well annually, measured in barrels; | |
| (4) a detailed map depicting each existing, planned, | |
| and anticipated gas gathering system in the general area of the | |
| well; | |
| (5) the following information with regard to the gas | |
| gathering system that the operator of the well has contracted to use | |
| or, if the operator has not entered into a contract, the gas | |
| gathering system that is closest to the well: | |
| (A) the name of the operator of the gas gathering | |
| system; | |
| (B) a description of the approximate route of the | |
| pipeline required to connect the well to the gas gathering system; | |
| (C) the distance in feet of the pipeline required | |
| to connect the well to the gas gathering system; | |
| (D) the volume of gas in thousands of cubic feet | |
| per day that the gas gathering system is capable of transporting; | |
| (E) the volume of gas in thousands of cubic feet | |
| per day that the gas gathering system is currently transporting; | |
| (F) the volume of gas in thousands of cubic feet | |
| per day that the gas gathering system is anticipated to be | |
| transporting on the date of first sale of gas from the well; | |
| (G) the reliability of the gas gathering system, | |
| including the average annual downtime of the system; and | |
| (H) the name and location of the gas processing | |
| plant that receives or is anticipated to receive gas from the gas | |
| gathering system; | |
| (6) any plans for expanding the gas gathering systems | |
| in the general area of the well; | |
| (7) any other issues affecting the gathering of gas in | |
| the general area of the well; | |
| (8) a plan for connecting the well to a gas gathering | |
| system, including: | |
| (A) a description of any potential right-of-way | |
| issues; | |
| (B) the schedule for constructing any necessary | |
| gas gathering facilities; | |
| (C) the date a gas gathering line will be | |
| available; | |
| (D) a statement of whether the gas gathering | |
| system described by Subdivision (5) has the capacity to accept the | |
| volume of gas anticipated to be produced from the well at the time | |
| of application for the permit; and | |
| (E) a description of any discussions the operator | |
| of the well has had with other upstream operators regarding the | |
| construction or availability of a gas gathering line; and | |
| (9) a description of any options available to the | |
| operator of the well for the beneficial use of gas from the well if | |
| the well cannot be connected to a gas gathering system, including: | |
| (A) on-site use of the gas; | |
| (B) the processing of liquids in the gas; | |
| (C) the use of the gas for electric power | |
| generation; | |
| (D) the conversion of the gas to liquid fuels; | |
| (E) the compression of the gas on the lease on | |
| which the well is located; | |
| (F) the reinjection of the gas for underground | |
| storage; | |
| (G) the reinjection of the gas for temporary | |
| storage; | |
| (H) the reinjection of the gas for enhanced oil | |
| recovery; and | |
| (I) shutting in the well, taking into account the | |
| effect of doing so on the reservoir as well as public health, | |
| safety, and the environment. | |
| SECTION 2. The change in law made by this Act applies only | |
| to a permit the application for which is filed with the Railroad | |
| Commission of Texas on or after the effective date of this Act. A | |
| permit the application for which is filed before the effective date | |
| of this Act is subject to the law in effect on the date the | |
| application is filed, and that law is continued in effect for that | |
| purpose. | |
| SECTION 3. This Act takes effect September 1, 2025. |