Ratifi Español Sign in
Ratifi

Federal bills from Congress.gov. State bills from Open States.

SB 1019Session 2025-2026

An Act amending the act of November 30, 2004 (P.L.1672, No.213), known as the Alternative Energy Portfolio Standards Act, further providing for definitions, for interconnection standards for customer-generator facilities and for interagency responsibilities.

Printer's No. PN1354

See other bills
under the
same topic PRINTER'S NO. 1354 THE GENERAL ASSEMBLY OF PENNSYLVANIASENATE BILL No.1019 Session of 2025 INTRODUCED BY BOSCOLA, KIM, HAYWOOD, VOGEL, HUTCHINSON, ROBINSON, FLYNN AND MILLER, DECEMBER 10, 2025 REFERRED TO CONSUMER PROTECTION AND PROFESSIONAL LICENSURE, DECEMBER 10, 2025 AN ACTAmending the act of November 30, 2004 (P.L.1672, No.213), entitled "An act providing for the sale of electric energy generated from renewable and environmentally beneficial sources, for the acquisition of electric energy generated from renewable and environmentally beneficial sources by electric distribution and supply companies and for the powers and duties of the Pennsylvania Public Utility Commission," further providing for definitions, for interconnection standards for customer-generator facilities and for interagency responsibilities.The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:Section 1. The definitions of "customer-generator" and "net metering" in section 2 of the act of November 30, 2004 (P.L.1672, No.213), known as the Alternative Energy Portfolio Standards Act, are amended and the section is amended by adding definitions to read:Section 2. Definitions.The following words and phrases when used in this act shall have the meanings given to them in this section unless the context clearly indicates otherwise:123456789101112131415161718192021 "Abandoned mine land." An area of land no longer in use that, in connection with extracting a natural resource from its natural deposits in the earth by any means, has had material placed upon, under or above the surface.* * *"Avoided cost." The average locational marginal price of energy, capacity and transmission and distribution grid services values, as determined by the commission, in the applicable transmission zone over the customer-generator's billing period."Brownfield." A property the expansion, redevelopment or reuse of which may be complicated by the presence or potential presence of a hazardous substance, pollutant or contaminant."Capped landfill." A capped facility for disposal of trash or garbage in which waste is buried between layers of earth and covered by a cap.* * *"Corporation." A body corporate, joint-stock company or association, domestic or foreign, and the body corporate's, joint-stock company's or association's lessee, assignee, trustee, receiver or other successor in interest that has a power or privilege of a corporation not possessed by an individual or partnership. The term does not include a municipal corporation, except as otherwise expressly provided in this act, or a bona fide cooperative association that furnishes service on a nonprofit basis only to the association's stockholders or members.* * *"Customer-generator." A [nonutility owner or operator of a net metered distributed generation system with] retail electric customer that is a nonutility that owns and operates, leases or 20250SB1019PN1354 - 2 - 123456789101112131415161718192021222324252627282930 operates or contracts with a third party that owns or operates an alternative energy system that meets all of the following criteria:(1) Has a nameplate capacity of not greater than 50 kilowatts if installed at a residential service or not larger than 3,000 kilowatts at other customer service locations, except for customers whose systems are above three megawatts and up to five megawatts who make their systems available to operate in parallel with the electric utility during grid emergencies as defined by the regional transmission organization or where a microgrid is in place for the primary or secondary purpose of maintaining critical infrastructure, such as homeland security assignments, emergency services facilities, hospitals, traffic signals, wastewater treatment plants or telecommunications facilities, provided that technical rules for operating generators interconnected with facilities of an electric distribution company, electric cooperative or municipal electric system have been promulgated by the Institute of Electrical and Electronic Engineers and the Pennsylvania Public Utility Commission.(2) Has electric load, independent of the alternative energy system, behind the meter and the point of interconnection of the alternative energy system. To be independent of the alternative energy system, the electric load must have a purpose other than to support operation, maintenance or administration of the alternative energy system.(3) Is sized so the alternative energy system will generate not more than the customer-generator's annual electric consumption at the interconnection meter location 20250SB1019PN1354 - 3 - 123456789101112131415161718192021222324252627282930 when combined with all qualifying virtual meter aggregation locations as of the interconnection application date. The following shall apply:(i) For existing service location accounts, annual electric consumption shall be based on the highest electric usage from any 12 consecutive-month period within 60 months before submission of the interconnection application.(ii) For new service location accounts, annual electric consumption shall be based on the building type and size and the anticipated usage of electric equipment and fixtures planned for the new service location, as well as the customer's annual consumption from dependent accounts to be included for virtual meter aggregation.(iii) Excess generation shall be subject to an annual net-metered accounting period, and compensation to the customer-generator for any remaining excess generation shall be capped at the avoided cost.* * *"Full retail value." The value of electric energy credited to a customer-generator at the retail rate, including the generation, capacity, transmission and distribution components of the electric distribution company's approved tariff."Industrial land." Land planned and zoned for industrial use. The term includes land used for manufacturing, assembly, fabrication, processing, storage, logistics, warehousing, importation, distribution, transshipment or research and development.* * *"Net metering." The means of measuring the difference 20250SB1019PN1354 - 4 - 123456789101112131415161718192021222324252627282930 between the electricity supplied by an electric utility and the electricity generated by a customer-generator when any portion of the electricity generated by the alternative energy generating system is used to offset part or all of the customer-generator's requirements for electricity. Virtual meter aggregation on properties owned or leased and operated by [a] the same customer-generator [and located within two miles of the boundaries of the customer-generator's property and] within a single electric distribution company's service territory shall be eligible for net metering. All service locations to be aggregated must be metered electric utility service location retail customer accounts, held by the same individual , legal entity or parent corporation . "Nonutility." A business, person or entity whose primary or secondary purpose, character or nature is not the generation, transmission, distribution or sale of electricity at wholesale or retail."Parking facility canopy." A structure constructed over a public or private parking lot."Preferred site." A location determined by the commission to qualify based on whether a majority of the facility's generating capacity or physical footprint is located on one or more of the following:(1) A warehouse or commercial rooftop.(2) A brownfield.(3) Abandoned mine land.(4) A capped landfill.(5) A parking facility canopy.(6) A site on or adjacent to coal-fired electric generation plants that have closed or will close within one 20250SB1019PN1354 - 5 - 123456789101112131415161718192021222324252627282930 year of the effective date of this definition.(7) A school facility.(8) Industrial land.* * *"School facility." An educational building and surrounding premises owned by any of the following:(1) A school entity as defined in the act of March 10, 1949 (P.L.30, No.14), known as the Public School Code of 1949, including any of the following:(i) A school district.(ii) An intermediate unit.(iii) An area career and technical school.(iv) A charter school.(v) A cyber charter school.(vi) A regional charter school.(2) A charter school for the education of the deaf or the blind.(3) A nonpublic school recognized by the Department of Education.(4) A community college.(5) The Thaddeus Stevens College of Technology.(6) The Pennsylvania College of Technology.* * *"Utility." A business, person or entity whose primary purpose, character or nature is the generation, transmission, distribution or sale of electricity at wholesale or retail. The term does not include a building or facility owner or operator that manages the internal distribution system serving the building or facility and that supplies electric power and related power services to occupants of the building or facility.20250SB1019PN1354 - 6 - 123456789101112131415161718192021222324252627282930 "Virtual meter aggregation." The combination of readings and billing for meters, regardless of rate class, on properties owned or leased and operated by a customer-generator by means of the electric distribution company's billing process rather than through physical rewiring of the customer-generator's property for a single physical point of contact. Virtual meter aggregation on properties owned or leased by the same customer- generator or alternative energy system operator and within a single electric distribution company's service territory shall be eligible for net metering. Service locations of dependent accounts to be aggregated must be electric distribution company service location accounts, held by the same individual , legal entity or parent corporation receiving retail electric service from the same electric distribution company . The location of an alternative energy system that serves virtual meter aggregation service locations of dependent accounts shall not be required to have measurable electric load independent of the alternative energy system."Vis major." An event or circumstance that is beyond human control and cannot be predicted or prevented."Warehouse." A distribution facility, storage facility, fulfillment center, logistics facility or a facility engaging in similar uses."Warehouse or commercial rooftop." A roof located on a building or group of buildings used primarily for indoor storage, transf er, manufacture, assembly and distribution or sale of products, services and materials. Section 2. Section 5 of the act is amended to read:Section 5. Interconnection standards for customer-generator facilities.20250SB1019PN1354 - 7 - 123456789101112131415161718192021222324252627282930 (a) Compensation for small customer-generator systems.-- Excess generation from net-metered customer-generators with a nameplate capacity of not greater than 50 kilowatts if installed at a residential service or not greater than 3,000 kilowatts at other customer service locations shall receive full retail value for all energy produced on an annual basis. The commission shall develop technical and net metering interconnection rules for customer-generators intending to operate renewable onsite generators in parallel with the electric utility grid, consistent with rules defined in other states within the service region of the regional transmission organization that manages the transmission system in any part of this Commonwealth. The commission shall convene a stakeholder process to develop Statewide technical and net metering rules for customer-generators. The commission shall develop these rules within nine months of the effective date of this act.(b) Safe-harbored net metering for existing systems and applications.--(1) Excess generation from net-metered customer-generators that are not eligible for compensation under subsection (a) and that, as of the effective date of this paragraph, are in operation or have submitted an interconnection application to an electric distribution company before September 1, 2025, shall receive full retail value under the electric distribution company's small general service or small commercial rate schedule for all energy produced on an annual basis until the earlier of:(i) replacement of generation equipment that extends the life of the system or changes the nameplate generating capacity, except when the customer-generator 20250SB1019PN1354 - 8 - 123456789101112131415161718192021222324252627282930 is actively working to recommence production after routine maintenance or a vis major event; or(ii) December 31, 2050.(2) After the applicable time period specified under paragraph (1), excess generation shall be subject to an annual net metered accounting period, and compensation to the customer-generator for any remaining excess generation shall be capped at the avoided cost.(3) A customer-generator shall be responsible for interconnection costs and distribution system upgrades related to the interconnection of the customer-generator's facility in accordance with the commission's regulations.(4) The commission, in collaboration with the Office of Consumer Advocate, electric distribution companies and solar energy organizations, may establish, by order, a cap on the total megawatts of customer-generators that are eligible for safe harbor under this subsection. A cap established under this paragraph may not exceed a defined percentage of each electric distribution company's default service peak load. A net-metered customer-generator that has an interconnection agreement with an electric distribution company that was executed before September 1, 2025, qualifies for safe harbor under this subsection and may not be excluded by a cap established under this paragraph.(c) Preferred-site virtual meter aggregation projects.--(1) Notwithstanding subsection (a) or (b), excess generation from virtual meter aggregation proj ects that are constructed on a preferred site and that commence op eration after the effective date of this paragraph shall receive full retail value at the applicable rate schedule of the dependent 20250SB1019PN1354 - 9 - 123456789101112131415161718192021222324252627282930 accounts for all energy produced on a monthly basis until the earlier of:(i) replacement of generation equipment that extends the life of the system or changes the nameplate generating capacity, except when the customer-generator is actively working to recommence production after routine maintenance or a vis major event; or(ii) December 31, 2050, if the project is constructed primarily on a preferred site, as determined by the commission based on a majority of the facility's generating capacity or physical footprint.(2) A preferred-site alternative energy system that serves virtual meter aggregation service locations of dependent accounts shall not be required to have measurable electric load independent of the alternative energy system.(3) After the applicable time period specified under paragraph (1), excess generation shall be subject to an annual net metered accounting period, and compensation to the customer-generator for any remaining excess generation shall be capped at the avoided cost.(d) Rate schedule classification.-- The installation of a net metered facility or the participation in virtual meter aggregation shall not constitute grounds for reclassification of the customer-generator's applicable rate schedule.Section 3. Section 7 of the act is amended by adding a subsection to read:Section 7. Interagency responsibilities.* * *(d) Enforcement of provisions.-- The commission shall have authority to enforce this act in accordance with the 20250SB1019PN1354 - 10 - 123456789101112131415161718192021222324252627282930 commission's regulations and orders. The commission may issue, modify or rescind a regulation or order to enforce this act, whether issued before or after the effective date of this subsection. Nothing in this subsection shall be construed to limit authority granted to the commission under 66 Pa.C.S. (relating to public utilities).Section 4. This act shall take effect in 60 days.20250SB1019PN1354 - 11 - 1234567

Official text from the Pennsylvania Legislature. Formatting has been adapted for reading on Ratifi.