A Resolution directing the Joint State Government Commission to study the issue of underground electrical lines.

Printer's No. PN1866

See other bills
under the
same topic PRINTER'S NO. 1866 THE GENERAL ASSEMBLY OF PENNSYLVANIAHOUSE RESOLUTION No.254 Session of 2025 INTRODUCED BY STEELE, POWELL, SALISBURY, KHAN, PROBST, WEBSTER, SANCHEZ, MAYES, HADDOCK, HILL-EVANS, FRANKEL, RIVERA, BRENNAN, CEPEDA-FREYTIZ AND NEILSON, JUNE 6, 2025 REFERRED TO COMMITTEE ON CONSUMER PROTECTION, TECHNOLOGY AND UTILITIES, JUNE 9, 2025 A RESOLUTIONDirecting the Joint State Government Commission to study the issue of underground electrical lines.WHEREAS, Extreme weather events have been occurring more frequently in Pennsylvania; andWHEREAS, These effects have had an increased negative financial impact to homeowners and utility customers across the State; andWHEREAS, Pennsylvania has had multiple years with combined disaster costs of up to $5 billion, which had never occurred prior to the year 2000; andWHEREAS, Since 2015, trees and vegetation have consistently been the leading cause of outages and lost customer minutes in Pennsylvania; andWHEREAS, These storms routinely bring down trees and overhanging limbs from canopy trees, which is the primary threat to Pennsylvania's electric reliability; andWHEREAS, Pennsylvania ranks fifth in the nation for weather-1234567891011121314151617 related outages, with over 82 outages from 2000 to 2022; andWHEREAS, These storms may cause some residents to face power outages that last for more than a week; andWHEREAS, Much of the United States electric grid was built in the 1960s and 1970s and our aging infrastructure is struggling to meet our modern electricity needs; andWHEREAS, One way to prevent extreme weather from affecting our power grid is to explore the option of underground electrical lines; andWHEREAS, Installing underground electrical lines costs more initially than overhead lines, but the underground lines are less prone to damage and disruptions; therefore be itRESOLVED, That the House of Representatives directs the Joint State Government Commission to conduct a study and issue a report studying the efficacy of undertaking a Statewide project of placing electrical and other utility lines underground; and be it furtherRESOLVED, That the study shall include the following: cost, viability, geographic and topographic limitations, right-of-way issues and land usage issues associated with underground electrical lines; and be it furtherRESOLVED, That the Joint State Government Commission shall consult with the Pennsylvania Public Utility Commission when conducting their study; and be it furtherRESOLVED, That the Joint State Government Commission submit the report to the Speaker of the House of Representatives and to members of the House Consumer Protection, Technology and Utilities Committee within one year after the adoption of this resolution.20250HR0254PN1866 - 2 - 1234567891011121314151617181920212223242526272829

Official text from the Pennsylvania Legislature. Formatting has been adapted for reading on Ratifi.