Ratifi Español Sign in
Ratifi

Federal bills from Congress.gov. State bills from Open States.

HB 2429Session 2025-2026

What changed between versions

9 paragraphs changed+446 words added−671 removed

Highlighted text was added in the newer version. Struck-through text was removed.

See other bills

under the

same topic

PRINTER'S NO. 3230 THE GENERAL ASSEMBLY OF PENNSYLVANIAHOUSE BILL No.2429 Session of 2026 INTRODUCED BY CERRATO, FIEDLER, HANBIDGE, RIVERA, MALAGARI, VENKAT, STEELE, OTTEN, HILL-EVANS, CEPEDA-FREYTIZ, BOROWSKI AND DONAHUE, APRIL 20, 2026 REFERRED TO COMMITTEE ON ENERGY, APRIL 20, 2026 AN ACTAmending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in restructuring of electric utility industry, providing for hosting capacity maps.The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:Section 1. Title 66 of the Pennsylvania Consolidated Statutes is amended by adding a section to read:§ 2807.1. Hosting capacity maps. (a) Duties of electric distribution companies.--(1) By July 1, 2027, each electric distribution company shall develop and make publicly available distribution system hosting capacity maps on the electric distribution company's publicly accessible Internet website for respective service territories, which shall be updated every two months and prioritize feeders or nodes that experienced significant changes since the electric distribution company's previous update.(2) The commission may require each electric 123456789101112131415161718

distribution company to include additional data points to improve transparency and planning, as necessary.(b) Hosting capacity websites.--The commission shall publish a list of hyperlinks for each electric distribution company hosting capacity map website on the commission's publicly accessible Internet website.(c) Standards.--The commission may establish uniform reporting standards for consistency across each electric distribution company.(d) Preapplication period.--(1) Within 30 days of the effective date of this subsection, each electric distribution company shall develop a preapplication report that provides general locational information to an entity that proposes to interconnect to the distribution system upon request, which shall include the proximity to distribution lines operating at a nominal voltage of at least 4,000 kV, existing interconnected generation, interconnection viability and any other relevant information identified by the commission.(2) An electric distribution company shall provide the locational information to the entity that proposes to interconnect to the distribution system within seven business days after a request is submitted to the electric distribution company.(e) Requirements.--The hosting capacity maps under subsection (a) shall include, at a minimum, the following:(1) Total available distribution system hosting capacity, expressed in kilowatts, for new loads.(2) A unified interface which shall identify the following:20260HB2429PN3230 - 2 - 123456789101112131415161718192021222324252627282930

(i) A single unified interface with filtering or toggling mechanisms designed to identify the following:(A) Available load hosting capacity.(B) Available capacity for distributed energy resource interconnection.(ii) Existing and queued distributed energy resources.(iii) Distribution system constraints.(3) Display of circuit hosting capacity at circuit-level granularity, including feeder subsections.(4) Forecasts of approved system upgrades.(5) Geographic locations and voltage levels of circuits.(6) Available circuit capacity expressed in kilowatts.(7) Disclosure of constraints or limiting criteria identified by color coding system, which are evaluated by the hosting capacity analysis for thermal, anti-islanding and voltage, for the purpose of identifying capacity limits.(f) Reliability reports.--Each electric distribution company shall publish an annual reliability report which shall include the following metrics, identified per circuit:(1) System average interruption frequency index, representing the average number of interruptions per interrupted customer.(2) Customer average interruption duration index, representing the average interruption duration or average time to restore service per interrupted customer.(3) Customers experiencing multiple interruptions, identifying customers experiencing at least five interruptions annually divided by the total number of customers served.20260HB2429PN3230 - 3 - 123456789101112131415161718192021222324252627282930

(4) Customers experiencing long interruption durations, identifying customers that have experienced outages of one or more hours in duration divided by the total number of customers served.(5) Average outage frequency and duration per circuit and substation.(6) Identification of circuits and substations with persistent reliability issues.(7) Planned and completed upgrades to enhance grid reliability.(g) Commission review.--The commission shall hold an annual public input hearing to receive input from relevant stakeholders on hosting capacity map design, necessary updates, accuracy and usability.Section 2. This act shall take effect in 90 days.20260HB2429PN3230 - 4 - 123456789101112131415

H2429B3230A03130 IBD:EJH 05/01/26 #90 A03130AMENDMENTS TO HOUSE BILL NO. 2429Sponsor: REPRESENTATIVE FIEDLERPrinter's No. 3230Amend Bill, page 2, by inserting between lines 2 and 3(3) An electric distribution company may establish an online portal or registration process that enables a person to verify the person's identity to receive access to the hosting capacity maps on the electric distribution company's publicly accessible Internet website.(4) The commission shall ensure that an electric distribution company does not discriminate against, hinder or deny a person that properly requests access to the electric distribution company's distribution system hosting capacity maps. A person may file a complaint with the commission if the person believes the electric distribution company has denied or prevented access to an electric distribution company's hosting capacity map in violation of this section.Amend Bill, page 2, line 7, by striking out "may" and inserting shallAmend Bill, page 2, line 9, by striking out the period after "company" and inserting within nine months of the effective date of this subsection, subject to a stakeholder proceeding. At a minimum, standards shall address data format, methodology for calculating load hosting capacity, threshold criteria for constraint disclosure and map user interface requirements.Amend Bill, page 2, line 14, by striking out "an entity" and inserting a personAmend Bill, page 2, line 14, by inserting after "interconnect" new load or generation2026/90IBD/HB2429A03130 - 1 -123456789101112131415161718192021222324252627282930

Amend Bill, page 2, line 17, by striking out "4,000" and inserting 4Amend Bill, page 2, line 18, by striking out the comma after "generation" and inserting and load, distribution system capacity and constraints relevant toAmend Bill, page 2, line 21, by striking out "entity" and inserting personAmend Bill, page 3, line 3, by striking out "load"Amend Bill, page 3, line 3, by inserting after "capacity" for new load interconnectionsAmend Bill, page 3, by inserting between lines 5 and 6(C) A distribution system constraint or characteristic identified by the commission as relevant to siting decisions for new large loads or generation.Amend Bill, page 4, by inserting between lines 10 and 11(8) Other reliability metrics that the commission deems appropriate.Amend Bill, page 4, by inserting between lines 14 and 15(h) Complaint process.--The commission shall promulgate regulations to establish a customer complaint process for any alleged violations of the hosting capacity map standards and requirements established in this section. A violation of this section shall be subject to enforcement by the commission under Chapter 33 (relating to violations and penalties).(i) Applicability.--This section shall not apply to an electric distribution company with less than 100,000 customers.2026/90IBD/HB2429A03130 - 2 -123456789101112131415161718192021222324252627282930

Back to the full text