Ratifi Español Sign in
Ratifi

Federal bills from Congress.gov. State bills from Open States.

HB 2380Session 2025-2026

An Act amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in restructuring of electric utility industry, providing for energy storage procurement.

House Amendment A03553

H2380B3424A03553 NAD:EJH 06/15/26 #90 A03553AMENDMENTS TO HOUSE BILL NO. 2380Sponsor: REPRESENTATIVE FIEDLERPrinter's No. 3424Amend Bill, page 1, line 11, by striking out "3,000" and inserting 3,500Amend Bill, page 1, line 13, by striking out "1, 2033" and inserting 31, 2035Amend Bill, page 1, line 15, by striking out "and" and inserting a commaAmend Bill, page 1, line 15, by striking out the period after "storage" and inserting and 500 megawatts of multiday storage.(b) Permitted uses.--An electric distribution company shall utilize the distribution-connected and transmission-connected energy storage systems procured under this section to perform grid services during peak or off-peak demand periods, including the following:(1) Peak demand reduction and peak load management.(2) Frequency regulation, voltage support and other ancillary services.(3) Avoiding or deferring traditional capital investments on the distribution system or transmission system.(4) Backup generation services during outages or other electric service disruptions.(5) Except for distribution-connected storage, participation in the wholesale energy, capacity or ancillary markets of the regional transmission organization in which the electric distribution company participates.(6) Any other grid services approved by the commission to benefit ratepayers and improve the reliability of the distribution or transmission system.(c) System reliability assessment.--2026/90NAD/HB2380A03553 - 1 -1234567891011121314151617181920212223242526272829303132 (1) Within 180 days of the effective date of this section, each electric distribution company shall conduct and submit an assessment to the commission on the reliability of the distribution and transmission system within the electric distribution company's service territory.(2) The commission's calculations and assignment of capacity targets under subsection (d) shall be based on the commission's review and findings from the assessment completed under this subsection, including the assignment of specific targets for distribution-connected and transmission-connected energy storage systems based on the identified reliability needs described in the assessment.(3) The assessment shall identify, at minimum, the following:(i) Specific areas of the distribution system and transmission system with system constraints and congestion points.(ii) The reliability needs of the transmission and distribution system that may be addressed by the procurement of energy storage systems, including short-duration, long-duration and multiday storage.(iii) An analysis of the megawatts or megawatt-hours of capacity from energy storage systems needed to serve as a cost-effective alternative to traditional capital investments on the distribution and transmission system.(iv) An analysis to determine the technical feasibility of the procurement of distribution-connected and transmission-connected energy storage systems to provide grid services or address the reliability needs of the transmission and distribution system.(v) An analysis of the most practical and cost-effective applications of short-duration, long-duration and multiday duration storage on the distribution and transmission system to improve system performance and deliver cost savings to ratepayers.(vi) Any other information or supporting data required by the commission to properly calculate the apportioned share of energy storage capacity for each electric distribution company.Amend Bill, page 1, line 16, by striking out "(b)" and inserting (d)Amend Bill, page 1, lines 16 and 17, by striking out "of the effective date of this subsection," and inserting following the submission of an assessment under subsection (c),2026/90NAD/HB2380A03553 - 2 -12345678910111213141516171819202122232425262728293031323334353637383940414243444546 Amend Bill, page 2, line 2, by striking out "3,000" and inserting 3,500Amend Bill, page 2, line 3, by striking out "and" and inserting a commaAmend Bill, page 2, line 3, by inserting after "storage" where it occurs the second time and multiday storageAmend Bill, page 2, lines 4 through 9, by striking out "The commission's calculations" in line 4, all of lines 5 through 8 and "(c)" in line 9 and inserting (e)Amend Bill, page 2, line 19, by striking out "or owned"Amend Bill, page 2, lines 27 through 30; page 3, lines 1 and 2; by striking out all of said lines on said pages and inserting (4) The commission may adjust the procurement schedule under subsection (f) if there is a demonstrated lack of commercially available energy storage systems or procurement proposals received, as determined by the commission, or any external delays beyond control of the electric distribution company, including any impacts to the procurement cycle attributable to PJM Interconnection, LLC.(f) Competitive procurement.--(1) Subject to approval by the commission, each electric distribution company shall use an open, fair and nondiscriminatory competitive procurement process, including the use of auctions or requests for proposals, to reach the company's apportioned share of the total megawatts of capacity as described under subsection (d).(2) The commission shall review each electric distribution company's proposed competitive procurement process and solicit feedback from stakeholders for any potential adjustments prior to each procurement.(3) Under the competitive procurement process, each electric distribution company shall issue a solicitation for energy storage system projects and open bidding to independent power producers in order to reach the total megawatts of capacity required under subsection (a).(4) Each electric distribution company shall procure a 2026/90NAD/HB2380A03553 - 3 -123456789101112131415161718192021222324252627282930313233343536373839 minimum of 100 megawatts for each procurement, regardless of the electric distribution company's apportioned share of capacity determined by the commission.Amend Bill, page 3, line 3, by striking out "(e)" and inserting (g)Amend Bill, page 3, line 5, by striking out "(d)" and inserting (f)Amend Bill, page 3, line 25, by striking out "(f)" and inserting (h)Amend Bill, page 3, line 26, by inserting after "contracts" of at least 15 yearsAmend Bill, page 3, line 27, by striking out "3,000" and inserting 3,500Amend Bill, page 3, line 30, by striking out "2028" and inserting 2029Amend Bill, page 4, line 1, by striking out "and" and inserting a commaAmend Bill, page 4, line 2, by inserting after "storage" and 100 megawatts of transmission-connected long-duration storageAmend Bill, page 4, line 4, by striking out "2029" and inserting 2031Amend Bill, page 4, line 4, by inserting after "least" an additionalAmend Bill, page 4, line 5, by inserting after "storage", 200 megawatts of transmission-connected long-duration 2026/90NAD/HB2380A03553 - 4 -1234567891011121314151617181920212223242526272829303132 storage and 100 megawatts of multiday storageAmend Bill, page 4, line 7, by striking out "1, 2030, at least 500" and inserting 31, 2033, at least an additional 500Amend Bill, page 4, line 8, by inserting after "storage", 300 megawatts of transmission-connected long-duration storage and 200 megawatts of multiday storageAmend Bill, page 4, line 10, by striking out "2033" and inserting 2035Amend Bill, page 4, line 11, by inserting after "including" at leastAmend Bill, page 4, line 12, by inserting after "megawatts" where it occurs the first time of distribution-connectedAmend Bill, page 4, lines 12 and 13, by striking out "and 1,000 megawatts of long- duration storage. " and inserting , 400 megawatts of transmission-connected long-duration storage and 200 megawatts of multiday storage.Amend Bill, page 4, line 14, by striking out "(g)" and inserting (i)Amend Bill, page 4, line 15, by striking out "(d)" and inserting (f)Amend Bill, page 4, by inserting between lines 16 and 17(1) For each competitive procurement process, each electric distribution company shall establish an open and transparent stakeholder process with the commission, prospective bidders and stakeholders to review the proposed terms, procedures, requirements and other information related to the competitive procurement process.Amend Bill, page 4, line 17, by striking out "(1)" and inserting 2026/90NAD/HB2380A03553 - 5 -12345678910111213141516171819202122232425262728293031323334 (2)Amend Bill, page 5, line 12, by striking out "(2)" and inserting (3)Amend Bill, page 5, line 13, by striking out "the lowest responsible bidder" and inserting bidders that represent the best valueAmend Bill, page 6, line 6, by striking out "(3) Each" and inserting (4) If the cost-effectiveness and value of services are comparable to other qualified bidders, eachAmend Bill, page 6, lines 6 and 7, by striking out "prioritize the evaluation of " and inserting give priority toAmend Bill, page 6, lines 21 through 25, by striking out all of said lines and inserting (j) Decommissioning and safety.--Each contract agreement entered into under this section shall include provisions requiring the owner or operator to:(1) Provide a decommissioning plan for the procured energy storage systems, including the recycling or reuse of all qualifying components of each system to the extent that the recycling and reuse can be reasonably achieved by existing commercial practices.(2) Comply with the National Fire Protection Association 855 standard in effect on the effective date of this section for the installation of stationary energy storage systems, if applicable, to the chemistry of the energy storage system.(k) Confidential information.--A third-party developer that participates in a competitive procurement process to enter into a contract with an electric distribution company under this section shall not disclose, distribute or otherwise make available any information relating to the operations of the electric grid without the consent of the electric distribution company. A violation of this subsection shall be subject to enforcement by the commission under Chapter 33 (relating to violations and penalties).Amend Bill, page 6, line 26, by striking out "(i)" and inserting 2026/90NAD/HB2380A03553 - 6 -123456789101112131415161718192021222324252627282930313233343536373839 (l)Amend Bill, page 6, lines 27 through 30; page 7, lines 1 through 16; by striking out "a combination of the electric" in line 27, all of lines 28 through 30 on page 6 and all of lines 1 through 16 on page 7 and inserting third-party developers. An electric distribution company may not own the energy storage systems constructed or procured to comply with the requirements of this section.Amend Bill, page 7, line 17, by striking out "(j)" and inserting (m)Amend Bill, page 7, line 18, by striking out "(e)" and inserting (g)Amend Bill, page 7, line 20, by striking out "lowest responsible" and inserting winningAmend Bill, page 8, line 1, by striking out the period after "affordability" and inserting , including consideration of the following:(A) Avoided or deferred transmission, distribution, generation and other traditional infrastructure upgrade costs, including the extent to which the energy storage system functions as a nonwires alternative.(B) System efficiency and operational benefits, including congestion reduction, peak load reduction, reduction of marginal line losses, provision of voltage support and reactive power services, mitigation of localized system constraints and increased distributed energy resource hosting capacity.(C) Reliability and resiliency benefits, including enhancement of system reliability in constrained or high-risk areas and benefits to distribution customers.(D) Market and ratepayer savings, including reduction in the electric distribution company's obligation to procure capacity in PJM Interconnection, LLC, through measurable reductions 2026/90NAD/HB2380A03553 - 7 -12345678910111213141516171819202122232425262728293031323334353637383940 in peak load contribution that result in reduced installed capacity obligations consistent with the market rules of PJM Interconnection, LLC.(E) The availability and utilization of applicable Federal or State tax credits or exemptions.Amend Bill, page 8, line 20, by striking out "and"Amend Bill, page 8, line 23, by striking out the period after "evaluator" and inserting ; and(iv) the procurement of the energy storage system demonstrates the ability to provide measurable reliability, resiliency or peak demand reduction benefits to the distribution system.Amend Bill, page 9, line 4, by striking out "(k)" and inserting (n)Amend Bill, page 9, lines 17 through 19, by striking out all of lines 17 and 18 and "(iv)" in line 19 and inserting (iii)Amend Bill, page 9, line 21, by striking out "(v)" and inserting (iv)Amend Bill, page 9, line 25, by inserting after "the" Consumer Protection and Professional Licensure Committee of the Senate, the Consumer Protection, Technology and Utilities Committee of the House of Representatives, theAmend Bill, page 9, lines 28 through 30; page 10, lines 1 through 14; by striking out all of said lines on said pages and inserting (o) Cost recovery.--(1) An electric distribution company may recover on a full and current basis from customers, through a reconcilable adjustment clause under section 1307 (relating to sliding scale of rates; adjustments), all reasonable and prudent costs in the procurement of energy storage systems under a competitive procurement process under this section, as approved by the commission.2026/90NAD/HB2380A03553 - 8 -1234567891011121314151617181920212223242526272829303132333435363738 (2) Any decreased revenues of an electric distribution company due to changes in energy demand or avoided infrastructure costs shall not be a recoverable cost under a reconcilable automatic adjustment clause.(3) The commission shall promulgate rules or regulations to ensure that all avoided infrastructure costs and revenues generated through participation in wholesale markets are credited in full against the recoverable costs under a reconcilable adjustment clause. For the purposes of this paragraph, each electric distribution company shall establish a methodology for calculating the avoided infrastructure costs of the distribution system and transmission system attributable to the services of the procured energy storage systems.(4) The commission shall establish a cost allocation methodology to ensure that:(i) All recoverable costs are financed by the same customer class that will receive direct benefits from the services attributable to the procurement of energy storage systems.(ii) The distribution system benefits attributable to each customer class are reflected.(iii) The allocation of costs account for all existing surcharges and commission-approved tariffs applicable to the peak demands of large industrial and commercial customers.(p) Applicability.--This section shall not apply to:(1) An electric distribution company with fewer than 500,000 customers.(2) Energy storage systems with less than 50 kilowatts of capacity.(q) Construction.--Nothing in this section shall be construed to conflict or supersede the jurisdiction of the Federal Energy Regulatory Commission or the rules or tariffs of the independent system operator or its functional equivalent.Amend Bill, page 10, line 15, by striking out "(n)" and inserting (r)Amend Bill, page 10, by inserting between lines 27 and 28"Front-of-the-meter energy storage system." An energy storage system interconnected to the distribution or transmission system and capable of participating in the wholesale market or distribution system grid services.Amend Bill, page 10, by inserting after line 30"Multiday storage." An energy storage system that is capable of dispatching energy at its full rated nameplate capacity for a 2026/90NAD/HB2380A03553 - 9 -12345678910111213141516171819202122232425262728293031323334353637383940414243444546 period of 24 hours or more.2026/90NAD/HB2380A03553 - 10 -1

Official text from the Pennsylvania Legislature. Formatting has been adapted for reading on Ratifi.