Ratifi Español Sign in
Ratifi

Federal bills from Congress.gov. State bills from Open States.

HB 2264Session 2025-2026

What changed between versions

5 paragraphs changed+67 words added−816 removed

Highlighted text was added in the newer version. Struck-through text was removed.

H2264B2962A03084 NAD:AAS 04/28/26 #90 A03084AMENDMENTS TO HOUSE BILL NO. 2264Sponsor: REPRESENTATIVE DAVIDSONPrinter's No. 2962Amend Bill, page 1, by inserting after line 18(2) The electric distribution company shall demonstrate that the proposal is cost effective using a cost-benefit analysis determined by the commission, which shall include an analysis of the electric distribution company's estimated administrative costs.Amend Bill, page 2, line 1, by striking out "(2)" and inserting (3)Amend Bill, page 2, line 13, by striking out "(3)" and inserting (4)Amend Bill, page 2, lines 26 through 28, by striking out all of lines 26 and 27 and "(3)" in line 28 and inserting (2)Amend Bill, page 3, line 11, by striking out "(4)" and inserting (3)Amend Bill, page 3, line 15, by inserting after "company" or participating aggregatorAmend Bill, page 3, line 30, by striking out "(5)" and inserting (4)Amend Bill, page 4, line 6, by inserting after "Receive" or manageAmend Bill, page 4, line 9, by striking out "(6)" and 2026/90NAD/HB2264A03084 - 1 -1234567891011121314151617181920212223242526

inserting (5)Amend Bill, page 4, line 14, by striking out "(7)" and inserting (6)Amend Bill, page 4, lines 18 and 19, by striking out "but may not impose a penalty for nonperformance "Amend Bill, page 4, line 20, by striking out "(8)" and inserting (7)Amend Bill, page 4, line 30, by striking out "(9)" and inserting (8)Amend Bill, page 5, lines 5 through 20, by striking out all of said lines and inserting (9) Prohibit a participant from receiving compensation under the program for a grid service that is simultaneously compensated under a Federal, regional transmission organization or electric distribution company demand response or load management program unless the grid service is separate and distinct from those performed under the program.Amend Bill, page 5, line 21, by striking out "(12)" and inserting (10)Amend Bill, page 5, by inserting between lines 22 and 23(11) Allow eligible demand response resources located at commercial and industrial sites to participate in the program.Amend Bill, page 5, by inserting between lines 26 and 27(2) The commission shall ensure that each program does not interfere with wholesale energy, capacity or ancillary service markets and operates in a manner consistent with the market rules of the regional transmission organization in which the applicable electric distribution company participates.2026/90NAD/HB2264A03084 - 2 -1234567891011121314151617181920212223242526272829303132333435

Amend Bill, page 5, line 27, by striking out "(2)" and inserting (3)Amend Bill, page 6, line 2, by striking out "(3)" and inserting (4)Amend Bill, page 6, line 5, by striking out "(4)" and inserting (5)Amend Bill, page 6, line 12, by striking out "(5)" and inserting (6)Amend Bill, page 6, by inserting between lines 14 and 15(7) In addition to receiving performance-based compensation, the commission shall adopt rules or promulgate regulations to compensate the energy exported from enrolled devices at a value commensurate with the benefits provided to the electric grid at the time of export.(8) The commission shall require each electric distribution company to use advanced metering infrastructure hourly usage for the following:(i) To calculate each customer's peak load contribution and network service peak load contribution.(ii) To perform a customer's load settlement in the regional transmission organization in which the applicable electric distribution company participates.Amend Bill, page 6, line 15, by striking out "services.--A program shall be administered" and inserting services.--(1) A program shall be administeredAmend Bill, page 6, by inserting between lines 19 and 20(2) An electric distribution company may not promote or advertise the program in a manner that gives unreasonable preference to the electric distribution company over competitive aggregator offerings.Amend Bill, page 8, lines 8 through 12, by striking out all of lines 8 through 11 and "(iv)" in line 12 and inserting 2026/90NAD/HB2264A03084 - 3 -12345678910111213141516171819202122232425262728293031323334353637

(iii)Amend Bill, page 8, line 14, by striking out "(v)" and inserting (iv)Amend Bill, page 8, line 15, by striking out "(vi)" and inserting (v)Amend Bill, page 8, by inserting between lines 28 and 29(4) An evaluation of the cost effectiveness of expenditures.Amend Bill, page 8, line 29, by striking out "(4)" and inserting (5)Amend Bill, page 8, line 30, by striking out "(5)" and inserting (6)Amend Bill, page 9, line 15, by striking out "An eligible technology device" and inserting A technologyAmend Bill, page 9, line 24, by striking out "Technology" and inserting A distributed energy resourceAmend Bill, page 10, line 19, by inserting after "service" where it occurs the second time or service relating to the transmission or distribution systemAmend Bill, page 10, line 30, by striking out the period after "event" and inserting , which may include a reservation payment per kilowatt or performance payment per kilowatt hour or both.2026/90NAD/HB2264A03084 - 4 -123456789101112131415161718192021222324252627282930

H2264B2962A03165 IBD:JMT 05/01/26 #90 A03165AMENDMENTS TO HOUSE BILL NO. 2264Sponsor: REPRESENTATIVE FIEDLERPrinter's No. 2962Amend Bill, page 7, by inserting between lines 19 and 20(4) The commission may establish annual caps on the total program costs recoverable from ratepayers if the rate cap is in the public interest and does not significantly reduce future participation in the program.2026/90IBD/HB2264A03165 - 1 -12345

Back to the full text