Ratifi Español Sign in
Ratifi

Federal bills from Congress.gov. State bills from Open States.

HB 2223Session 2025-2026

An Act amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in service and facilities, providing for advanced transmission technologies.

House Amendment A02861

H2223B2952A02861 AJB:EJH 04/09/26 #90 A02861AMENDMENTS TO HOUSE BILL NO. 2223Sponsor: REPRESENTATIVE FIEDLERPrinter's No. 2952Amend Bill, page 1, lines 9 through 18; page 2, lines 1 through 19; by striking out all of said lines on said pages and inserting (a) Applicability.--This section shall apply to each transmission siting application filed with the commission under 52 Pa. Code Ch. 57 Subch. G (relating to commission review of siting and construction of electric transmission lines) and each letter of notification in lieu of application filed with the commission under 52 Pa. Code Ch. 57 (relating to electric service).(b) Evidence of evaluation.--An applicant shall provide to the commission evidence that the applicant evaluated and assessed the use of advanced transmission technologies for any of the following:(1) Existing transmission infrastructure.(2) Proposed transmission infrastructure and upgrades identified in the application or letter of notification, including infrastructure for which the proposed voltage would be increased above existing levels and infrastructure that would be reconductored or reconstructed within the jurisdiction of the commission.(c) Commission determination.--The commission may not grant an application or approve a letter of notification under subsection (a), either as proposed or as modified, unless the commission determines, in addition to any other applicable requirements under State law, that the proposed transmission infrastructure incorporates all technically feasible and cost-effective advanced transmission technologies.(d) Commission requirements.--No later than one year after the effective date of this subsection, the commission shall adopt regulations, orders or statements of policy specifying the advanced transmission technology assessment requirements and methods that an applicant shall use to satisfy subsection (b).Amend Bill, page 2, line 20, by striking out "(c)" and inserting 2026/90AJB/HB2223A02861 - 1 -1234567891011121314151617181920212223242526272829303132333435 (e)Amend Bill, page 2, line 22, by inserting after "of" StateAmend Bill, page 2, line 24, by striking out "(d)" and inserting (f)Amend Bill, page 2, line 29, by striking out "and relieve congestion"Amend Bill, page 2, line 30; page 3, lines 1 through 6; by striking out all of said lines on said pages and inserting "Advanced transmission technologies." Any of the following:(1) Grid-enhancing technologies, including dynamic line rating, advanced power flow controller and topology optimization software.(2) High-performance conductors.(3) Any other technology identified by the commission that may avoid the construction of new transmission infrastructure, increase the capacity, efficiency or reliability of the transmission system, reduce transmission system congestion, reduce environmental impacts or provide other benefits to the transmission system."Aluminum conductor steel reinforced conductor." A stranded overhead electrical conductor composed of one or more layers of hard-drawn aluminum wire helically laid around a central core of galvanized or otherwise coated steel strands, designed to provide enhanced tensile strength and electrical conductivity for transmission or distribution applications.Amend Bill, page 3, line 7, by striking out "or" and inserting andAmend Bill, page 3, lines 11 through 20, by striking out all of said lines and inserting "High-performance conductor." A conductor used in an electric transmission system, including a carbon fiber conductor, composite core conductor or superconductor, that has all of the following:(1) A similar diameter and weight as a traditional aluminum conductor steel reinforced conductor.(2) A direct electrical resistance that is at least 10% lower than a traditional aluminum conductor steel reinforced 2026/90AJB/HB2223A02861 - 2 -12345678910111213141516171819202122232425262728293031323334353637383940 conductor of a similar diameter and weight.(3) An energy-carrying capacity that is at least 75% greater than a traditional aluminum conductor steel reinforced conductor of a similar diameter and weight."Topology optimization software." Software that identifies switching configurations to reroute electricity and alleviate transmission constraints.2026/90AJB/HB2223A02861 - 3 -1234567

Official text from the Pennsylvania Legislature. Formatting has been adapted for reading on Ratifi.