[First Reprint]
ASSEMBLY ENVIRONMENT AND SOLID WASTE COMMITTEE
STATEMENT TO
ASSEMBLY, No. 3763
with committee amendments
STATE OF NEW JERSEY
222nd LEGISLATURE
PRE-FILED FOR INTRODUCTION IN THE 2026 SESSION
Sponsored by:
Assemblywoman ALIXON COLLAZOS-GILL
District 27 (Essex and Passaic)
Co-Sponsored by:
Assemblyman Sampson and Assemblywoman Rowan
SYNOPSIS
"Construction Containment and Pollution Prevention Act"; requires contractors to use containment devices to prevent release of certain pollutants outside of worksites.
CURRENT VERSION OF TEXT
DATED: MARCH 16, 2026
As reported by theThe Assembly Environment and Solid Waste Committee onreports Marchfavorably 16, 2026,and with committee amendments Assembly Bill No. 3763.
An Act concerning containment of contractor pollution and supplementing Title 56 of the Revised Statutes.
Be It Enacted by the Senate and General Assembly of the State of New Jersey:
1. This act shall be known and may be cited as the “Construction Containment and Pollution Prevention Act.”
2. As used in this act:
“Department” means the Department of Community Affairs.
“Containment device” means any physical barrier, tent, hood, enclosure, filter, vacuum attachment, tarp, or wet‐cutting apparatus designed to prevent the escape of dust, debris, microplastics, or other pollutants from a worksite.
As amended, this bill, which would be known as the “Construction Containment and Pollution Prevention Act,” requires contractors to take certain steps to mitigate the release and properly dispose of dust, debris, microplastics and other pollutants. The bill requires all contractors to employ physical barriers, vacuum or wet-cutting systems, tarps, enclosures, and inlet filters to prevent dust, debris, microplastics, and other pollutants from escaping a worksite.
This bill requires contractors to employ containment devices, such as vacuum attachments or wet-cutting systems; fully enclosed work areas, tarps or drop cloths; inlet protection, filtration, sediment controls, or equivalent runoff-control measures; and to perform daily cleanup of dust, debris, microplastics, and other pollutants. Under the bill, contractors would be required to prepare, distribute, and periodically update on-site educational materials that explain the bill’s requirements, and illustrate proper device setup, describe health risks and penalties.
Contractors would also be required to inhibit the discharge of any worksite waste into the open air, soil, streets, storm drains, waterways, or other drainage infrastructure and dispose of all materials in accordance with the “Solid Waste Management Act” and applicable local ordinances.
To ensure compliance with the act, the Department of Community Affairs (department), or local construction officials, would be authorized to inspect worksites to enforce the bill’s provisions. In addition, in administering and implementing the bill’s provisions, the department would be authorized to consult with the Department of Environmental protection when necessary. Under the bill, a contractor that violates certain provisions of the bill would be subject to: (1) a warning citation for the first violation; (2) a fine of up to $1,000 for a second violation; and (3) a fine of up to $5,000 for each subsequent violation. Each day a violation continues would constitute a distinct and separate offense.
This bill was prefiled for introduction in the 2026-2027 session pending technical review. As reported, the bill includes the changes required by technical review, which has been performed.
COMMITTEE AMENDMENTS :
The committee amended the bill to:
(1) revise the definition of “Contractorcontractor” meansto mean any 1 [ individual, firm, partnership, association, or corporation engaged in ] person or business entity performing 1 construction, renovation, demolition, or 1 permit-required 1 maintenance 1 [ activities on any commercial or residential property in this State ] that involves a covered activity 1 .;
1 “Covered activity” means any construction, renovation, demolition, or permit-required maintenance operation that generates, or is reasonably likely to generate, dust, debris, sediment, plastic fragments, slurry, or other particulate pollutants capable of depositing into the soil, leaving the worksite, entering storm drains, waterways, or adjoining property, or dispersing into the open air. 1
“Worksite” means any location in this State where construction, renovation, demolition, or related contractor activities are being performed.
3. a. A contractor shall employ containment devices in order to prevent the release of dust, debris, microplastics, and other pollutants into the soil 1 [ or ] , 1 water 1 , or open air 1 at the worksite, as well as beyond the worksite boundaries.
b. At a minimum, the contractor shall ensure that when cutting, drilling, sanding, or performing any 1 covered 1 activity 1 [ that generates dust or particulate matter ] 1 :
(1) a vacuum attachment or wet‐cutting system is used;
(2) all such 1 covered 1 activities are conducted within an enclosure or through the use of containment measures, including tent hoods, vacuums, or other comparable devices, that reasonably prevent the release of airborne or physical debris;
(3) a tarp or drop cloth is positioned beneath all power tools or work areas to capture falling particles and fragments;
(4) daily cleanup of all generated waste including dust, film plastics, and other solids is completed before leaving the worksite; and
(2) add a definition for the term “covered activity” and replace references to activity in the bill with references to covered activity;
(3) add open air and soil to the list of locations into which a contractor must prevent worksite waste being released;
(54) 1remove [the filtersrequirement meetingthat Americancontractors Societymeet ASTM-specific inlet filter requirements and instead require contractors, for Testing and Material specifications D4491, D4751, and D4355 are installed at any stormwater inlet receiving runoff from the worksite ] if a covered activity that may result in runoff entering a storm drain, drainage structure, or surface water, the contractor shallto install and maintain inlet protection, filtration, sediment controls, or equivalent runoff-control measures in accordance with standards adopted by the department, in consultation with the Department of Environmental Protection 1 .;
c. A contractor shall maintain records demonstrating use of containment devices and proper disposal practices, and make such records available for inspection by the department for a period of two years.
d. A contractor shall prepare and distribute to all employees and subcontractors working on the worksite educational materials that:
(1) explain the key requirements of this act, including when and how to use containment devices, perform daily cleanup, and install stormwater filters; describe the risks, such as public health hazards; describe the construction contractor penalties for non-compliance; and include simple diagrams illustrating the correct setup of vacuum attachments, enclosures, tarps, and filters; 1 and 1
(2) require an on-site briefing before work begins, with a brief checklist to confirm understanding; and review and update educational materials whenever the department issues new guidance.
4. A contractor shall not discharge, sweep, blow, or otherwise deposit pollutants generated on the worksite into 1 the open air, soil, 1 public streets, storm drains, waterways, or other drainage infrastructure. All waste shall be collected and disposed of in accordance with the “Solid Waste Management Act” P.L.1970, c.39 (C.13:1E-1 et seq.) and any applicable local ordinances.
5. a. The department, or a local construction official, shall have the authority to inspect any worksite to ensure compliance with this act.
(5) stipulate that the Department of Community Affairs may work in consultation with the Department of Environmental Protection in administering and implementing the provisions of the bill; and
b.(6) 1 In administering and implementingrequire the provisionsDepartment of thisCommunity act,Affairs theto departmentwork mayin consultconsultation with the Department of Environmental Protection, asto necessaryadopt rules and regulations relating to the implementation of the bill.
c. 1 A contractor that violates the provisions of section 3 or 4 of this act shall be subject to penalty as follows:
(1) a warning citation for the first violation;
(2) a fine of up to $1,000 for a second violation; and
(3) a fine of up to $5,000 for each subsequent violation.
1 [ c. ] d. 1 Each day a violation continues shall constitute a distinct and separate offense.
1 [ d. ] e. 1 The penalty prescribed by this section shall be collected and enforced by summary proceedings under the "Penalty Enforcement Law of 1999," P.L.1999, c.274 (C.2A:58-10 et seq.). The Superior Court shall have jurisdiction to enforce the “Penalty Enforcement Law of 1999” in connection with this act. 1 [ . ] 1
1 [ e. ] f. 1 Nothing in this act shall preclude the department from seeking injunctive relief to prevent imminent or ongoing harm to the environment or public health.
6. The department 1 , in consultation with the Department of Environmental Protection, 1 shall, in accordance with the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.), adopt rules and regulations as necessary to implement this act.
7. This act shall take effect on the 90th day following enactment and shall apply to all construction permits issued on or after that date.