94th Legislature (2025 - 2026)
SF1393
Introduction
1st Engrossment
SF 1393
Introduction1st Engrossment - 94th Legislature (2025 - 2026)
Posted on 0311/2705/2025 1101:1358 ap.m.
Bill Text Versions
4 unchanged paragraphs
Engrossments
Introduction PDF
Posted on 02/12/2025
1st Engrossment PDF
Posted on 03/27/2025
A bill for an act relating to energy; providing for data center energy generation redundancy; amending Minnesota Statutes 2024, sections 116D.04, subdivision 4a; 216B.02, by adding a subdivisionsubdivisions; 216B.243, subdivision 8; 216I.02, by adding a subdivision; 216I.07, subdivisionsubdivisions 2; 216I.08, subdivision 23.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
4 unchanged paragraphs
Section 1.
Minnesota Statutes 2024, section 116D.04, subdivision 4a, is amended to read:
Subd. 4a.
Alternative review.
new text begin (a) new text end The board shall by rule identify alternative forms of environmental review which will address the same issues and utilize similar procedures as an environmental impact statement in a more timely or more efficient manner to be utilized in lieu of an environmental impact statement.
new text begin (b) Upon adoption by the responsible governmental unit of the environmental analysis document and plan for mitigation under an alternative urban areawide review process, the prerequisites under subdivision 2b are satisfied with respect to the activities covered by the alternative urban areawide reviewand notwithstanding any additional environmental review that may otherwise be required for a phased action, or connected action, or project component of the project that was not evaluated in the alternative urban areawide review. The governmental unit that completes additionalprocess, environmental review requiredis forcomplete otherand phasedthe actionsprerequisites under subdivision 2b are satisfied with regards to the anticipated residential, connected actionscommercial, componentswarehousing, orand light industrial development projects underthat thisare sectionconsistent mustwith completedevelopment assumptions within the additionalestablished environmentalboundaries reviewof asthe ageographic supplemental analysisarea to which the alternative urban areawide review, unless otherwise agreed by the proposerapplies. new text end
new text begin EFFECTIVE DATE. new text end
8 unchanged paragraphs
new text begin This section is effective the day following final enactment. new text end
Sec. 2.
Minnesota Statutes 2024, section 216B.02, is amended by adding a subdivision to read:
new text begin Subd. 11. new text end
new text begin Emergency backup generator. new text end
new text begin "Emergency backup generator" means a stationary compressed ignition or spark ignition engine described under Code of Federal Regulations, title 40, parts 60.4211(f) and 60.4243(d), respectively, that is installed with equipment that prevents the flow of electricity to the electric grid. new text end
new text begin EFFECTIVE DATE. new text end
new text begin This section is effective the day following final enactment. new text end
Sec. 3.
Minnesota Statutes 2024, section 216B.02, is amended by adding a subdivision to read:
new text begin Subd. 12. new text end
new text begin Data center. new text end
new text begin "Data center" means a freestanding structure that primarily contains electronic equipment used to process, store, and transmit digital information. new text end
Sec. 4.
Minnesota Statutes 2024, section 216B.243, subdivision 8, is amended to read:
15 unchanged paragraphs
Subd. 8.
Exemptions.
(a) This section does not apply to:
(1) cogeneration or small power production facilities as defined in the Federal Power Act, United States Code, title 16, section 796, paragraph (17), subparagraph (A), and paragraph (18), subparagraph (A), and having a combined capacity at a single site of less than 80,000 kilowatts; plants or facilities for the production of ethanol or fuel alcohol; or any case where the commission has determined after being advised by the attorney general that its application has been preempted by federal law;
(2) a high-voltage transmission line proposed primarily to distribute electricity to serve the demand of a single customer at a single location, unless the applicant opts to request that the commission determine need under this section or section 216B.2425;
(3) the upgrade to a higher voltage of an existing transmission line that serves the demand of a single customer that primarily uses existing rights-of-way, unless the applicant opts to request that the commission determine need under this section or section 216B.2425;
(4) a high-voltage transmission line of one mile or less required to connect a new or upgraded substation to an existing, new, or upgraded high-voltage transmission line;
(5) conversion of the fuel source of an existing electric generating plant to using natural gas;
(6) the modification of an existing electric generating plant to increase efficiency, as long as the capacity of the plant is not increased more than ten percent or more than 100 megawatts, whichever is greater;
(7) a large wind energy conversion system, as defined in section 216I.02, subdivision 12, or a solar energy generating system, as defined in section 216I.02, subdivision 18, for which a site permit application is submitted by an independent power producer under chapter 216I;
(8) a large wind energy conversion system, as defined in section 216I.02, subdivision 12, or a solar energy generating system, as defined in section 216I.02, subdivision 18, engaging in a repowering project that:
(i) will not result in the system exceeding the nameplate capacity under its most recent interconnection agreement; or
(ii) will result in the system exceeding the nameplate capacity under its most recent interconnection agreement, provided that the Midcontinent Independent System Operator has provided a signed generator interconnection agreement that reflects the expected net power increase;
(9) energy storage systems, as defined in section 216I.02, subdivision 6;
(10) transmission lines that directly interconnect large wind energy conversion systems, solar energy generating systems, or energy storage systems to the transmission system; deleted text begin or deleted text end
(11) relocation of an existing high voltage transmission line to new right-of-way, provided that any new structures that are installed are not designed for and capable of operation at higher voltagedeleted text begin .deleted text end new text begin ; or new text end
new text begin (12) a combination of emergency backup generators at a single site with a combined capacity of 50,000 kilowatts or more that provides power to a data center and is eligible for permitting as a single stationary source under Minnesota Rules, parts 7007.0200, 7007.0250, 7007.1100, or 7007.1110 to 7007.1141. new text end
(b) For the purpose of this subdivision, "repowering project" means:
4 unchanged paragraphs
(1) modifying a large wind energy conversion system or a solar energy generating system that is a large energy facility to increase its efficiency without increasing its nameplate capacity;
(2) replacing turbines in a large wind energy conversion system without increasing the nameplate capacity of the system; or
(3) increasing the nameplate capacity of a large wind energy conversion system.
new text begin EFFECTIVE DATE; APPLICATION. new text end
new text begin This section is effective the day following final enactment and applies to applications under Minnesota Statutes, section 216B.243, that are pending before or submitted to the Public Utilities Commission on or after that date. new text end
Sec. 45.
Minnesota Statutes 2024, section 216I.02, is amended by adding a subdivision to read:
4 unchanged paragraphs
new text begin Subd. 5a. new text end
new text begin Emergency backup generator. new text end
new text begin "Emergency backup generator" has the meaning given in section 216B.02, subdivision 11. new text end
new text begin EFFECTIVE DATE. new text end
new text begin This section is effective the day following final enactment. new text end
Sec. 56.
Minnesota Statutes 2024, section 216I.07, subdivision 2, is amended to read:
12 unchanged paragraphs
Subd. 2.
Applicable projects.
The requirements and procedures under this section apply to projects for which the applicant's proposal is:
(1) large electric power generating plants with a capacity of less than 80 megawatts;
new text begin (2) a combination of emergency backup generators designed to serve one person and located on property owned or controlled by the person; new text end
deleted text begin (2)deleted text end new text begin (3) new text end large electric power generating plants that are fueled by natural gas;
deleted text begin (3)deleted text end new text begin (4) new text end high-voltage transmission lines with a capacity between 100 and 300 kilovolts;
deleted text begin (4)deleted text end new text begin (5) new text end high-voltage transmission lines with a capacity in excess of 300 kilovolts and less than 30 miles in length in Minnesota;
deleted text begin (5)deleted text end new text begin (6) new text end high-voltage transmission lines with a capacity in excess of 300 kilovolts, if at least 80 percent of the distance of the line in Minnesota, as proposed by the applicant, is located along existing high-voltage transmission line right-of-way;
deleted text begin (6)deleted text end new text begin (7) new text end solar energy systems;
deleted text begin (7)deleted text end new text begin (8) new text end energy storage systems; and
deleted text begin (8)deleted text end new text begin (9) new text end large wind energy conversion systems.
new text begin EFFECTIVE DATE; APPLICATION. new text end
new text begin This section is effective theJuly day1, following final enactment2025, and applies to applications under Minnesota Statutes, section 216I.07, that are pending before or submitted to the Public Utilities Commission on or after that date. new text end
Sec. 67.
Minnesota Statutes 2024, section 216I.0807, subdivision 23, is amended to read:
Subd. 23.
Applicable projects.
An applicant may seek approval under this section from a local unit of government to construct:
(1) large electric power generating plants and solar energy generating systems with a capacity of less than 80 megawatts;
new text begin (2) a combination of emergency backup generators designed to serve one person and located on property owned or controlled by the person; new text end
deleted text begin (2)deleted text end new text begin (3) new text end large electric power generating plants of any size that burn natural gas and are intended to be a peaking plant;
deleted text begin (3)deleted text end new text begin (4) new text end high-voltage transmission lines with a capacity between 100 and 200 kilovolts;
deleted text begin (4)deleted text end new text begin (5) new text end substations with a voltage designed for and capable of operation at a nominal voltage of 100 kilovolts or more;
deleted text begin (5)deleted text end new text begin (6) new text end a high-voltage transmission line service extension to a single customer between 200 and 300 kilovolts and less than ten miles in length;
deleted text begin (6)deleted text end new text begin (7) new text end a high-voltage transmission line rerouting to serve the demand of a single customer, if at least 80 percent of the rerouted line is located on property owned or controlled by the customer or the owner of the transmission line;
deleted text begin (7)deleted text end new text begin (8) new text end energy storage systems; and
deleted text begin (8)deleted text end new text begin (9) new text end large wind energy conversion systems with a capacity less than 25 megawatts.
new text begin EFFECTIVE DATE; APPLICATION. new text end
new text begin This section is effective the day following final enactment and applies to applications under Minnesota Statutes, section 216I.08, that are pending before or submitted to a local unit of government on or after that date. new text end
Environmental review.
(a) For the projects identified in subdivision 2 and following the procedures under this section, the applicant must prepare and submit an environmental assessment with the application. A draft of the environmental assessment must also be provided to commission staff as part of the preapplication review under section 216I.05, subdivision 6. The environmental assessment must (1) contain information regarding the proposed project's human and environmental impacts, and (2) address mitigating measures for identified impacts. new text begin The environmental assessment for projects identified in subdivision 2, clause (2), must also include a discussion of reasonable alternatives to the proposed project considering (i) the appropriateness of the size and type of the proposed method of generation compared to those of reasonable alternatives; (ii) the cost to the proposer of energy to be supplied by the project compared to the cost of energy that would be supplied by reasonable alternatives; (iii) the effects of the proposed project upon the natural and socioeconomic environments compared to the effects of reasonable alternatives; and (iv) the expected reliability of the proposed facility compared to the expected reliability of reasonable alternatives. new text end The environmental assessment is the only state environmental review document that must be prepared for the proposed project.
(b) If after the public meeting the commission identifies other sites or routes or potential impacts for review, the commission must prepare an addendum to the environmental assessment that evaluates (1) the human and environmental impacts of the alternative site or route, and (2) any additional mitigating measures related to the identified impacts consistent with the scoping decision made pursuant to section 216I.06, subdivision 10, clause (2). The public may provide comments on the environmental assessment and any addendum to the environmental assessment at the public hearing and comment period under subdivision 4. When making the commission's final decision, the commission must consider the environmental assessment, the environmental assessment addendum, if any, and the entirety of the record related to human and environmental impacts.
Historical Information
14 unchanged paragraphs
Employment/Internships
Visiting the Capitol
Accessibility
Frequently Asked Questions
Who Represents Me?
House Members
Senators
Contact a legislative librarian:
(651) 296-8338 or Email
Phone Numbers
Submit website comments
House News
Senate News
MyBills
Email Updates & RSS Feeds