Ratifi Español Sign in
Ratifi

Federal bills from Congress.gov. State bills from Open States.

HF 28Session 2025-2026

What changed between versions

23 paragraphs changed+39 words added−436 removed

Highlighted text was added in the newer version. Struck-through text was removed.

House

19 unchanged paragraphs

Senate

Joint

Schedules

Committees

Bills

Law

Multimedia

Publications

Office of the Revisor of Statutes

Retrieve by number Document type Statutes Laws Rules Bills GO

Statutes

Laws

Rules

Court Rules

Constitution

Revisor's Office Revisor Intranet Attorney Drafting Areas Staff Directory Office Duties Publications Educational Seminars Employment Openings Order Publications

Search Law by Keyword

Bills

94th Legislature (2025 - 2026)

HF28

1st2nd Engrossment

HF 28

1st2nd Engrossment - 94th Legislature (2025 - 2026)

Posted on 0203/1712/2025 0412:0834 p.m.

Bill Text Versions

6 unchanged paragraphs

Engrossments

Introduction PDF

Posted on 02/07/2025

1st Engrossment PDF

Posted on 02/17/2025

2nd Engrossment PDF

Posted on 03/03/2025

A bill for an act relating to energy; providing for data center energy generation redundancy; amending Minnesota Statutes 2024, sections 116D.04, subdivision 4a; 216B.02, by adding subdivisions; 216B.243, subdivision 8; 216I.02, by adding a subdivision; 216I.07, subdivision 2; 216I.08, subdivision 2.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:

4 unchanged paragraphs

Section 1.

Minnesota Statutes 2024, section 116D.04, subdivision 4a, is amended to read:

Subd. 4a.

Alternative review.

new text begin (a) new text end The board shall by rule identify alternative forms of environmental review which will address the same issues and utilize similar procedures as an environmental impact statement in a more timely or more efficient manner to be utilized in lieu of an environmental impact statement.

new text begin (b) Upon adoption by the responsible governmental unit of the environmental analysis document and plan for mitigation under an alternative urban areawide review process, the prerequisites under subdivision 2b are satisfied with respect to the activities covered by the alternative urban areawide reviewand notwithstanding any additional environmental review that may otherwise be required for a phased action, connected action, or project component of the project that was not evaluated in the alternative urban areawide review. The governmental unit that completes additionalprocess, environmental review requiredis forcomplete otherand phasedthe actions,prerequisites connectedunder actions,subdivision components,2b orare satisfied with regards to anticipated development projects under this section must completewithin the additionalestablished environmentalboundaries reviewof asthe ageographic supplemental analysisarea to which the alternative urban areawide review, unless otherwise agreed by the proposerapplies. new text end

new text begin EFFECTIVE DATE. new text end

30 unchanged paragraphs

new text begin This section is effective the day following final enactment. new text end

Sec. 2.

Minnesota Statutes 2024, section 216B.02, is amended by adding a subdivision to read:

new text begin Subd. 11. new text end

new text begin Emergency backup generator. new text end

new text begin "Emergency backup generator" means a stationary compressed ignition or spark ignition engine described under Code of Federal Regulations, title 40, parts 60.4211(f) and 60.4243(d), respectively, that is installed with equipment that prevents the flow of electricity to the electric grid. new text end

new text begin EFFECTIVE DATE. new text end

new text begin This section is effective the day following final enactment. new text end

Sec. 3.

Minnesota Statutes 2024, section 216B.02, is amended by adding a subdivision to read:

new text begin Subd. 12. new text end

new text begin Data center. new text end

new text begin "Data center" means a freestanding structure that primarily contains electronic equipment used to process, store, and transmit digital information. new text end

Sec. 4.

Minnesota Statutes 2024, section 216B.243, subdivision 8, is amended to read:

Subd. 8.

Exemptions.

(a) This section does not apply to:

(1) cogeneration or small power production facilities as defined in the Federal Power Act, United States Code, title 16, section 796, paragraph (17), subparagraph (A), and paragraph (18), subparagraph (A), and having a combined capacity at a single site of less than 80,000 kilowatts; plants or facilities for the production of ethanol or fuel alcohol; or any case where the commission has determined after being advised by the attorney general that its application has been preempted by federal law;

(2) a high-voltage transmission line proposed primarily to distribute electricity to serve the demand of a single customer at a single location, unless the applicant opts to request that the commission determine need under this section or section 216B.2425;

(3) the upgrade to a higher voltage of an existing transmission line that serves the demand of a single customer that primarily uses existing rights-of-way, unless the applicant opts to request that the commission determine need under this section or section 216B.2425;

(4) a high-voltage transmission line of one mile or less required to connect a new or upgraded substation to an existing, new, or upgraded high-voltage transmission line;

(5) conversion of the fuel source of an existing electric generating plant to using natural gas;

(6) the modification of an existing electric generating plant to increase efficiency, as long as the capacity of the plant is not increased more than ten percent or more than 100 megawatts, whichever is greater;

(7) a large wind energy conversion system, as defined in section 216I.02, subdivision 12, or a solar energy generating system, as defined in section 216I.02, subdivision 18, for which a site permit application is submitted by an independent power producer under chapter 216I;

(8) a large wind energy conversion system, as defined in section 216I.02, subdivision 12, or a solar energy generating system, as defined in section 216I.02, subdivision 18, engaging in a repowering project that:

(i) will not result in the system exceeding the nameplate capacity under its most recent interconnection agreement; or

(ii) will result in the system exceeding the nameplate capacity under its most recent interconnection agreement, provided that the Midcontinent Independent System Operator has provided a signed generator interconnection agreement that reflects the expected net power increase;

(9) energy storage systems, as defined in section 216I.02, subdivision 6;

(10) transmission lines that directly interconnect large wind energy conversion systems, solar energy generating systems, or energy storage systems to the transmission system; deleted text begin or deleted text end

(11) relocation of an existing high voltage transmission line to new right-of-way, provided that any new structures that are installed are not designed for and capable of operation at higher voltagedeleted text begin .deleted text end new text begin ; or new text end

new text begin (12) a combination of emergency backup generators at a single site with a combined capacity of 50,000 kilowatts or more that provides power to a data center and is eligible for permitting as a single stationary source under Minnesota Rules, partspart 7007.1140 to 7007.11470250. new text end

(b) For the purpose of this subdivision, "repowering project" means:

26 unchanged paragraphs

(1) modifying a large wind energy conversion system or a solar energy generating system that is a large energy facility to increase its efficiency without increasing its nameplate capacity;

(2) replacing turbines in a large wind energy conversion system without increasing the nameplate capacity of the system; or

(3) increasing the nameplate capacity of a large wind energy conversion system.

new text begin EFFECTIVE DATE; APPLICATION. new text end

new text begin This section is effective the day following final enactment and applies to applications under Minnesota Statutes, section 216B.243, that are pending before or submitted to the Public Utilities Commission on or after that date. new text end

Sec. 5.

Minnesota Statutes 2024, section 216I.02, is amended by adding a subdivision to read:

new text begin Subd. 5a. new text end

new text begin Emergency backup generator. new text end

new text begin "Emergency backup generator" has the meaning given in section 216B.02, subdivision 11. new text end

new text begin EFFECTIVE DATE. new text end

new text begin This section is effective the day following final enactment. new text end

Sec. 6.

Minnesota Statutes 2024, section 216I.07, subdivision 2, is amended to read:

Subd. 2.

Applicable projects.

The requirements and procedures under this section apply to projects for which the applicant's proposal is:

(1) large electric power generating plants with a capacity of less than 80 megawatts;

new text begin (2) a combination of emergency backup generators designed to serve one person and located on property owned or controlled by the person; new text end

deleted text begin (2)deleted text end new text begin (3) new text end large electric power generating plants that are fueled by natural gas;

deleted text begin (3)deleted text end new text begin (4) new text end high-voltage transmission lines with a capacity between 100 and 300 kilovolts;

deleted text begin (4)deleted text end new text begin (5) new text end high-voltage transmission lines with a capacity in excess of 300 kilovolts and less than 30 miles in length in Minnesota;

deleted text begin (5)deleted text end new text begin (6) new text end high-voltage transmission lines with a capacity in excess of 300 kilovolts, if at least 80 percent of the distance of the line in Minnesota, as proposed by the applicant, is located along existing high-voltage transmission line right-of-way;

deleted text begin (6)deleted text end new text begin (7) new text end solar energy systems;

deleted text begin (7)deleted text end new text begin (8) new text end energy storage systems; and

deleted text begin (8)deleted text end new text begin (9) new text end large wind energy conversion systems.

new text begin EFFECTIVE DATE; APPLICATION. new text end

new text begin This section is effective theJuly day1, following final enactment2025, and applies to applications under Minnesota Statutes, section 216I.07, that are pending before or submitted to the Public Utilities Commission on or after that date. new text end

Sec. 7.

Minnesota Statutes 2024, section 216I.08, subdivision 2, is amended to read:

Subd. 2.

Applicable projects.

An applicant may seek approval under this section from a local unit of government to construct:

(1) large electric power generating plants and solar energy generating systems with a capacity of less than 80 megawatts;

new text begin (2) a combination of emergency backup generators designed to serve one person and located on property owned or controlled by the person; new text end

deleted text begin (2)deleted text end new text begin (3) new text end large electric power generating plants of any size that burn natural gas and are intended to be a peaking plant;

deleted text begin (3)deleted text end new text begin (4) new text end high-voltage transmission lines with a capacity between 100 and 200 kilovolts;

deleted text begin (4)deleted text end new text begin (5) new text end substations with a voltage designed for and capable of operation at a nominal voltage of 100 kilovolts or more;

deleted text begin (5)deleted text end new text begin (6) new text end a high-voltage transmission line service extension to a single customer between 200 and 300 kilovolts and less than ten miles in length;

deleted text begin (6)deleted text end new text begin (7) new text end a high-voltage transmission line rerouting to serve the demand of a single customer, if at least 80 percent of the rerouted line is located on property owned or controlled by the customer or the owner of the transmission line;

deleted text begin (7)deleted text end new text begin (8) new text end energy storage systems; and

deleted text begin (8)deleted text end new text begin (9) new text end large wind energy conversion systems with a capacity less than 25 megawatts.

new text begin EFFECTIVE DATE; APPLICATION. new text end

new text begin This section is effective the day following final enactment and applies to applications under Minnesota Statutes, section 216I.08, that are pending before or submitted to a local unit of government on or after that date. new text end

Historical Information

14 unchanged paragraphs

Employment/Internships

Visiting the Capitol

Accessibility

Frequently Asked Questions

Who Represents Me?

House Members

Senators

Contact a legislative librarian:

(651) 296-8338 or Email

Phone Numbers

Submit website comments

House News

Senate News

MyBills

Email Updates & RSS Feeds

Back to the full text