substitute for
HOUSEHouse BILL NO. 5937
A bill to amend 1994 PA 451, entitled
"Natural resources and environmental protection act,"
by amending sections 1301, 1305, 1307,and 3112, and 30307 (MCL 324.1301, 324.1305, 324.1307,and 324.3112, and 324.30307), section 1301 as amended by 2018 PA 451, section 1305 as amended by 2011 PA 246, sections 1307 and 30307 as amended by 2018 PA 631, and section 3112 as amended by 2018 PA 667.
the peoplepeoplE of the state of michigan enact:
Sec. 1301. As used in this part:
68 unchanged paragraphs
(a) "Application period" means the period beginning that begins when an application for a permit is received by the this state and ending ends when the application is considered to be administratively complete under section 1305 and any applicable fee has been is paid.
(b) "Department" means the department, agency, or officer authorized by this act to approve or deny an application for a particular permit. As used in sections 1315 to 1317, "department" means the department of environmental quality.environment, Great Lakes, and energy.
(c) "Director" means the director of the state department authorized under this act to approve or deny an application for a particular permit or the director's designee. As used in sections 1313 to 1317, "director" means the director of the department of environmental quality.environment, Great Lakes, and energy.
(d) "Environmental permit review commission" or "commission" means the environmental permit review commission established under section 1313(1).
(e) "Environmental permit panel" or "panel" means a panel of the environmental permit review commission, appointed under section 1315(2).
(f) "Permit", except as provided in subdivision (g), means a permit, operating license, or registration required by any of the following sections or by rules promulgated thereunder, or, in the case of section 9112, by an ordinance referred to in that section:
( i ) Section 3104, floodplain alteration permit.
( ii ) Section 3503, permit for use of water in mining iron ore.
( iii ) Section 4105, sewerage system construction permit.
( iv ) Section 6516, vehicle testing license.
( v ) Section 6521, motor vehicle fleet testing permit.
( vi ) Section 8310, restricted use pesticide dealer license.
( vii ) Section 8310a, agricultural pesticide dealer license.
( viii ) Section 8504, license to manufacture or distribute fertilizer.
( ix ) Section 9112, local soil erosion and sedimentation control permit.
( x ) Section 11509, solid waste disposal area construction permit.
( xi ) Section 11512, solid waste disposal area operating license.
( xii ) Section 11542, municipal solid waste incinerator ash landfill operating license amendment.
( xiii ) Section 11702, septage waste servicing license or septage waste vehicle license.
( xiv ) Section 11709, septage waste site permit.
( xv ) Section 30104, inland lakes and streams project permit.
( xvi ) Section 30304, state permit for dredging, filling, or other activity in wetland. Permit includes an authorization for a specific project to proceed under a general permit issued under section 30312.
( xvii ) Section 31509, dam construction, repair, or removal permit.
( xviii ) Section 32312, flood risk, high risk, or environmental area permit.
( xix ) Section 32512, permit for dredging and filling bottomland.
( xx ) Section 32603, permit for submerged log removal from Great Lakes bottomlands.
( xxi ) Section 35304, department permit for critical dune area use.
( xxii ) Section 36505, endangered species permit.
( xxiii ) Section 41329, nonnative aquatic species sales registration.
( xxiv ) Section 41702, game bird hunting preserve license.
( xxv ) Section 42101, dog training area permit.
( xxvi ) Section 42501, fur dealer's license.
( xxvii ) Section 42702, game dealer's license.
( xxviii ) Section 44513, charter boat operating permit under reciprocal agreement.
( xxix ) Section 44516, boat livery operating permit.
( xxx ) Section 45902, game fish propagation license.
( xxxi ) Section 45906, game fish import license.
( xxxii ) Section 48705, permit to take amphibians and reptiles for scientific or educational use.
( xxxiii ) Section 61525, oil or gas well drilling permit.
( xxxiv ) Section 62509, brine, storage, or waste disposal well drilling or conversion permit or test well drilling permit.
( xxxv ) Section 63103a, ferrous mineral mining permit.
( xxxvi ) Section 63514 or 63525, surface coal mining and reclamation permit or revision of the permit, respectively.
( xxxvii ) Section 63704, sand dune mining permit.
( xxxviii ) Section 72108, use permits for a Pure Michigan Trail.
( xxxix ) Section 76109, sunken aircraft or watercraft abandoned property recovery permit.
( xl ) ( xxxx ) Section 76504, Mackinac Island motor vehicle and land use permits.
( xli ) ( xxxxi ) Section 80159, buoy or beacon permit.
(g) "Permit", as used in sections 1313 to 1317, means any permit or operating license that meets both of the following conditions:
( i ) The applicant for the permit or operating license is not this state or a political subdivision of this state.
( ii ) The permit or operating license is issued by the department of environmental quality environment, Great Lakes, and energy under this act or the rules promulgated under this act.
(h) "Processing deadline" means the last day of the processing period.
(i) "Processing period", subject to section 1307(2) and (3), means the following time period after the close of the application period, for the following permit, as applicable:
( i ) Twenty days for a permit under section 61525 or 62509.
( ii ) Thirty days for a permit under section 9112 or 44516.
( iii ) Thirty days after the department consults with the underwater salvage and preserve committee created under section 76103, for a permit under section 76109.
( iv ) Thirty days or, if a hearing is held, 90 days for a permit under section 30304.
( v ) ( iv ) Sixty days , for a permit under section 30104 for a minor project established under section 30105(7) or 32512a(1), or an authorization for a specific project to proceed under a general permit issued under section 30105(8) or 32512a(2), or for a permit under section 32312 or 41329.
( vi ) ( v ) Sixty days or, if a hearing is held, 90 days for a permit under section 35304.
( vii ) ( vi ) Sixty days or, if a hearing is held, 120 days for a permit under section 30104, other than a permit or authorization described in subparagraph ( ii ) or ( iv ), or for a permit under section 31509.
( viii ) ( vii ) Ninety days for a permit under section 11512, a revision of a surface coal mining and reclamation permit under section 63525, or a permit under section 72108.
( ix ) ( viii ) Ninety days or, if a hearing is held, 150 days for a permit under section 3104, or 30304, or a permit under section 32512 other than a permit described in subparagraph ( iv ).
( x ) ( ix ) Ninety days after the close of the review or comment period under section 32604, or if a public hearing is held, 90 days after the date of the public hearing for a permit under section 32603.
( xi ) ( x ) One hundred twenty days for a permit under section 11509, 11542, 63103a, 63514, or 63704.
( xii ) ( xi ) One hundred fifty days for a permit under section 36505. However, if a site inspection or federal approval is required, the 150-day period is tolled pending completion of the inspection or receipt of the federal approval.
( xiii ) ( xii ) For any other permit, 150 days or, if a hearing is held, 90 days after the hearing, whichever is later.
Sec. 1305. (1) After a department receives an application for a permit, the department shall determine whether the application is administratively complete. Unless the department proceeds as provided under subsection (2), the application shall be is considered to be administratively complete when the department makes that determination or 30 7 days after the state department receives the application, whichever is first.
(2) If, before the expiration of the 30-day 7-day period under subsection (1), the department notifies the applicant that the application is not administratively complete , specifying and specifies the information necessary to make the application administratively complete, or notifies the applicant that a fee required to accompany the application has not been paid , specifying and specifies the amount due, the running of the 30-day 7-day period under subsection (1) is tolled until the applicant submits to the department the specified information or fee amount due. The notice shall must be given in writing or by electronic notification.
(3) Subject to subsection (4), after an application for a permit is considered to be administratively complete under this section, the department shall not request from the applicant any new or additional information that is not specified in the list required under section 1303(2)(a) unless the request includes a detailed explanation of why the information is needed. The applicant is not required to provide the requested information as a condition for approval of the permit.
(4) After an application for a permit is considered to be administratively complete under this section, the department may request the applicant to clarify, amplify, or correct the information required for the application. The applicant shall provide the requested information.
Sec. 1307. (1) By the processing deadline, the department shall approve or deny an application for a permit.
(2) If requested by the permit applicant, the department shall extend the processing period for a permit by not more than 120 days, as specified by the applicant. If requested by the permit applicant, the department may extend the processing period beyond the additional 120 days. However, a processing period shall must not be extended under this subsection to a date later than 1 year after the application period ends.
(3) A processing period is tolled from the date that a permit applicant submits a petition under section 1315(1) until the date that a decision of the director is made under section 1315(6). If a permit applicant submits a petition under section 1315(1), the department shall not approve or deny the application for the permit under subsection (1) until after the director issues a decision under section 1315(6).
(4) The approval or denial of department shall approve or deny an application for a permit shall be in writing. and shall The approval or denial must be based upon on evidence that would meet the standards in section 75 of the administrative procedures act of 1969, 1969 PA 306, MCL 24.275, and the department shall cite to the applicable statutory basis for the determination.
(5) Approval of an application for a permit may be granted with conditions or modifications necessary to achieve compliance with the part or parts of this act under which the permit is issued.
(6) A denial of If an application for a permit is denied or, for a permit under part 301 or 303, an approval with modification of an application for a permit shall must document, and any review upholding the denial or modification shall must determine, to the extent practical, all of the following:
(a) That the decision is based on specifically cited provisions of this act or rules promulgated under this act.
(b) That the decision is based upon on sufficient facts or data , which that are recorded in the file.
(c) To the extent applicable, all of the following:
( i ) That the decision is the product of reliable scientific principles and methods.
( ii ) That the decision has applied the principles and methods reliably to the facts.
(d) In the case of denial of an application for a permit under part 301 or 303, suggestions on changes to allow the permit to be approved.
(7) Except for permits described in subsection (8), if the department fails to satisfy the requirements of subsection (1) with respect to an application for a permit, the department shall pay the applicant an amount equal to 15% of the greater of the following, as applicable:
(a) The amount of the application fee for that permit.
(b) If an assessment or other fee is charged on an annual or other periodic basis by the department to a person holding that holds the permit for which the application was submitted, the amount of the first periodic charge of that assessment or other fee for that permit.
(8) If the department fails to satisfy the requirements of subsection (1) with respect to a permit required by section 11509, 11512, 30304, or 32603, the application shall be is considered to be approved, and the department shall be is considered to have made any determination required for approval.
(9) The failure of the department to satisfy the requirements of subsection (1) or the fact that the department is required to make a payment under subsection (7) or is considered to have approved a permit under subsection (8) shall must not be used by the department as the basis for discriminating against the applicant. If the department is required to make a payment under subsection (7), the application shall must be processed in sequence with other applications for the same type of permit, based on the date on which the processing period began, unless the director determines on an application-by-application basis that the public interest is best served by processing in a different order.
(10) If the department fails to satisfy the requirements of subsection (1) with respect to 10% or more of the applications for a particular type of permit received during a quarter of the state fiscal year, the department shall immediately devote resources from that program to eliminate any backlog and satisfy the requirements of subsection (1) with respect to new applications for that type of permit within the next fiscal quarter.
(11) If the department fails to satisfy the requirements of subsection (1), the director shall notify the appropriations committees of the senate and house of representatives of the failure. The notification shall must be in writing and shall include both of the following:
(a) An explanation of the reason for the failure.
(b) A statement of the amount the department was required to pay the applicant under subsection (7) or a statement that the department was required to consider the application to be approved under subsection (8), as applicable.
Sec. 3112. (1) A person shall not discharge any waste or waste effluent into the waters of this the state unless the person is in possession of a valid permit from the department.
14 unchanged paragraphs
(2) An application for a permit under subsection (1) shall must be submitted to the department. Within 30 Not later than 7 days after an application for a new or increased use is received, the department shall determine whether the application is administratively complete. Within 90 Not later than 7 days after an application for reissuance of a permit is received, the department shall determine whether the application is administratively complete. If the department determines that an application is not administratively complete, the department shall notify the applicant in writing within the applicable time period. If the department does not make a determination as to whether the application is administratively complete within the applicable time period, the application shall be is considered to be complete.
(3) The department shall condition the continued validity of a permit upon on the permittee's permittee meeting the effluent requirements that the department considers necessary to prevent unlawful pollution by the dates that the department considers to be reasonable and necessary and to ensure compliance with applicable federal law. If the department finds that the terms of a permit have been, are being, or may be violated, it the department may modify, suspend, or revoke the permit or grant the permittee a reasonable period of time in which to comply with the permit. The department may reissue a revoked permit upon on a showing satisfactory to the department that the permittee has corrected the violation. A person who that has had a permit revoked may apply for a new permit.
(4) If the department determines that a person is causing or is about to cause unlawful pollution of the waters of this the state, the department may notify the alleged offender of its the department's determination and enter an order requiring that requires the person to abate the pollution or may refer the matter to the attorney general for legal action, or both.
(5) A person who that is aggrieved by an order of abatement of the department or by the reissuance, modification, suspension, or revocation of an existing permit of the department executed pursuant to under this section may file a sworn petition with the department setting that sets forth the grounds and reasons for the complaint and requesting requests a contested case hearing on the matter pursuant to under the administrative procedures act of 1969, 1969 PA 306, MCL 24.201 to 24.328. A petition filed more than 60 days after action on the order or permit may be rejected by the department as being untimely.
(6) All oceangoing vessels engaging in port operations in this state shall obtain a permit from the department. The department shall issue a permit for an oceangoing vessel only if the applicant can demonstrate that the oceangoing vessel complies with 33 CFR 151.1510 as then in effect or the oceangoing vessel will utilize environmentally sound technology and methods approved by the department that prevent the discharge of aquatic nuisance species. However, all of the following shall apply:
(a) The grant by the coast guard of an extension to the implementation schedule under 33 CFR 151.1513 or the exchange of ballast water under 33 CFR 151.1510(a)(1) or saltwater flushing under 33 CFR 401.30 alone is not considered compliance with the federal aquatic nuisance rule for the purposes of this section.
(b) A vessel discharging ballast water must employ a ballast water management system approved pursuant to under 33 CFR 151.1510(A)(3) 151.1510(a)(3) or a ballast water treatment method approved by the department.
(c) A vessel must carry out an exchange of ballast water or saltwater flushing and comply with other applicable requirements of 33 CFR part 151, subpart C, and 33 CFR 401.30.
(d) A vessel using water from a public water system under 33 CFR 151.1510(a)(4) shall must utilize a method to sufficiently clean ballast water tanks prior to before using water from a public water supply system as ballast water as approved by the department.
(e) A discharge that may cause or contribute to a violation of a water quality standard is not authorized by a permit described in this subsection.
(f) If the federal aquatic nuisance rule is amended after the enactment date of the 2018 amendatory act that added subsection (7), December 28, 2018, and the director determines that the amended version of the federal aquatic nuisance rule is less protective of the waters of this the state from aquatic nuisance species, the applicant shall demonstrate that the oceangoing vessel complies with the federal aquatic nuisance rule as in effect immediately before the effective date of that amendment to the federal aquatic nuisance rule.
(g) If pursuant to in accordance with a compact of Great Lakes states of which this state is a part, this state adopts standards more protective of the waters of this the state from aquatic nuisance species than the version of the federal aquatic nuisance rule otherwise applicable under this subsection, the standards adopted pursuant to in accordance with the compact apply.
(7) The intent of the legislature in adopting in part the federal aquatic nuisance rule by reference is to help harmonize regulatory programs in Great Lakes states for preventing the introduction and spread of aquatic nuisance species in the Great Lakes, including ballast water management programs, and to allow regulatory agencies to cooperate in developing stronger programs.
(8) Permit fees for permits under subsection (6) shall must be assessed as provided in section 3120. The permit fees for an individual permit issued under subsection (6) are the fees specified in section 3120(1)(a) and (5)(a). The permit fees for a general permit issued under subsection (6) are the fees specified in section 3120(1)(c) and (5)(b)( i ). Permits under subsection (6) shall must be issued in accordance with the timelines provided in section 3120. The department may promulgate rules to implement subsections (6) to (8).
(9) As used in this section, "federal aquatic nuisance rule" means 33 CFR part 151, subpart C, and applicable requirements of 33 CFR 151.2050, 151.2060, and 151.2070.
Sec. 30307. (1) Within 60 Not later than 30 days after receipt of the completed application and fee, the department may hold a hearing. If a hearing is held, it shall the hearing must be held in the county where the wetland to which the permit is to apply is located. Notice of the hearing shall must be given in the same manner as for the promulgation of rules under the administrative procedures act of 1969, 1969 PA 306, MCL 24.201 to 24.328. The department may approve or disapprove a permit application without a public hearing unless a person requests a hearing in writing within 20 days after the mailing of notification of the permit application as required by subsection (3) or unless the department determines that the permit application is of significant impact so as to warrant and warrants a public hearing.
(2) The action taken by the department on a permit application under this part or part 13 may be appealed pursuant to in accordance with the administrative procedures act of 1969, 1969 PA 306, MCL 24.201 to 24.328. A property owner may, after exhaustion of administrative remedies, bring appropriate legal action in a court. of competent jurisdiction.
(3) The department shall post on its the department's website , and shall have a process to provide electronic mail email notification of , all of the following under this part:
(a) A list of pending applications.
(b) Public notices.
(c) Public hearing schedules.
(4) A local unit of government may regulate wetland within its the local unit of government's boundaries, by ordinance, only as provided under this part. This subsection is supplemental to the existing authority of a local unit of government. An ordinance adopted by a local unit of government pursuant to under this subsection shall must comply with all of the following:
(a) The ordinance shall must not provide a different definition of wetland than is provided in this part, except that a wetland ordinance may regulate wetland of less than 5 acres in size.
(b) If the ordinance regulates wetland that is smaller than 2 acres in size, the ordinance shall must comply with section 30309.
(c) The ordinance shall must comply with sections 30308 and 30310.
(d) The ordinance shall must not require a permit for uses that are authorized without a permit under section 30305, and shall must otherwise comply with this part.
(5) A local unit of government that adopts an ordinance regulating wetlands wetland under subsection (4) shall notify the department.
(6) A local unit of government that adopts an ordinance regulating wetlands wetland shall use an application form supplied by the department, and each person applying that applies for a permit shall make application directly to the local unit of government. Upon On receipt, the local unit of government shall forward a copy of each application along with any state fees that may have been were submitted under section 30306 to the department. The department shall begin reviewing the application as provided in this part. The local unit of government shall review the application pursuant to its in accordance with the ordinance and shall modify, approve, or deny the application within not later than 90 days after receipt. If a local unit of government does not approve or disapprove the permit application within the time period provided by this subsection, the permit application shall be is considered approved, and the local unit of government shall be is considered to have made the determinations as listed in section 30311. The denial of a permit shall must be accompanied by a written statement of all reasons for denial. The failure to supply complete information with a permit application may be reason for denial of a permit. If requested, the department shall inform a person whether or not a local unit of government has an ordinance regulating wetlands. wetland. If the department receives an application with respect to a wetland located in a local unit of government that has an ordinance regulating wetlands, wetland, the department immediately shall forward the application to the local unit of government, which shall modify, deny, or approve the application under this subsection. The local unit of government shall notify the department of its decision. The department shall proceed as provided in this part.
(7) If a local unit of government does not have an ordinance regulating wetlands, that regulates wetland, the department shall promptly send a copy of the permit application to the local unit of government where the wetland is located. The local unit of government may review do all of the following:
(a) Review the application.; may hold
(b) Hold a hearing on the application.; may recommend
(c) Recommend approval, modification, or denial of the application to the department or may notify the department that the local unit of government declines to make a recommendation. The recommendation of the local unit of government, if any, shall must be made and returned to the department within not later than 45 days after the local unit of government's receipt of the permit application.
(8) In addition to the requirements of subsection (7), the department shall notify the local unit of government that the department has issued a permit under this part pertaining to wetland located within the jurisdiction of that local unit of government within not later than 15 days of after issuance of the permit. The department shall enclose a copy of the permit with the notice.
Enacting section 1. This amendatory act does not take effect unless all of the following bills of the 103rd Legislature are enacted into law:
(a) House Bill No. 5936.
(b) House Bill No. 5938.
(c) House Bill No. 6038.