Florida Senate
-
2026
CS for SB 948
By
Senator McClain
the Committee on Community Affairs; and Senators McClain,
Rodriguez, DiCeglie, Smith, and Rouson
9-01071-26 2026948__578-02268-26 2026948c1
1 A bill to be entitled
2 An act relating to local government land development
3 regulations and orders; amending ss. 125.022 and
4 166.033, F.S.; revising,providing forapplicability; counties andrequiring
5 counties and municipalities, respectively, theto applicationfollow
6 certain application procedures for applications for
67 procedures forcertain development permits and development orders;
78 creating s. 163.3254, F.S.; creating the “Florida
89 Starter Homes Act” for a specified purpose; providing a short title; providing
10 a short title; providing legislative findings;
911 legislative findings; defining terms; prohibiting local governments from
12 imposing regulations governing residential lots unless
13 such regulations meet specified requirements;
14 providing applicability; providing construction;
1015 prohibiting local governments from adoptingimposing land developmentcertain
1116 regulations governingif lots ona residential reallot is connected to a
17 public water system and a sewerage system; requiring
18 that regulations imposed by a local government allow
19 residential lots to front or abut a shared space
20 instead of a public right-of-way; prohibiting a local
21 government from imposing regulations that require more
22 than a certain minimum number of parking spaces for
23 specified residential lots; prohibiting a local
1224 propertygovernment unlessfrom suchimposing adoptioncertain meetsregulations specifiedon
25 residential lots that contain historic property;
26 providing exceptions; requiring that local government
27 regulations include a certain process; requiring the
28 approval of a lot split under certain circumstances;
29 limiting the criteria that may be required by local
30 governments for applications for and approvals of lot
1331 requirementssplits; providingestablishing applicability;an providingapplication process for
32 development applications for residential lots;
33 requiring a local government to process such
34 applications in a certain manner within certain
35 timeframes; requiring the approval of such development
36 applications by right under certain circumstances;
37 authorizing an applicant to request, and requiring the
38 local government to grant, certain extensions;
1439 construction;prohibiting prohibitinga local governmentsgovernment from imposing, or from
40 requiring an applicant to request, such an extension;
41 providing that certain applications are deemed
42 approved by right under certain circumstances;
43 requiring a local government to issue to an applicant
44 a refund of the application fee under certain
45 circumstances; providing construction; authorizing
1546 adopting certain landproperty developmentowners regulationsand ifhousing aorganizations lotto
47 maintain a cause of action under certain
48 circumstances; defining the term “housing
49 organization”; specifying the procedure for such
50 actions; authorizing the award of specified relief;
51 providing that a prevailing plaintiff is entitled to
52 attorney fees and costs; providing a waiver of
1653 onsovereign residentialimmunity; realproviding propertyconstruction; is connected to a publicproviding
54 retroactive application; providing for liberal
55 construction; providing that certain local government
56 regulations are void and unenforceable to a specified
57 extent; amending s. 163.514, F.S.; authorizing the
58 board of a neighborhood improvement district to plan,
59 finance, or complete structural safety or building
60 compliance improvements if approved by a majority vote
1761 waterof systemthe district’s residents or by a publiccertain sewer system; requiring thatadvisory
18 land development regulations adopted by a local
19 government allow lots to front or abut a shared space
62 council; amending s. 177.071, F.S.; providing
2063 instead of a public right-of-wayapplicability; prohibitingrequiring suchan administrative authority
64 to follow certain application procedures for
65 applications for certain plats and replats; amending
66 s. 553.382, F.S.; authorizing the placement of a
2167 regulationsresidential frommanufactured requiringbuilding on any lot in a minimum number of parking
68 recreational vehicle park; conforming provisions to
69 changes made by the act; creating s. 553.385, F.S.;
2270 spaces for specified lots; defining the termterms “publiclocal government” and “off-site
71 constructed residential dwelling”; requiring the
72 permitting as of right of an off-site constructed
73 residential dwelling in certain zoning districts;
74 prohibiting a local government from adopting or
75 enforcing certain regulations; providing construction;
76 authorizing a local government to adopt compatibility
2377 transit stop”; limiting the criteriastandards that mayare belimited to certain architectural
78 features; prohibiting a local government from treating
79 off-site constructed residential dwellings differently
80 than factory-built buildings based on certain
81 circumstances; prohibiting a local government from
82 adopting or enforcing certain zoning, land use, or
83 development ordinances and regulations; prohibiting
2484 required by local governmentsgovernment inordinances applicationsand forregulations thefrom
25 proposed development of lot splits; establishing an
26 application process for such proposed developments;
85 having certain effects; providing that certain local
2786 prohibitinggovernment landordinances developmentand regulations adoptedare byvoid and
28 local governments governing lot splits on historic
29 property from varying from other specified
3087 regulationsunenforceable to a specified extent; providing an exception; establishing a
31 cause of action; authorizing the award of specified
32 remedies; providing for waiver of sovereign immunity;
33 providing construction; amending s. 177.071, F.S.;
34 revising the application procedures for administrative
35 approval of plats or replats; providing an effective
3688 effective date.
37
38 Be It Enacted by the Legislature of the State of Florida:
39
40 Section 1. Section 125.022, Florida Statutes, is amended to
41 read:
42 125.022 Development permits and orders.—
43
(1)
As used in this section, the terms “development permit”
44
and “development order” have the same meanings as in s.
45
163.3164, but do not include building permits.
46
(2)
(1)
A county shall specify in writing the minimum
47 information that must be submitted in an application for a
48 zoning approval, rezoning approval, subdivision approval,
49 certification, special exception, or variance. A county shall
50 make the minimum information available for inspection and
51 copying at the location where the county receives applications
52 for development permits and orders, provide the information to
53 the applicant at a preapplication meeting, or post the
54 information on the county’s website.
55
(3)
A county shall follow the application procedures
56
established in s. 163.3254(6) upon receiving an application for
57
approval of a development permit or development order.
58
(2) Within 5 business days after receiving an application
59
for approval of a development permit or development order, a
60
county shall confirm receipt of the application using contact
61
information provided by the applicant. Within 30 days after
62
receiving an application for approval of a development permit or
63
development order, a county must review the application for
64
completeness and issue a written notification to the applicant
65
indicating that all required information is submitted or specify
66
in writing with particularity any areas that are deficient. If
67
the application is deficient, the applicant has 30 days to
68
address the deficiencies by submitting the required additional
69
information. For applications that do not require final action
70
through a quasi-judicial hearing or a public hearing, the county
71
must approve, approve with conditions, or deny the application
72
for a development permit or development order within 120 days
73
after the county has deemed the application complete. For
74
applications that require final action through a quasi-judicial
75
hearing or a public hearing, the county must approve, approve
76
with conditions, or deny the application for a development
77
permit or development order within 180 days after the county has
78
deemed the application complete. Both parties may agree in
79
writing or in a public meeting or hearing to an extension of
80
time, particularly in the event of a force majeure or other
81
extraordinary circumstance. An approval, approval with
82
conditions, or denial of the application for a development
83
permit or development order must include written findings
84
supporting the county’s decision. The timeframes contained in
85
this subsection do not apply in an area of critical state
86
concern, as designated in s. 380.0552. The timeframes contained
87
in this subsection restart if an applicant makes a substantive
88
change to the application. As used in this subsection, the term
89
“substantive change” means an applicant-initiated change of 15
90
percent or more in the proposed density, intensity, or square
90 Be It Enacted by the Legislature of the State of Florida:
91
footage of a parcel
.
92
(3)(a)
When reviewing an application for a development
93
permit or development order that is certified by a professional
94
listed in s. 403.0877, a county may not request additional
92 Section 1. Subsection (10) is added to section 125.022,
93 Florida Statutes, to read:
94 125.022 Development permits and orders.—
95
information from the applicant more than three times, unless the
(10) Subsections (2), (3), and (4) do not apply to an
96
applicant waives the limitation in writing.
application for approval of a development permit or development
97
(b)
If a county makes a request for additional information
order for a residential lot as defined in s. 163.3254(3). For
98
and the applicant submits the required additional information
such applications, the county shall follow the application
99
within 30 days after receiving the request, the county must
100
review the application for completeness and issue a letter
101
indicating that all required information has been submitted or
102
specify with particularity any areas that are deficient within
procedures established in s. 163.3254(
7
).
100 Section 2. Subsection (10) is added to section 166.033,
101 Florida Statutes, to read:
102 166.033 Development permits and orders.—
103
30 days after receiving the additional information.
(10) Subsections (2), (3), and (4) do not apply to an
104
(c)
If a county makes a second request for additional
application for approval of a development permit or development
105
information and the applicant submits the required additional
order for a residential lot as defined in s. 163.3254(3). For
106
information within 30 days after receiving the request, the
such applications, the
municipality
shall follow the application
107
county must review the application for completeness and issue a
108
letter indicating that all required information has been
109
submitted or specify with particularity any areas that are
procedures established in s. 163.3254(
7
).
108 Section 3. Section 163.3254, Florida Statutes, is created
109 to read:
110
deficient within 10 days after receiving the additional
111
information.
112
(d)
Before a third request for additional information, the
113
applicant must be offered a meeting to attempt to resolve
114
outstanding issues. If a county makes a third request for
115
additional information and the applicant submits the required
116
additional information within 30 days after receiving the
117
request, the county must deem the application complete within 10
118
days after receiving the additional information or proceed to
119
process the application for approval or denial unless the
120
applicant waived the county’s limitation in writing as described
121
in paragraph (a).
122
(e)
Except as provided in subsection (7), if the applicant
123
believes the request for additional information is not
124
authorized by ordinance, rule, statute, or other legal
125
authority, the county, at the applicant’s request, shall proceed
126
to process the application for approval or denial.
127
(4)
A county must issue a refund to an applicant equal to:
128
(a)
Ten percent of the application fee if the county fails
129
to issue written notification of completeness or written
130
specification of areas of deficiency within 30 days after
131
receiving the application.
132
(b)
Ten percent of the application fee if the county fails
133
to issue a written notification of completeness or written
134
specification of areas of deficiency within 30 days after
135
receiving the additional information pursuant to paragraph
136
(3)(b).
137
(c)
Twenty percent of the application fee if the county
138
fails to issue a written notification of completeness or written
139
specification of areas of deficiency within 10 days after
140
receiving the additional information pursuant to paragraph
141
(3)(c).
142
(d)
Fifty percent of the application fee if the county
143
fails to approve, approves with conditions, or denies the
144
application within 30 days after conclusion of the 120-day or
145
180-day timeframe specified in subsection (2).
146
(e)
One hundred percent of the application fee if the
147
county fails to approve, approves with conditions, or denies an
148
application 31 days or more after conclusion of the 120-day or
149
180-day timeframe specified in subsection (2).
150
A county is not required to issue a refund if the applicant and
151
the county agree to an extension of time, the delay is caused by
152
the applicant, or the delay is attributable to a force majeure
153
or other extraordinary circumstance.
154
(4)
(5)
When a county denies an application for a
155 development permit or development order, the county shall give
156 written notice to the applicant. The notice must include a
157 citation to the applicable portions of an ordinance, rule,
158 statute, or other legal authority for the denial of the permit
159 or order.
160
(6)
As used in this section, the terms “development permit”
161
and “development order” have the same meaning as in s. 163.3164,
162
but do not include building permits.
163
(5)
(7)
For any development permit application filed with
164 the county after July 1, 2012, a county may not require as a
165 condition of processing or issuing a development permit or
166 development order that an applicant obtain a permit or approval
167 from any state or federal agency unless the agency has issued a
168 final agency action that denies the federal or state permit
169 before the county action on the local development permit.
170
(6)
(8)
Issuance of a development permit or development
171 order by a county does not in any way create any rights on the
172 part of the applicant to obtain a permit from a state or federal
173 agency and does not create any liability on the part of the
174 county for issuance of the permit if the applicant fails to
175 obtain requisite approvals or fulfill the obligations imposed by
176 a state or federal agency or undertakes actions that result in a
177 violation of state or federal law. A county shall attach such a
178 disclaimer to the issuance of a development permit and shall
179 include a permit condition that all other applicable state or
180 federal permits be obtained before commencement of the
181 development.
182
(7)
(9)
This section does not prohibit a county from
183 providing information to an applicant regarding what other state
184 or federal permits may apply.
185 Section 2. Section 166.033, Florida Statutes, is amended to
186 read:
187 166.033 Development permits and orders.—
188
(1)
As used in this section, the terms “development permit”
189
and “development order” have the same meanings as in s.
190
163.3164, but do not include building permits.
191
(2)
(1)
A municipality shall specify in writing the minimum
192 information that must be submitted for an application for a
193 zoning approval, rezoning approval, subdivision approval,
194 certification, special exception, or variance. A municipality
195 shall make the minimum information available for inspection and
196 copying at the location where the municipality receives
197 applications for development permits and orders, provide the
198 information to the applicant at a preapplication meeting, or
199 post the information on the municipality’s website.
200
(3)
A municipality shall follow the application procedures
201
established in s. 163.3254(6) upon receiving an application for
202
approval of a development permit or development order.
203
(2)
Within 5 business days after receiving an application
204
for approval of a development permit or development order, a
205
municipality shall confirm receipt of the application using
206
contact information provided by the applicant. Within 30 days
207
after receiving an application for approval of a development
208
permit or development order, a municipality must review the
209
application for completeness and issue a written notification to
210
the applicant indicating that all required information is
211
submitted or specify in writing with particularity any areas
212
that are deficient. If the application is deficient, the
213
applicant has 30 days to address the deficiencies by submitting
214
the required additional information. For applications that do
215
not require final action through a quasi-judicial hearing or a
216
public hearing, the municipality must approve, approve with
217
conditions, or deny the application for a development permit or
218
development order within 120 days after the municipality has
219
deemed the application complete. For applications that require
220
final action through a quasi-judicial hearing or a public
221
hearing, the municipality must approve, approve with conditions,
222
or deny the application for a development permit or development
223
order within 180 days after the municipality has deemed the
224
application complete. Both parties may agree in writing or in a
225
public meeting or hearing to an extension of time, particularly
226
in the event of a force majeure or other extraordinary
227
circumstance. An approval, approval with conditions, or denial
228
of the application for a development permit or development order
229
must include written findings supporting the municipality’s
230
decision. The timeframes contained in this subsection do not
231
apply in an area of critical state concern, as designated in s.
232
380.0552 or chapter 28-36, Florida Administrative Code. The
233
timeframes contained in this subsection restart if an applicant
234
makes a substantive change to the application. As used in this
235
subsection, the term “substantive change” means an applicant
236
initiated change of 15 percent or more in the proposed density,
237
intensity, or square footage of a parcel.
238
(3)(a)
When reviewing an application for a development
239
permit or development order that is certified by a professional
240
listed in s. 403.0877, a municipality may not request additional
241
information from the applicant more than three times, unless the
242
applicant waives the limitation in writing.
243
(b)
If a municipality makes a request for additional
244
information and the applicant submits the required additional
245
information within 30 days after receiving the request, the
246
municipality must review the application for completeness and
247
issue a letter indicating that all required information has been
248
submitted or specify with particularity any areas that are
249
deficient within 30 days after receiving the additional
250
information.
251
(c)
If a municipality makes a second request for additional
252
information and the applicant submits the required additional
253
information within 30 days after receiving the request, the
254
municipality must review the application for completeness and
255
issue a letter indicating that all required information has been
256
submitted or specify with particularity any areas that are
257
deficient within 10 days after receiving the additional
258
information.
259
(d)
Before a third request for additional information, the
260
applicant must be offered a meeting to attempt to resolve
261
outstanding issues. If a municipality makes a third request for
262
additional information and the applicant submits the required
263
additional information within 30 days after receiving the
264
request, the municipality must deem the application complete
265
within 10 days after receiving the additional information or
266
proceed to process the application for approval or denial unless
267
the applicant waived the municipality’s limitation in writing as
268
described in paragraph (a).
269
(e)
Except as provided in subsection (7), if the applicant
270
believes the request for additional information is not
271
authorized by ordinance, rule, statute, or other legal
272
authority, the municipality, at the applicant’s request, shall
273
proceed to process the application for approval or denial.
274
(4)
A municipality must issue a refund to an applicant
275
equal to:
276
(a)
Ten percent of the application fee if the municipality
277
fails to issue written notification of completeness or written
278
specification of areas of deficiency within 30 days after
279
receiving the application.
280
(b)
Ten percent of the application fee if the municipality
281
fails to issue written notification of completeness or written
282
specification of areas of deficiency within 30 days after
283
receiving the additional information pursuant to paragraph
284
(3)(b).
285
(c)
Twenty percent of the application fee if the
286
municipality fails to issue written notification of completeness
287
or written specification of areas of deficiency within 10 days
288
after receiving the additional information pursuant to paragraph
289
(3)(c).
290
(d)
Fifty percent of the application fee if the
291
municipality fails to approve, approves with conditions, or
292
denies the application within 30 days after conclusion of the
293
120-day or 180-day timeframe specified in subsection (2).
294
(e)
One hundred percent of the application fee if the
295
municipality fails to approve, approves with conditions, or
296
denies an application 31 days or more after conclusion of the
297
120-day or 180-day timeframe specified in subsection (2).
298
299
A municipality is not required to issue a refund if the
300
applicant and the municipality agree to an extension of time,
301
the delay is caused by the applicant, or the delay is
302
attributable to a force majeure or other extraordinary
303
circumstance.
304
(4)
(5)
When a municipality denies an application for a
305 development permit or development order, the municipality shall
306 give written notice to the applicant. The notice must include a
307 citation to the applicable portions of an ordinance, rule,
308 statute, or other legal authority for the denial of the permit
309 or order.
310
(6)
As used in this section, the terms “development permit”
311
and “development order” have the same meaning as in s. 163.3164,
312
but do not include building permits.
313
(5)
(7)
For any development permit application filed with
314 the municipality after July 1, 2012, a municipality may not
315 require as a condition of processing or issuing a development
316 permit or development order that an applicant obtain a permit or
317 approval from any state or federal agency unless the agency has
318 issued a final agency action that denies the federal or state
319 permit before the municipal action on the local development
320 permit.
321
(6)
(8)
Issuance of a development permit or development
322 order by a municipality does not create any right on the part of
323 an applicant to obtain a permit from a state or federal agency
324 and does not create any liability on the part of the
325 municipality for issuance of the permit if the applicant fails
326 to obtain requisite approvals or fulfill the obligations imposed
327 by a state or federal agency or undertakes actions that result
328 in a violation of state or federal law. A municipality shall
329 attach such a disclaimer to the issuance of development permits
330 and shall include a permit condition that all other applicable
331 state or federal permits be obtained before commencement of the
332 development.
333
(7)
(9)
This section does not prohibit a municipality from
334 providing information to an applicant regarding what other state
335 or federal permits may apply.
336 Section 3. Section 163.3254, Florida Statutes, is created
337 to read:
338
163.3254
Florida Starter Homes Act.—The Florida Starter
339
111
Homes Act is created to addressmake thehome risingownership, pricerenting, of homes inand
340
112
leasing more affordable for the residents of this state by
113
this state and increaseincreasing the supply of housing for the residents of this
341
114
of this state.
342
115
(1)
This section may be cited as the “Florida Starter Homes
343
116
Act.”
344
117
(2)
The Legislature finds that:
345
118
(a)
The median price of homes in this state has increased
346
119
steadily overin the lastdecade decadepreceding 2026, rising at a greater rate of
347
120
of increase than the median income in this state.
348
121
(b)
There is a housing shortage in this state which
122
constitutes a threat to the health, safety, and welfare of the
123
residents of this state, and this shortage has caused the costs
124
The cost of home ownership, renting, and renting or leasing to often exceed an
349
125
exceeds an amount that is affordable for residents of this state.
350
state.
351
(c)
126
There is currently a(c) The housing shortage thatis constitutescaused, to a significant
352
a threat to the health, safety, and welfare of the residents of
353
this state, and this shortage is caused in part by land
354
127
extent, by regulations governing residential lots which have
128
developmentbeen regulations adoptedimposed by local governments without a compelling
355
129
compelling governmental interest. relatingSuch toregulations lotssubstantially onburden residentialthe
356
real property, which substantially burden the basic right under
357
130
basic right under the State Constitution to acquire, possess, and protect
358
131
and protect property.
359
132
(d)
Land development regulations adopted relating to lots
360
on residential real property do not encourage a high degree of
361
Single-family detached homes, single-family attached
133
homes, townhouses, duplexes, triplexes, and quadruplexes are
134
affordable starter homes for residents of this state to own,
135
rent
,
or lease.
136
(e) Regulations governing residential lots which have been
137
imposed by local governments do not encourage a high degree of
138
flexibility relating to residential development, and such
362
139
regulations prevent the development of single-familystarter homes on
363
140
residential lots smaller in size, due, in part, to minimum lot size
364
141
size requirements and restrictions on the types of dwellings allowed
365
142
allowed to be constructed on suchresidential propertylots.
366
143
(ef)
The important public purpose sought to be achieved by allowing
367
144
otherallowing typesstarter of dwelling unitshomes on residential lots that are smaller in size on
368
145
residential real propertysize is to increase the supply of housing, which will make home
369
146
makingownership, homeownershiprenting, and rentingleasing more affordable for the
370
147
residents of this state.
371
148
(3)
For purposes of this section, the term:
149
(a)
“B
usiness day” means all calendar days except
150
Saturdays, Sundays, and holidays under s. 110.117(1).
151
(b)
“By right”
means administrative approval
as a matter of
152
right
by a local government of a development application that
153
objectively complies with applicable zoning regulations and for
154
which the local government may not impose a public hearing; any
155
action by a governing body, reviewing body, or quasi-judicial
156
body; a variance; a conditional use permit, special permit, or
157
special exception; or any other discretionary regulation
.
158
(c) “Compelling governmental interest” means a governmental
159
interest of the highest order which cannot be achieved through
160
less restrictive means. A compelling governmental interest must
161
have a real and substantial connection to protecting public
162
safety, health, or reasonable enjoyments and expectations of
163
property, such as requiring the structural integrity, safe
164
plumbing, or safe electricity of buildings, or preventing or
165
abating nuisances.
166
(d) “Development”
has the same meaning as in s. 380.04.
167
(e) “Development application” means
an application for
168
approval of any of the following:
169
1. A lot split or subdivision.
170
2. A plat or replat.
171
3. A development bonus for additional height, density, or
172
floor area ratio.
173
4. The demolition of an existing structure, if the
174
demolition objectively complies with applicable regulations.
175
5. Any other development
order or development permit as
176
those terms are
defined in s. 163.3164, except for building
177
permits.
178
(f) “Dwelling unit” means
a single unit formed by one or
179
more rooms within a dwelling
which
is used, or is designed to be
180
used, as a home, residence, or sleeping place for at least one
181
person.
182
(g) “Impose” means
request or adopt, enact, establish,
183
maintain, enforce, mandate, compel, force, or otherwise require.
184
(h)
“Local government” means any county, municipality, or
185
special district.
186
(i) “Lot” means
a parcel, tract, tier, block, site, unit,
187
or any other division of land.
188
(j)
“Lot split” means the division of a parent parcel into
189
no more than eight residential lots.
190
(k) “Nuisance” means
persistent activity that injures the
191
physical condition or interferes with the use of adjacent land,
192
is injurious to health or safety, or objectively offends the
193
senses.
194
(l) “Objectively” means
in a way that involves no personal
195
or subjective judgment by a public official and that is
196
uniformly verifiable by reference to an external and uniform
197
benchmark or criterion available and knowable by both the local
198
government and the development applicant, development proponent,
199
or property owner, as applicable.
200
(m)
“Parent parcel” means the original lot from which
201
subsequent lots are created.
202
(n) “Public transit stop” means
a stop or station used for
203
public purposes for transit services, including for a bus rapid
204
transit service,
a
bus system,
a
streetcar
,
a commuter rail
205
service
as defined in s. 341.301
,
an
intercity rail
206
transportation system
as defined in s. 341.301
, or
a
fixed
207
guideway transportation system
as defined in s. 341.031(2).
The
208
term does not include a stop or station for
a
people-mover
209
system in a public-use airport as defined
in
s. 332.004 or
for
210
an
intercity rail transportation system in a rural community as
211
defined in s. 288.0656
(2)
.
212
(
o
) “Public water system” has the same meaning as in s.
213
403.852(2).
214
(p) “Regulation” means
a
comprehensive plan, a development
215
order, or a
land development regulation as
those terms are
216
defined in s. 163.3164 or any other local government ordinance,
217
resolution, policy, action, procedure, condition, guideline,
218
development agreement, or land development code.
219
(q) “Residential lot” means
a lot that is zoned for
220
residential use or on which
at least one type of starter home is
221
an existing or lawful use. The term does not include
a
lot that
222
is
located within an area of critical state concern designated
223
pursuant to s. 380.05.
224
(r) “Sewerage system” has the same meaning as in s.
225
403.031.
The term does not include an onsite sewage treatment
226
and disposal system as defined in s. 403.031.
227
(s)
“Shared space” means a driveway, an alley, or a common
228
open space, such as a courtyard or pocket park.
229
(t) “Starter home” means
a dwelling with one, two, three,
230
or four dwelling units
. The term includes, but is not limited
231
to
, single-family detached homes, single-family attached homes,
232
townhouses as defined in s. 481.203, duplexes, triplexes, and
233
quadruplexes, and the
curtilage
thereof.
234
(u)
“Subdivision” means the division of a parent parcel
235
into nine or more residential lots. The term includes streets,
236
alleys, additions, and resubdivisions.
237
(4)(a)1.
A local government may not impose a regulation
238
that governs residential lots unless such regulation is:
239
a.
In furtherance of a compelling governmental interest;
240
and
241
b.
The least restrictive means of furthering that
242
compelling governmental interest.
243
2.
Subparagraph 1. does not apply to regulations that:
244
a.
Prevent or abate a nuisance;
245
b.
Enforce the terms of a license, a permit, or an
246
authorization;
247
c.
Enforce any requirement imposed by federal law; or
248
d.
Are the result of a final, nonappealable judicial
249
determination.
250
3.
Any ambiguity in a regulation that governs residential
251
lots must be construed in favor of the basic rights to acquire,
252
possess, and protect property,
including, but not limited to,
253
the
right to
approval by right of
a
development or development
254
application
.
255
(b)
If a residential lot is connected to a public water
256
system and a sewerage system, or will be connected to such
257
systems as part of a lot split plan or subdivision plan, a local
258
government may not impose a regulation that does any of the
259
following:
260
1.
Requires a minimum lot size that is greater than 1,200
261
square feet for existing lots, lots created by a lot split, or
262
lots created by subdivision.
263
2.
Prohibits, limits, or otherwise restricts the
264
development of a starter home.
265
3.
Requires a minimum setback that is greater than: 0 feet
266
from the sides; 10 feet from the rear; or 20 feet from the
267
front, or 0 feet from the front if the lot fronts or abuts a
268
shared space.
269
4.
Requires a minimum dimension of a lot, including its
270
width or depth, to exceed 20 feet if the lot meets the relevant
271
minimum lot size requirement.
272
5.
Requires more than 30 percent of lot area to be reserved
273
for open space or permeable surface.
274
6.
Requires a maximum building height of less than three
275
stories or 35 feet above grade or, if applicable, three stories
276
or 35 feet above the base flood elevation established by the
277
Federal Emergency Management Agency.
278
7.
Requires a maximum floor area ratio of less than 3.
279
8.
Requires the property owner to occupy the property.
280
9.
Requires a minimum size for a starter home which is
281
greater than that required by the Florida Building Code.
282
10.
Requires a maximum residential density, typically
283
measured in dwelling units per acre, which is more restrictive
284
than the requirements of this subsection.
285
(5)(a)
Regulations imposed by a local government must allow
286
a residential lot to front or abut a shared space instead of a
287
public right-of-way.
288
(b)
A local government may not impose a regulation that
289
requires a minimum number of parking spaces greater than one per
290
residential dwelling unit for residential lots that are 4,000
291
square feet or less, or any minimum number of parking spaces for
292
residential lots within a one-half mile radius of a public
293
transit stop that is open for public use on or after January 1,
294
2026.
295
(c) A
local government may not impose
a
regulation that
296
prohibit
s
, limit
s
, or otherwise restrict
s
lot splits or the
297
development of starter homes
on a residential lot that contains
298
historic property as defined in s. 267.021, except for:
299
1.
Regulations
relating to building design elements which
300
may be applied pursuant
to s. 163.3202(5)(a)1.; or
301
2.
Regulations that prohibit, limit, or otherwise restrict
302
the demolition or alteration of a structure or building that is
303
individually listed in the National Register of Historic Places,
304
or that is a contributing structure or building within a
305
historic district which was listed in the National Register of
306
Historic Places before January 1, 2000.
307
(6)
Local government regulations must include a process
308
through which an applicant may seek review and approval of a lot
309
split.
310
(a) A lot split must be approved by right if the lot split
311
objectively complies with the requirements of this section.
312
(b) Regulations imposed by a local government which
313
establish criteria for the application for, or approval of, a
314
lot split are limited to the following:
315
1.
The requirement that an applicant provide the relevant
316
documentation and pay a fee for the cost of review of such
317
documentation. Any other fee imposed on the application for, or
318
approval of, a lot split is prohibited.
319
2.
The requirement that lots created by the lot split
320
comply with applicable zoning regulations that govern the parent
321
parcel.
322
3.
The requirement that the parent parcel was not created
323
by a lot split or subdivision during the previous 12 months.
324
(7)(a)
A local government shall confirm receipt of a
325
development application for a residential lot within 5 business
326
days after receipt of the application using the contact
327
information provided by the applicant. Within 10 business days
328
after receiving the application, the local government shall
329
review the application for completeness and issue a written
330
notification to the applicant indicating that all required
331
information is submitted or specify in writing with
332
particularity any areas that are deficient. If the application
333
is deficient, the applicant has 60 business days to address the
334
deficiencies by submitting the required additional information.
335
(b) Within 5 business days after receipt of such additional
336
information, the local government shall issue a written
337
notification to the applicant indicating that all required
338
information is submitted or specify in writing with
339
particularity any areas that remain deficient. The local
340
government may request additional information up to three times
341
if necessary to address an initially identified area of
342
deficiency. However, the local government may not raise a new
343
area of deficiency in a subsequent request for additional
344
information unless the deficiency was caused by a material
345
change introduced by the applicant in the additional information
346
provided to the local government. Before making a third request
347
for additional information, the local government must offer the
348
applicant a meeting to discuss and resolve any outstanding areas
349
of deficiency. If the applicant believes that
a request for
350
additional information is not authorized by
law
, the local
351
government, at the applicant’s request,
must
process the
352
application for approval or denial. If a local government deems
353
an application incomplete
after making three requests for
354
additional information
, the local government
must
process the
355
application for approval or denial.
356
(c) The local government shall approve the development
357
application by right within 20 business days after deeming the
358
application complete and may not impose any further action. Any
359
denial of the application must include written findings
360
supporting the local government’s decision.
361
(d) At any point during the timeframes specified in
362
paragraph (a) or paragraph (b), an applicant may request, and
363
the local government must grant, an extension of time for up to
364
60 business days. However, a local government may not impose an
365
extension of time or require an applicant to request an
366
extension of time.
367
(e)
If a local government fails to:
368
1.
Issue a written notification of completeness or written
369
specification of areas of deficiency within 10 business days
370
after receiving a development application;
371
2.
Issue a written notification of completeness or written
372
(a)
“Compelling governmental interest” means a governmental
specification of areas of deficiency within 5 days after
373
interest of the highest order which cannot be achieved through
receiving additional information; or
374
less restrictive means. A compelling governmental interest must
3.
Approve an application by right within 20 days after
375
have a real and substantial connection to protecting public
deeming the application complete,
376
safety, health, or reasonable enjoyments and expectations of
377
property, such as requiring the structural integrity, safe
the application is deemed approved by right, and the local
378
plumbing, or safe electricity of buildings, or preventing
government must issue written notification of approval by the
379
nuisances.
next business day and issue to the applicant a refund equal to
380
(b)
“Land development regulations” has the same meaning as
100 percent of the application fee.
381
in s. 163.3164.
(f)
The timeframes contained in this subsection do not
382
(c)
“Local government” means any county, municipality, or
supersede
any other timeframes
provided
in
state law which
are
383
specialless district.restrictive
than this subsection
for property owners or
384
(d)
“Lot split” means the division of a parent parcel into
development, such as a shorter timeframe for a local government
385
no more than eight lots.
to review documentation or to approve
a
development application.
386
(e)
“Parent parcel” means the original parcel from which
(8)(a)
A property owner or housing organization aggrieved
387
subsequent lots are created.
or adversely affected by a regulation imposed by a local
388
(f)
“Residential dwelling unit” means a structure or part
government in violation of this section may maintain a cause of
389
of a structure used as a home, residence, or sleeping place by
action for damages in the county in which the property is
390
at least one person. The term includes a single-family home, a
located.
As used in this paragraph, the term “housing
391
townhouse as defined in s. 481.203, and a duplex, triplex, or
organization” means a trade or industry group that constructs or
392
quadruplex, and their curtilage.
manages housing units, a nonprofit organization that provides or
393
(g)
“Shared space” means a driveway, an alley, or a common
advocates for increased access or reduced barriers to housing,
394
open space, such as a courtyard or pocket park.
or a nonprofit organization that is engaged in public policy
395
(h)
“Subdivision” means the division of a parent parcel
research, education, or outreach that includes housing
-
policy
396
into nine or more lots. The term includes streets, alleys,
related issues.
397
additions, and resubdivisions.
(b)1.
In a proceeding under this subsection, an aggrieved
398
(4)(a)1.
A local government may not adopt land development
or adversely affected party is entitled to the summary procedure
399
regulations that govern lots on residential real property,
provided in s. 51.011, and the court shall advance the cause on
400
unless such adoption:
the calendar. The court shall review the evidence de novo and
401
a.
Is in furtherance of a compelling governmental interest.
enter written findings of fact based on the preponderance of the
402
b.
Is the least restrictive means of furthering that
evidence that a local government has imposed a regulation in
403
compelling governmental interest.
violation of this section.
404
2.
Subparagraph 1. does not apply to land development
An aggrieved or adversely affected party shall prevail
405
regulations that:
in an action filed under this subsection unless the local
406
government demonstrates to the court by clear and convincing
407
evidence that the regulation is:
408
a.
Prevent or abate a nuisance.
407
b.
Enforce the terms of a license, a permit, or an
408
authorization.
In furtherance of a compelling governmental interest;
409
c.
Enforce any requirement imposed by federal law.
and
410
d.
Is the result of a final, nonappealable judicial
411
determination.
412
3.
Any ambiguity in the adoption of land development
413
regulations by a local government must be construed in favor of
414
the basic right to acquire and possess land.
415
(b)
If a lot on residential real property is connected to a
416
public water system or a public sewer system, or will be
417
connected to such a system as part of a subdivision plan, a
418
local government may not adopt land development regulations
419
that:
420
1.
Require a minimum lot size that is greater than 1,200
421
square feet for an existing lot and for lots created by a lot
422
split or subdivision.
423
2.
Contain a provision defining a residential dwelling unit
424
that is contrary to the definition in subsection (3).
425
3.
Prohibit, limit, or otherwise restrict the development
426
of residential dwelling units.
427
4.
Require a minimum setback that is greater than: 0 feet
428
from the sides; 10 feet from the rear; or 20 feet from the
429
front, or 0 feet from the front if the lot fronts or abuts a
430
shared space.
431
5.
Require a minimum dimension of a lot, including its
432
width or depth, to exceed 20 feet if the lot meets the relevant
433
minimum lot size requirement.
434
6.
Require more than 30 percent of lot area to be reserved
435
for open space or permeable surface.
436
7.
Require a maximum building height of less than three
437
stories or 35 feet above grade or, if applicable, three stories
438
or 35 feet above the base flood elevation established by the
439
Federal Emergency Management Agency.
440
8.
Require a maximum floor area ratio of less than 3.
441
9.
Require the property owner to occupy the property.
442
10.
Require a minimum size for a residential dwelling unit
443
that is greater than the minimum size imposed by the Florida
444
Building Code.
445
11.
Require a maximum residential density, typically
446
measured in dwelling units per acre, which is more restrictive
447
than the requirements of this subsection.
448
(5)(a)1.
Land development regulations adopted by a local
449
government must allow a lot to front or abut a shared space
450
instead of a public right-of-way. However, such regulations may
451
not be adopted to require a minimum number of parking spaces
452
greater than one per residential dwelling unit for lots that are
453
4,000 square feet or less, or any minimum number of parking
454
spaces for lots within a one-half mile radius of a permanent
455
public transit stop that is open for public use on or after July
456
1, 2026.
457
2.
As used in subparagraph 1., the term “public transit
458
stop” means a stop or station used for public purposes for
459
transit services, including bus rapid transit services or
460
commuter rail services, an intercity rail transportation system,
461
or a rail system, as defined in s. 341.301. The term does not
462
include people-mover systems in a public-use airport as defined
463
by s. 332.004.
464
(b)
Land development regulations adopted by a local
465
government which establish criteria for the application for, or
466
approval of, the proposed development of a lot split are limited
467
to the following:
468
1.
The requirement that an applicant provide the relevant
469
documentation and pay a fee for the cost of review of such
470
documentation. Any other fee imposed on the application for, or
471
approval of, a lot split is prohibited.
472
2.
Required compliance with the local government’s land
473
development regulations that govern lots not created by a lot
474
split.
475
3.
The requirement that the parent parcel was not created
476
by a lot split or subdivision during the previous 12 months.
477
(6)(a)
Upon receipt of a development application, a local
478
government shall confirm receipt of the application by the next
479
business day using the contact information provided by the
480
applicant. Within 7 business days after receiving an
481
application, a local government shall review the application for
482
completeness and issue a written notification to the applicant
483
indicating that all required information is submitted or specify
484
in writing with particularity any areas that are deficient. If
485
the application is deficient, the applicant has 60 business days
486
to address the deficiencies by submitting the required
487
additional information. Within 7 business days after receipt of
488
such information, a local government shall issue a written
489
notification to the applicant indicating that all required
490
information is submitted or specify in writing with
491
particularity any areas that are deficient. A local government
492
shall administratively approve an application within 20 business
493
days after the local government has deemed the application
494
complete and no further action or approval by the local
495
government is required. Any denial of the application must
496
include written findings supporting the local government’s
497
decision. At any point during the timeframes specified in this
498
subsection, an applicant may request, and a local government
499
must grant, an extension of time for up to 60 business days.
500
However, a local government may not request an extension of time
501
or require an applicant to request an extension of time.
502
(b)
If a local government fails to:
503
1.
Issue a written notification of completeness or written
504
specification of areas of deficiency within the first 7
505
business-day time period provided in paragraph (a);
506
2.
Issue a written notification of completeness or written
507
specification of areas of deficiency within the second 7
508
business-day time period provided in paragraph (a); or
509
3.
Approve an application within the 20-business-day time
510
period contained in paragraph (a),
511
512
the application is deemed approved, and the local government
513
must issue written notification of approval by the next business
514
day.
515
(c)
A local government must issue a refund to an applicant
516
equal to 100 percent of the application fee if the local
517
government fails to issue written notification of completeness
518
or written specification of areas of deficiency within 7
519
business days after receiving the additional information
520
pursuant to paragraph (a).
521
(7)(a)
Land development regulations adopted by a local
522
government which govern lot splits on historic property as
523
defined in s. 267.021 may not vary from land development
524
regulations adopted governing historic property without such lot
525
splits.
526
(b)
Paragraph (a) does not apply to land development
527
regulations adopted to prohibit the demolition or alteration of
528
a structure or building that is individually listed in the
529
National Register of Historic Places, or that is a contributing
530
structure or building within a historic district which was
531
listed in the National Register of Historic Places before
532
January 1, 2000.
533
(8)(a)
A real property owner or housing association subject
534
to land development regulations adopted by a local government in
535
violation of this section may maintain a cause of action for
536
damages in the county in which the property is located.
537
(b)1.
In a proceeding under this subsection, an aggrieved
538
or adversely affected party is entitled to the summary procedure
539
provided in s. 51.011, and the court shall advance the cause on
540
the calendar. The court shall review the evidence de novo and
541
enter written findings of fact based on the preponderance of the
542
evidence that a local government has adopted a land development
543
regulation in violation of this section.
544
2.
An aggrieved or adversely affected party shall prevail
545
in an action filed under this subsection unless the local
546
government demonstrates to the court by clear and convincing
547
evidence that the land development regulation is:
548
a.
In furtherance of a compelling governmental interest.
549
b.
The least restrictive means of furthering the compelling
550
411
governmental interest.
551
412
(c)
The court may do any of the following:
552
413
1.
Enter a declaratory judgment as is provided by chapter
553
414
86.
554
415
2.
Issue a writ of mandamus.
555
416
3.
Issue an injunction to prevent a violation of this
556
417
section.
557
418
4.
Remand the matter to the land development regulation
558
419
commission for action consistent with the judgment.
559
560
420
(d)
TheA prevailing plaintiff is entitled to recover reasonable
561
421
reasonable attorney fees and costs, including reasonable appellate attorney
562
422
appellate attorney fees and costs.
563
423
(9)
This section waives sovereign immunity for any local
564
424
government to the extent liability is created in this section.
565
425
(10)
This section does not prohibit:, limit, or otherwise
566
426
restrict a condominium association, a homeowners’ association,
427
or a cooperative from adopting or approving governing documents,
428
or a property owner from establishing deed restrictions, if such
429
adoption, approval, or establishment is voluntary and not
430
imposed by a local government. If such adoption, approval, or
431
establishment is imposed by the local government, the governing
432
document or deed restriction, as applicable, is deemed a local
433
government regulation under this section and is void and
434
unenforceable to the extent that it conflicts with this section.
435
(1
1
) This section applies retroactively to any local
436
government regulation that is contrary to this section or its
437
intent. This section is remedial and shall be liberally
438
construed to effectuate its intent. Any local government
439
regulation contrary to this section is void and unenforceable to
440
the extent that it conflicts with this section.
441 Section 4. Present subsection (17) of section 163.514,
442 Florida Statutes, is redesignated as subsection (18), and a new
443 subsection (17) is added to that section, to read:
444 163.514 Powers of neighborhood improvement districts.
445 Unless prohibited by ordinance, the board of any district shall
446 be empowered to:
447
(17)
P
lan, finance, or
complete
structural
safety or
448
building
compliance improvements, including
improvements
449
required under state or local structural
recertification
450
programs, if such improvements are approved by:
451
(a)
The governing documents of a condominium association, a
567
homeowners’ association, or a cooperative adopted or approved
568
before July 1, 2026.
569
A majority vote of the district’s residents; or
452
(b)
An advisory council composed of residents of the
453
Anydistrict, deedif restrictionssuch a council has been established beforeby July 1, 2026.local
570
571
However, if recorded in the official records on or after July 1,
572
2026, any such documents or restrictions are void and
573
unenforceable to the extent that they conflict with this
574454
section.
575 Section 4. Subsection (3) of section 177.071, Florida
576 Statutes, is amended to read:
577 177.071 Administrative approval of plats or replats by
578 designated county or municipal official.—
579 (3)
The governing body of a county or municipality shall
580
follow the application procedures established in s. 163.3254(6)
581
upon receiving a plat or replat under this part
Unless the
582
applicant requests an extension of time, the administrative
583
authority shall approve, approve with conditions, or deny the
584
plat or replat submittal within the timeframe identified in the
585
written notice provided to the applicant under subsection (2).
586
If the administrative authority does not approve the plat or
587
replat, it must notify the applicant in writing of the reasons
588
for declining to approve the submittal. The written notice must
589
identify all areas of noncompliance and include specific
590
citations to each requirement the plat or replat submittal fails
591
to meet. The administrative authority, or an official, an
592
employee, an agent, or a designee of the governing body, may not
593
request or require the applicant to file a written extension of
594
time
ordinance pursuant to
s.
163.506
.
595455 Section 5. ThisSubsection act(6) shallis takeadded effectto Julysection 1177.071, 2026.
456 Florida Statutes, to read:
457 177.071 Administrative approval of plats or replats by
458 designated county or municipal official.—
459
(6) Subsection (3) does not apply to
a plat or a replat
460
under this part for a residential lot as
defined in s.
461
163.3254(3). For such
plats and replats
, the administrative
462
authority shall follow the application procedures established in
463
s. 163.3254(
7
).
464 Section 6. Section 553.382, Florida Statutes, is amended to
465 read:
466 553.382 Placement of certain housing.—Notwithstanding any
467 other law or ordinance to the contrary, in order to expand the
468 availability of affordable housing in this state, any
469 residential manufactured building that is certified under this
470 chapter by the department may be placed on a mobile home lot in
471 a mobile home park
, recreational vehicle park,
or mobile home
472 condominium, cooperative, or subdivision
or on any lot in a
473
recreational vehicle park
. Any such housing unit placed on a
474 mobile home lot is a mobile home for purposes of chapter 723
475 and, therefore, all rights, obligations, and duties under
476 chapter 723 apply, including the specifics of the prospectus.
477 However, a housing unit subject to this section may not be
478 placed on a mobile home lot without the prior written approval
479 of the park owner. Each housing unit subject to this section
480
which is placed on a mobile home lot
shall be taxed as a mobile
481 home under s. 320.08(11) and is subject to payments to the
482 Florida Mobile Home Relocation Fund under s. 723.06116.
483 Section 7. Section 553.385, Florida Statutes, is created to
484 read:
485
553.385
Zoning of off-site constructed residential
486
dwellings; parity
.—
487
(1) As used in this section, the term:
488
(a) “Local government” means a county or municipality.
489
(b) “
Off-site constructed residential dwelling” means a
490
manufactured building as defined in
s.
553.36
which
is intended
491
for single-family residential use
,
or a manufactured home as
492
defined in s. 320.01(2)(b)
,
which is
constructed in whole or
in
493
part off-site
and is
treated as real property.
494
(2)(a)
An off-site constructed residential dwelling must be
495
permitted as of right in any zoning district where single-family
496
detached dwellings are allowed.
497
(b)
A local government may not adopt or enforce any zoning,
498
land
use, or development regulation that treats an off-site
499
constructed residential dwelling differently or more
500
restrictively than a single-family site-built dwelling allowed
501
in the same district.
502
(c) This section does not prohibit
a local government from
503
applying generally applicable architectural, aesthetic, design,
504
setback, height, or bulk standards to off-site constructed
505
residential dwellings, provided such standards apply equally to
506
site-built single-family dwellings permitted in the same
507
district.
A local government may adopt compatibility standards
508
that are
limited to the following architectural features:
509
1.
Roof pitch
.
510
2.
Square footage of livable space
.
511
3.
Type and quality of exterior finishing materials
.
512
4.
Foundation enclosure
.
513
5.
Existence and type of attached structures
.
514
6.
Building s
etback
s
, lot dimension
s
, and
the
orientation
515
of the home on the lot.
516
(d)
A
local government may not treat
off-site constructed
517
residential dwelling
s
differently
than
factory-built building
s
518
subject to s. 553.38 based on the method or location of
519
construction.
520
(3)
A local government may not adopt or enforce any zoning,
521
land
use, or development ordinance or regulation that conflicts
522
with this section or s. 553.38 or that imposes different or more
523
restrictive treatment on an off-site constructed residential
524
dwelling based on its method of construction or the presence of
525
components built off
site.
Local government ordinances and
526
regulations may
not have the effect of excluding off-site
527
constructed residential dwellings and
must
be reasonable and
528
uniformly enforced without any distinction as to the type of
529
housing. Any such
ordinance or regulation
is void and
530
unenforceable as applied to
off-site constructed residential
531
dwellings
.
532 Section 8. This act shall take effect July 1, 2026.