Florida Senate
-
2026
CS for SB 558
By
the Committee on Environment and Natural Resources; and
SenatorSenators Burgess and Sharief
23-00616A-26592-02261-26 2026558__2026558c1
1 A bill to be entitled
2 An act relating to standards for storm waterstormwater systems;
3 creating ss. 125.5695 and 166.04815, F.S.; requiring
4 storm waterstormwater systems inowned by counties and municipalities,
5 municipalities, respectively, to comply with specified Department of
6 Department of Transportation standards; providing inspection
7 inspection requirements for such systems; specifying that certain
8 that certain local standards are superseded; providing a
9 a declaration of an important state interest; providing
10 providing an effective date.
11
5 unchanged paragraphs
12 Be It Enacted by the Legislature of the State of Florida:
13
14 Section 1. Section 125.5695, Florida Statutes, is created
15 to read:
16
125.5695
Standards for storm waterstormwater systems.—
17
(1)
All storm waterstormwater systems owned by counties in this state, including storm pipe and storm
18
structures in counties in this state, when installing new storm
when installing new storm pipe and storm structures, must follow
19
pipe and storm structures, must follow the annual Department of
the annual Department of Transportation’s Standard
20
Transportation’s Standard Specifications for Road and Bridge
Road and Bridge Construction
contained in the
21
Construction contained in the sections “Pipe Culverts” and “Pipe Liner,” except for any
22
Liner.”
requirement that the Department of Transportation review or
23
approve installation plans, inspection videos, or inspection
24
reports.
25
(2)
Final inspections for all storm pipe and storm
24
structures in counties in this state must be performed by a
25
NASSCO’s Pipeline Assessment Certification Program (PACP)
26
structures owned by counties in this state must be performed by
27
a NASSCO’s Pipeline Assessment Certification Program (PACP)
28
certified technician who is employed by a third-party licensed
27
engineering firm that does not have a controlling interest in
28
the company that installed the storm system being inspected. The
29
inspection and video process may use standard closed-circuit
engineering firm or any general contractor that does not have a
30
television inspection equipment, along with an optional camera
controlling interest in the company that installed the storm
31
with a fisheye lens for video inspection purposes.
system being inspected. The inspection and video process may use
32
standard closed-circuit television inspection equipment, along
33
with an optional camera with a fisheye lens for video inspection
34
purposes.
35
(3)
The standards for installation and inspection in
3336
subsections (1) and (2) supersede all existing and local
3437
standards in counties.
3538 Section 2. Section 166.04815, Florida Statutes, is created
3639 to read:
37
40
166.04815
Standards for storm waterstormwater systems.—
38
41
(1)
All storm waterstormwater systems, includingowned stormby pipemunicipalities andin stormthis
39
structures in municipalities in this state, when installing new
40
storm pipe and storm structures, must follow the annual
41
Department of Transportation’s Standard Specifications for Road
42
and Bridge Construction contained in the sections “Pipe
state, when installing new storm pipe and storm structures, must
43
Culverts” and “Pipe Liner.”
follow the annual Department of Transportation’s Standard
44
(2)
Final inspections for all storm pipe and storm
Specifications for Road and Bridge Construction contained in the
45
structures in municipalities in this state must be performed by
sections “Pipe Culverts” and “Pipe Liner
,” except for any
46
a NASSCO’s Pipeline Assessment Certification Program (PACP)
requirement that the Department of Transportation review or
47
certified technician who is employed by a third-party licensed
approve installation plans, inspection videos, or inspection
48
engineering firm that does not have a controlling interest in
reports.
49
the company that installed the storm system being inspected. The
(2) Final inspections for all storm pipe and storm
50
inspection and video process may use standard closed-circuit
structures
owned by
municipalities in this state must be
51
television inspection equipment, along with an optional camera
performed by
a NASSCO’s Pipeline Assessment Certification
52
with a fisheye lens for video inspection purposes.
Program (PACP) certified technician who is employed by a third
53
party licensed engineering firm
or any general contractor
that
54
does not have a controlling interest
in the company that
55
installed the storm system being inspected. The inspection and
56
video process may use standard closed-circuit television
57
inspection equipment, along with an optional camera with a
58
fisheye lens for video inspection purposes.
59
(3)
The standards for installation and inspection in
54
60
subsections (1) and (2) supersede all existing and local
55
61
standards in municipalities.
5662 Section 3.
Pursuant to s. 18, Article VII of the State
57
63
Constitution, the Legislature hereby determines and declares
58
64
that this act fulfills an important state interest.
5965 Section 4. This act shall take effect July 1, 2026.