1 A bill to be entitled

2 An act relating to qualified contractors; creatingamending sss.

3 163125.3169022 and 166.033, F.S.; providingrequiring legislativeeach findings;county and

4 municipality, respectively, of a specified size to

5 create and implement a program for the purpose of

6 making development preapplication consultation

7 services available at an applicant’s request;

8 providing that specified provisions may not be

49 definingconstrued terms;to requiringaffect or require the governing bodymodification of a

10 certain county or municipality programs that make

11 available the same or substantially similar

12 development preapplication consulting services if such

13 county or municipality’s program existed before a

514 local government, by a specified date,; tolimiting createsuch apreapplication

15 consultation services to applications for certain

616 programpermits; thatauthorizing authorizesa ancounty applicantor municipality to use a

717 qualified contractor or qualified contractor firm to conduct a preapplication

18 fulfill specified preapplication services

19 requirements; specifying minimum requirements for a

20 development preapplication consultation services

21 program; requiring a county or municipality to take

22 certain actions if an applicant chooses to use the

23 development preapplication consultation services

824 review of an applicationprogram; requiring thea governingcounty bodyor municipality to

25 approve, approve with conditions, or deny an

26 applicant’s completed application within a specified

27 timeframe; requiring that an application be deemed

28 approved by operation of law without conditions and

29 proceed in a specified manner if a county or

30 municipality fails to make a certain determination

931 towithin establisha certainspecified processestimeframe; providing construction;

32 specifying that certain requirements apply if an

33 applicant for a development permit or development

34 order is not eligible for, does not request, or elects

35 not to use the county’s or municipality’s

1036 specificationspreapplication forconsulting suchservices program; prohibiting certaincreating

1137 additionals. requirements163.3169, F.S.; defining terms; requiring a local government

38 government to establish a registry of a specified

39 number of qualified contractors or qualified

40 contractor firms to conduct certain preapplication

41 services; prohibiting a qualified contractor or

42 qualified contractor firm from having a conflict of

1243 tointerest; deemauthorizing an applicationapplicant thatto satisfiesuse specifieda qualified

13 provisions administratively complete for certain

44 contractor that is not on the registry if a conflict

45 of interest exists; authorizing a local government to

46 enter into a certain agreement with another local

1447 purposesgovernment under certain circumstances; prohibiting the program from imposinga

48 local government from adding its own employees to the

49 registry; authorizing an applicant to retain a

50 qualified contractor or qualified contractor firm of

51 his or her choosing for preapplication consultation

52 services under certain circumstances; prohibiting a

1553 additionallocal termsgovernment from conditioning, conditionsdenying, or duplicative review

54 delaying an applicant’s selection or use of a

55 qualified contractor or qualified contractor firm;

1656 processes; providingspecifying that the programapplicant mayis allowresponsible for all

57 fees and costs associated with using a qualified

58 contractor of his or her choice; requiring a local

59 government to make certain resources available if an

60 applicant uses a qualified contractor or qualified

1761 thecontractor reviewfirm of ownershiphis authorizationsor forher thechoosing to perform

62 preapplication consultation services; providing an

1863 development of the propertyexception; providing construction; providing that

64 specified requirements relating to the use of

65 qualified contractors or qualified contractor firms to

1966 requiring theperform development servicespreapplication office of a localconsultation

67 services do not apply to certain property identified

68 within a permit application; providing applicability;

69 providing construction; amending s .177.071, F.S.;

2070 governmentauthorizing a governing body to establish a registry ofuse a specified

21 number of qualified contractors to conduct

71 registry to supplement local government staff

72 resources; prohibiting a local government from

73 creating, establishing, or applying any additional

74 local procedure or condition for the administrative

75 approval of a plat or replat which is inconsistent

2276 preapplicationwith reviewsspecified provisions; authorizing the development

77 administrative authority to receive and act upon

78 certain financial assurances; providing requirements

2379 services office offor a local governmentgovernment’s toacceptance registerof morecertain

80 financial assurances; amending s. 177.073, F.S.;

2481 or less thanrevising the specified numberdefinition of qualifiedthe term “applicant”;

82 requiring the governing body of certain local

2583 contractorsgovernments underand counties to include certain circumstances; authorizing a

84 developments in a program that expedites the process

85 for issuing building permits for planned unit

86 developments or phases of a community or subdivision;

87 specifying automatic actions in the event the local

88 government fails to adopt, update, or modify a certain

89 program by a specified date; defining the term

90 “conflict of interest”; providing construction;

2691 localrequiring governmenta governing body to entercreate intoa an agreement withtwo-step

92 application process for stabilized access roads that

93 can support emergency vehicles; revising requirements

94 for such application process; authorizing an applicant

95 to use a qualified contractor for land use approvals

2796 another local government under certain circumstances; authorizing a governing

97 body to use the qualified contractor registry

98 established pursuant to this act to supplement staff

99 resources; deleting provisions prohibiting the use of

100 a qualified contractor with a conflict of interest;

101 defining the term “approved plans”; providing

28102 construction; prohibiting a local government from adding its own

103 conditioning, delaying, withholding, or denying the

104 issuance of certain permits under certain

105 circumstances; providing applicability; providing

29106 employees to the registryconstruction; requiringauthorizing a local government to waive

30107 government to usea certain contractbond termsrequirement andunder certain

108 circumstances; revising the circumstances under which

109 an applicant has a vested right in a preliminary plat;

31110 conditions;providing prohibitingan aeffective local government fromdate.

32 drafting or applying contractual terms that impose

33 certain obligations on qualified contractors;

34 requiring an applicant to have the right to use a

35 qualified contractor of his or her choosing to perform

36 the preapplication review under certain circumstances;

37 prohibiting a local government from conditioning,

38 denying, delaying, or otherwise contesting an

39 applicant’s selection or use of a qualified contractor

40 of his or her choosing, except upon a certain

41 determination; providing that an applicant has sole

42 discretion to choose a qualified contractor from the

43 registry; specifying requirements for payment to the

44 qualified contractor; requiring a local government to

111

112 Be It Enacted by the Legislature of the State of Florida:

113

45114 reduceSection any1. Section application125.022, feeFlorida byStatutes, ais certainamended amount if theto

115 read:

46116 applicant125.022 Development usespermits aand qualified contractor fororders

; development

117

47 preapplication review;consulting specifyingservices requirementsprogram forrequired

48 such fee reduction; requiring fees to be reasonably

49 related to certain actual costs; requiring a

50 development services office to provide a qualified

51 contractor conducting a preapplication review with

52 access to certain resources; providing construction;

53 requiring a local government to conduct a

54 preapplication review within specified timeframes if

55 the applicant does not use a qualified contractor;

56 authorizing an applicant to use a qualified contractor

57 from the registry, at the expense of the local

58 government, if the local government fails to process

59 the application in the required time under certain

60 conditions; providing for the automatic acceptance of

61 certain applications; authorizing a qualified

62 contractor to conduct preapplication reviews only of

63 applications relating to the disciplines covered by

64 the qualified contractor’s licensure; prohibiting a

65 qualified contractor from conducting a preapplication

66 review under certain circumstances; requiring a

67 qualified contractor to determine if an application is

68 in compliance with specified regulations; requiring a

69 qualified contractor to work with the applicant to

70 resolve deficiencies; requiring a qualified contractor

71 to prepare an affidavit for the preapplication review

72 upon making a certain determination; specifying

73 requirements for such affidavit; requiring the

74 development services office to make a certain

75 determination on the application upon receipt of such

76 affidavit; requiring the development services office

77 to take certain actions upon its determination;

78 providing that an application determined to be

79 administratively complete does not constitute

80 substantive approval of the permit; providing

81 construction; prohibiting the development services

82 office from conducting duplicative review of the

83 permit subject to preapplication review; specifying

.—

118

(1)(a)

By January 1, 2027, each county with a population of

119

75,000 or greater shall create and implement a program for the

120

84 the purpose of themaking available development services office’spreapplication

85 review; prohibiting the development services office

86 from re-reviewing materials subject to preapplication

87 review; providing an exception; providing that

88 inconsistent local provisions are preempted, void, and

89 unenforceable; providing construction; providing

90 disciplinary guidelines; authorizing a local

91 government to audit the work of qualified contractors;

92 specifying requirements for such auditing procedures;

93 providing construction; authorizing specified entities

94 to provide preapplication reviews for public works

95 projects; authorizing a civil action; authorizing the

96 award of attorney fees and costs; defining the term

97 “prevailing party”; prohibiting the award of attorney

98 fees, costs, or damages under certain circumstances;

99 amending s. 177.071, F.S.; prohibiting local

100 governments from creating, establishing, or applying

101 specified additional regulations for the approval of a

102 final plat; requiring a local government to designate

103 a certain administrative authority to take certain

104 actions relating to the approval of infrastructure

105 assurances; requiring a local government to accept

106 certain forms of surety instruments; providing

107 requirements for local government review of such

108 surety instruments; amending s. 177.073, F.S.;

109 revising the definition of the term “applicant”;

110 requiring the governing body of certain local

111 governments and counties to include multi-phased

112 developments in a program that expedites the process

113 for building permits for planned unit developments or

114 phases of a community or subdivision; specifying

115 automatic actions in the event that the local

116 government fails to adopt, update, or modify a certain

117 program by a specified date; providing construction;

118 requiring a governing body to create a two-step

119 application process for stabilized access to roads

120 that can support emergency vehicles; revising

121 requirements for such application process; authorizing

122 an applicant to use a qualified contractor for land

123 use approvals under certain circumstances; increasing

124 the number of qualified contractors on a specified

125 registry; authorizing an applicant to retain a private

126 provider or qualified contractor to process, review,

127 and expedite an application for a preliminary plat or

128 related plans under certain circumstances; defining

129 the term “conflict of interest”; requiring an

130 applicant to replace a qualified contractor or private

131 provider if a conflict of interest is discovered;

132 prohibiting a governing body from restricting an

133 applicant’s use of a private provider or qualified

121

consultation services at an applicant’s request. This subsection

122

134 contractor;may requiringnot be construed to affect or require the governingmodification bodyof to accept,a

135 process, and act upon the such private provider’s or

136 qualified contractor’s reviews, approvals,

137 recommendations, or certifications under certain

138 circumstances and in a specified manner; authorizing a

139 governing body to take certain actions; prohibiting a

140 governing body from imposing certain requirements;

141 requiring an applicant to be responsible for certain

142 fees and costs; voiding and preempting conflicting

143 provisions; defining the term “approved plans”;

144 providing construction; prohibiting a local government

145 from conditioning, delaying, withholding, or denying

146 the issuance of certain permits under certain

147 circumstances; providing applicability; providing

148 construction; authorizing a local government to waive

149 certain bonding requirements under certain

150 circumstances; revising the circumstances under which

151 an applicant has a vested right in a preliminary plat;

152 providing an effective date.

123

county program that makes available the same or substantially

124

similar development preapplication consulting services to an

125

applicant for a development permit or development order,

126

including a program that requires mandatory preapplication

127

meetings for specified types of developments, if such county

128

program exists on or before July 1, 2026.

129

1.

The preapplication consultation services authorized in

130

this subsection are limited to those applications for permits as

131

defined in s. 163.3169.

132

2.

The county may use a qualified contractor or a qualified

133

contractor firm as defined in s. 163.3169 to fulfill the

134

preapplication consultation services required in this

135

subsection.

136

(b)

A development preapplication consultation services

137

program must, at minimum, provide all of the following:

138

1.

The minimum information that must be submitted in an

139

application for a permit as defined in s. 163.3169.

140

2.

The review and precertification of completeness of the

141

application and all related documents, including site

142

engineering plans or site plans or their functional equivalent,

143

or plats, and their compliance with all relevant existing land

144

development regulations.

145

(c)

If an applicant chooses to use the development

146

preapplication consultation services program, the county, upon

147

receipt of the proposed development application, shall confirm

148

receipt, verify completeness, and issue a written notification

149

to the applicant indicating that all required information has

150

been submitted, or specify in writing with particularity any

151

deficiencies in the application, within 5 business days. If the

152

application is deficient, the applicant has 30 days to address

153

154 Be It Enacted by the Legislature of the State of Florida:

the deficiencies by submitting the required additional

154

information. If the county fails to issue the written

155

156 Section 1. Section 163.3169, Florida Statutes, is created

157 to read:

notification within 5 business days, the application is deemed

156

complete by operation of law without conditions, and the county

157

must process the application as required in paragraph (d).

158

(d)1.

Upon receipt of the applicant’s completed

159

application, the county must process the application for final

160

action and must approve, approve with conditions, or deny the

161

application within 45 days after submission of a complete

162

application, except the county may not review again those plans

163

specified in subparagraph (b)2.

164

2.

If the county fails to take final action to approve,

165

approve with conditions, or deny the application within 45 days,

166

the applicant shall notify the county in writing. If the county

167

fails to respond within 10 days, the application is deemed

168

approved by operation of law without conditions, and the

169

applicant is entitled to proceed with the proposed activity or

170

development as though the county had granted unconditional

171

approval. Approval pursuant to this subparagraph may not be

172

construed to relieve the applicant of the obligation to comply

173

with all other applicable federal, state, and local laws,

174

regulations, and ordinances.

175

(2)

If an applicant

for a development permit or development

176

order is not eligible, does not request, or elects not to use

177

the county’s development preapplication consulting services

178

program pursuant to subsection (1), all of the following

179

requirements shall apply:

180

(a)

(1)

A county shall specify in writing the minimum

181 information that must be submitted in an application for a

182 zoning approval, rezoning approval, subdivision approval,

183 certification, special exception, or variance. A county shall

184 make the minimum information available for inspection and

185 copying at the location where the county receives applications

186 for development permits and orders, provide the information to

187 the applicant at a preapplication meeting, or post the

188 information on the county’s website.

189

(b)1.

(

2)

Within 5 business days after receiving an

190 application for approval of a development permit or development

191 order, a county shall confirm receipt of the application using

192 contact information provided by the applicant. Within 30 days

193 after receiving an application for approval of a development

194 permit or development order, a county must review the

195 application for completeness and issue a written notification to

196 the applicant indicating that all required information is

197 submitted or specify in writing with particularity any areas

198 that are deficient. If the application is deficient, the

199 applicant has 30 days to address the deficiencies by submitting

200 the required additional information.

201

2.

For applications that do not require final action

202 through a quasi-judicial hearing or a public hearing, the county

203 must approve, approve with conditions, or deny the application

204 for a development permit or development order within 120 days

205 after the county has deemed the application complete.

206

3.

For applications that require final action through a

207 quasi-judicial hearing or a public hearing, the county must

208 approve, approve with conditions, or deny the application for a

209 development permit or development order within 180 days after

210 the county has deemed the application complete.

211

4.

Both parties may agree in writing or in a public meeting

212 or hearing to an extension of time, particularly in the event of

213 a force majeure or other extraordinary circumstance. An

214 approval, approval with conditions, or denial of the application

215 for a development permit or development order must include

216 written findings supporting the county’s decision.

217

218 The timeframes contained in this

paragraph

subsection

do not

219 apply in an area of critical state concern, as designated in s.

220 380.0552. The timeframes contained in this

paragraph

subsection

221 restart if an applicant makes a substantive change to the

222 application. As used in this

paragraph

subsection

, the term

223 “substantive change” means an applicant-initiated change of 15

224 percent or more in the proposed density, intensity, or square

225 footage of a parcel.

226

(c)1.

(3)(a)

When reviewing an application for a development

227 permit or development order that is certified by a professional

228 listed in s. 403.0877, a county may not request additional

229 information from the applicant more than three times, unless the

230 applicant waives the limitation in writing.

231

2.

(b)

If a county makes a request for additional

232 information and the applicant submits the required additional

233 information within 30 days after receiving the request, the

234 county must review the application for completeness and issue a

235 letter indicating that all required information has been

236 submitted or specify with particularity any areas that are

237 deficient within 30 days after receiving the additional

238 information.

239

3.

(c)

If a county makes a second request for additional

240 information and the applicant submits the required additional

241 information within 30 days after receiving the request, the

242 county must review the application for completeness and issue a

243 letter indicating that all required information has been

244 submitted or specify with particularity any areas that are

245 deficient within 10 days after receiving the additional

246 information.

247

4.

(d)

Before a third request for additional information,

248 the applicant must be offered a meeting to attempt to resolve

249 outstanding issues. If a county makes a third request for

250 additional information and the applicant submits the required

251 additional information within 30 days after receiving the

252 request, the county must deem the application complete within 10

253 days after receiving the additional information or proceed to

254 process the application for approval or denial unless the

255 applicant waived the county’s limitation in writing as described

256 in

subparagraph

1.

paragraph (a)

.

257

5.

(e)

Except as provided in

subsection (4)

subsection (7)

,

258 if the applicant believes the request for additional information

259 is not authorized by ordinance, rule, statute, or other legal

260 authority, the county, at the applicant’s request, shall proceed

261 to process the application for approval or denial.

262

(d)

(4)

A county must issue a refund to an applicant equal

263 to:

264

1.

(a)

Ten percent of the application fee if the county

265 fails to issue written notification of completeness or written

266 specification of areas of deficiency within 30 days after

267 receiving the application.

268

2.

(b)

Ten percent of the application fee if the county

269 fails to issue a written notification of completeness or written

270 specification of areas of deficiency within 30 days after

271 receiving the additional information pursuant to

subparagraph

272

(c)2.

paragraph (3)(b

).

273

3.

(c)

Twenty percent of the application fee if the county

274 fails to issue a written notification of completeness or written

275 specification of areas of deficiency within 10 days after

276 receiving the additional information pursuant to

subparagraph

277

(c)3.

paragraph (3)(c)

.

278

4.

(d)

Fifty percent of the application fee if the county

279 fails to approve, approves with conditions, or denies the

280 application within 30 days after conclusion of the 120-day

281

timeframe specified in subparagraph (b)2.

or

the

180-day

282 timeframe specified in

subparagraph (b)3.

subsection (2)

.

283

5.

(e)

One hundred percent of the application fee if the

284 county fails to approve, approves with conditions, or denies an

285 application 31 days or more after conclusion of the 120-day

286

timeframe specified in subparagraph (b)2.

or

the

180-day

287 timeframe specified in

subparagraph (b)3.

subsection (2)

.

288

289 A county is not required to issue a refund if the applicant and

290 the county agree to an extension of time, the delay is caused by

291 the applicant, or the delay is attributable to a force majeure

292 or other extraordinary circumstance.

293

(e)

(5)

When a county denies an application for a

294 development permit or development order, the county shall give

295 written notice to the applicant. The notice must include a

296 citation to the applicable portions of an ordinance, rule,

297 statute, or other legal authority for the denial of the permit

298 or order.

299

(

3

)

(6)

As used in this section, the terms “development

300 permit” and “development order” have the same meaning as in s.

301 163.3164, but do not include building permits.

302

(

4

)

(7)

For any development permit application filed with

303 the county after July 1, 2012, a county may not require as a

304 condition of processing or issuing a development permit or

305 development order that an applicant obtain a permit or approval

306 from any state or federal agency unless the agency has issued a

307 final agency action that denies the federal or state permit

308 before the county action on the local development permit.

309

(5)

(8)

Issuance of a development permit or development

310 order by a county does not in any way create any rights on the

311 part of the applicant to obtain a permit from a state or federal

312 agency and does not create any liability on the part of the

313 county for issuance of the permit if the applicant fails to

314 obtain requisite approvals or fulfill the obligations imposed by

315 a state or federal agency or undertakes actions that result in a

316 violation of state or federal law. A county shall attach such a

317 disclaimer to the issuance of a development permit and shall

318 include a permit condition that all other applicable state or

319 federal permits be obtained before commencement of the

320 development.

321

(6)

(9)

This section does not prohibit a county from

322 providing information to an applicant regarding what other state

323 or federal permits may apply.

324 Section 2. Section 163.3169, Florida Statutes, is created

325 to read:

326

163.3169 Using qualified contractors in development order

159

327

preapplication review.—

160

328

(1)

LEGISLATIVE FINDINGS.—

161

(a)

The Legislature recognizes the need for continued

162

growth throughout the state, and the need for an efficient

163

permitting process to accommodate such growth, while balancing

164

the role of local governments in community planning.

165

(b)

The Legislature further recognizes that numerous local

166

governments implement innovative planning and development

167

strategies by using the private sector to supplement the needs

168

of government and to keep pace with increasing populations,

169

unmet demands for housing, and continuing budget constraints. To

170

continue meeting future growth demands, all local governments

171

shall use all available resources to ensure that private

172

property owners seeking to build or develop the next generation

173

of this state’s housing supply are not burdened by limited local

174

government workforces and can by right use a qualified

175

contractor from the private sector to responsibly review

176

applications as submitted and authorized under this section.

177

(2)

DEFINITIONS.—As used in this section, the term:

178

329

(a) “Applicant” means a person or legal entity having a

179

330

legal or equitable ownership interest in real property, or an

180

331

authorized agent acting on behalf of such person or entity,

that

181

332

which

applies for a land development approval from the local

182

333

government pursuant to this section.

183

334

(b)

“Application” means a properly completed and submitted

184

335

request for a permit

,

request for a permit as defined herein, on behalf of an

185

336

applicant

,

which

includes an affidavit from a qualified

186

337

contractor as required by this section. The term does not

187

338

include plans or permits as reviewed under s. 553.791.

188

339

(c)

“Audit” means a limited, post-submittal verification

189

process conducted solely to confirm that a qualified

190

contractor’s“Conflict preapplicationof reviewinterest” supportshas the findingssame meaning as in thes.

191

required affidavit, demonstrate that the review was performed in

192

accordance with the normal and customary professional practices

193

for the applicable discipline, and

ensure

that the affidavit’s

194

findings are supported by the application.

195

340

112.312 and includes conflicts of interest recognized under

341

applicable licensing or certification standards applicable to

342

the qualified contractor.

343

(d)

d

)

“Development services office” means the entity, office,

196

344

division, or department of a local government

which is

197

345

responsible for reviewing applications for compliance with the

198

346

local government’s land development regulations and other

199

347

applicable federal, state, and local requirements. This office

200

348

may be substantively identical to or housed within the local

201

349

government’s planning and zoning department.

202

350

(e)

e

)

“Development services official” means the individual in

203

351

the development services office of the governing jurisdiction

204

352

who is

responsible for the direct regulatory administration or

205

353

supervision of the review and approval process required to

206

354

indicate compliance with applicable land development

207

355

regulations. The term includes any duly authorized designee of

208

356

such person. This individual may be the executive director of

209

357

the governing body of a local government or the division

210

358

director of the local government’s planning and zoning

211

359

department.

212

360

(

f

(f) “Final plat” has the same meaning as in s. 177.073.

213

361

(g)

g

)

“Governing body” has the same meaning as in s.

214

362

163.3164.

215

363

(h)

h

)

“Land development regulations” has the same meaning as

216

364

in s. 163.3164, but excludes building permits and plans subject

217

365

to s

.

553.791.

218

366

(i)

i

)

“Local government” means:

219

367

1.

A county that has 25,000

7

5,000

or more

residents, but does not

220

368

include a county subject to s. 380.0552;

221

or

369

2.

A municipality that has 10,000

or more

residents; or.

222

3.

An independent district created pursuant to chapter 189

223

370

(

j

) “Permit” means an authorization, approval, or grant by

371

a local governing body

which

orauthorizes chapter 190 with authority over landthe development regulations.of land

224

372

(j) “Permit”for meansany ansite authorization,plan or development plan approval, or grant byany

225

a local governing body or development services office that

226

authorizes the development of land as set forth therein for any

227

373

subdivision approval, platas approvaldefined in this section

,

or site plan approval. For

228

the purposes of this section, a permit does not include the

229

review and approval of discretionary land use decisions

,

such as

230

rezonings, variances, special exceptions, conditional uses,

231

comprehensive plan amendment

s

, or any other quasi-judicial land

232

use approval requiring a public hearing or findings supported by

233

competent substantial evidence.

.

234374

(k) “Plans” means site engineering plans or site plans, or

(k)

“Plans” has the same meaning as in s. 177.073.

235375

their functional equivalent, submitted by an applicant to a

(l)

“Plat or replat” has the same meaning as in s.

236376

qualified contractor or duly authorized representative for

177.031(14).

237377

review.

238

(

m

(l) “Preapplication review” means the analysis

of a permit

239

378

conducted by a qualified contractor to ensure compliance with a

240

379

comprehensive plan, chapter 177, and applicable land development

241

380

regulations, and which is part of the application as authorized

242

381

under this section.

243

382

(n)

(m) “Preliminary plat” meanshas athe mapsame ormeaning delineatedas in 177.073.

244

representation of the subdivision of lands which is a complete

245

and exact representation of the residential subdivision or

246

planned community and contains any additional information needed

247

to comply with the requirements of chapter 177.

248

383

(

o

(n) “Qualified contractor” means the individual or firm

249

384

that has demonstrated knowledge of and experience with the types

385

contractedof withpermits aor development servicesapprovals officespecified or localin

250

government to conduct a preapplication review, and who is

251

included in the registry as required by this section. The term

252

this section.

386

The term includes, but is not limited to, any of the following:

253

387

1.

An engineer or engineering firm licensed under chapter

254

388

471.

255

389

2.

A surveyor or mapper, or a surveyor’s or mapper’s firm

,

256

390

licensed under chapter 472.

257

391

3.

An architect or architecture firm licensed under part I

258

392

of chapter 481.

259

393

4.

A landscape architect or a landscape architecture firm

260

394

registered under part II of chapter 481.

261

395

5.

A planner certified by the American Institute of

262

396

Certified Planners.

263

with at least 5 years of relevant government

397

experience or at least 10 years of experience as an urban

398

planner if not certified

6.

A local government employee

399

(p)

“Qualified contractor firm” means a business

400

organization, including a corporation, partnership, business

401

trust, or other legal entity, which offers services under this

402

section to the public through licensees who act as agents,

403

employees, officers, or partners of the firm. A person who is

404

licensed as an engineer under chapter 471; a surveyor or mapper

405

licensed under chapter 472; an architect licensed under part I

406

of chapter 481; a landscape architect licensed under part II of

407

chapter 481; or who is certified by the American Institute of

408

Certified Planners with at least 5 years of relevant government

409

experience, or at least 10 years of relevant experience as an

410

urban planner if not certified, may act as a qualified

411

contractor for an agent, employee, or officer of the qualified

412

contractor firm.

413

(q)

“Site plan or development plan approval” means a site

414

development proposal, or its functional equivalent, including a

415

modification to an existing development approval,

which

is

416

expressly designated by the local government for administrative

417

review and approval by local government staff or a designated

418

administrative official, without the requirement of approval by

419

an appointed review board or a governing body and

which

does not

420

materially increase density, intensity, traffic, infrastructure

421

demand, environmental impacts, or significant offsite impacts,

422

and therefore does not require full site plan review or

423

discretionary policy review. The term includes approvals or

424

permits governed by objective, nondiscretionary standards that

425

are designated by the local government for administrative

426

approval by local government staff or an administrative official

427

and which also includes, but is not limited to approvals or

428

permits related to trees, signs, landscaping, and minor

429

modifications.

430

(

r

)

“Subdivision approval” or its functional equivalent,

431

including a modification, means an administrative review process

432

applicable to the division of land into a limited number of lots

433

which

does not create new public streets

or

require significant

434

public infrastructure improvements and does not materially

435

increase development impacts. The term applies only to approvals

436

expressly designated by the local government for administrative

437

review and approval by local government staff or a designated

438

administrator without the requirement of approval by an

439

appointed review board or a governing body. A subdivision

440

qualifies under this definition if it involves a number of lots

441

as specified by the local government, complies with all

442

applicable zoning, dimensional, access utility, and

443

environmental standards, and can be served by existing public

444

facilities or approved private systems, allowing the subdivision

445

to be reviewed for compliance with objective standards of land

446

development code and approved by local government staff or a

447

designated administrative official without requiring

448

discretionary policy determinations.

449

(

2

)

REGISTRY.—

450

(a)

By January 1, 2027, a

local government shall establish

451

a registry of at least

four

qualified contractors

or two

452

qualified contractor firms which the governing body shall use to

453

supplement the local government’s staff resources in ways

454

determined by the governing body upon the written request by an

455

applicant for fulfilling:

456

1.

The preapplication consultation services for permits

457

under s. 125.022(1) and s. 166.033(1);

458

2.

The requirements of s. 177.073 for processing and

459

expediting the review of an application for a preliminary plat

460

or any plans related to such application; or

461

3.

The requirements of s. 177.071 requiring the

462

administrative approval of a plat or replat.

463

(b)

A qualified contractor or a qualified contractor firm

464

on the registry which is hired pursuant to this section may not

465

have a conflict of interest. If a prohibitive conflict of

466

interest exists, the applicant may use an otherwise qualified

467

contractor.

468

(c)

A

local government may enter into an agreement with

469

another local government for the purpose of using public

470

employees who meet the requirements for a qualified contractor

471

to satisfy the minimum numerical requirements for qualified

472

contractors for the registry.

A local government may not add its

473

own employees to its own registry.

474

(d)

If a local government fails to establish or maintain

475

the registry, an applicant may, at its sole discretion, retain a

476

qualified contractor or a qualified contractor firm of the

477

applicant’s choosing to provide preapplication consultation

478

services, provided that the selected qualified contractor or

479

qualified contractor firm does not have a conflict of interest.

480

If a conflict of interest is identified after selection, the

481

applicant must promptly replace the qualified contractor or

482

qualified contractor firm with one that has no conflict of

483

interest.

484

(

e

)

The local government may not condition, deny,

or

delay

485

the applicant’s selection or use of

such

qualified contractor

or

486

qualified contractor firm

,

forand the limitedapplicant purposesis ofresponsible for

264

compliance with subsection (4)(c).

265

487

all fees and costs associated with the qualified contractor or

488

qualified contractor firm used in this manner.

489

(of)

“Single-trade review” means any review focused on a

266

single component of an application, such as engineering,

267

surveying, planning, or architectur

e

If an applicant uses a qualified contractor or a

490

qualified contractor firm for such purpose, the local government

491

must provide access to public records and information reasonably

492

necessary to perform preapplication consultation services. This

493

paragraph does not authorize the disclosure of records that are

494

confidential or exempt from public inspection or copying under

495

chapter 119 or any other applicable law, and access to such

496

records is provided only to the extent permitted by law. This

497

paragraph may not be construed to require a local government to

498

violate the licensing terms of proprietary software or related

499

vendor agreements.

500

(3)

APPLICABILITY; HISTORIC PRESERVATION.—

501

(a)

This section does not apply to an application for a

502

permit if the property that is the subject of the application

503

is:

504

1.

Individually listed in the National Register of Historic

505

Places or is a contributing property within a National Register

506

listed

historic district;

507

2.

Designated as a local historic landmark, historic

508

resource, or part of a locally designated historic district

509

under a duly adopted local historic preservation ordinance; or

510

3.

Subject to binding historic preservation review or

511

approval under federal,

state,

or local law, including review by

512

a local historic preservation board or commission.

513

(b)

If an application encompasses multiple parcels or

514

improvements, this subsection applies only to the portion of the

515

application that relates to property described in paragraph (a).

516

This subsection may not be construed to prohibit the use of a

517

qualified contractor for the portions of an application that do

518

not involve the property listed in paragraph (a).

519 Section 3. Section 166.033, Florida Statutes, is amended to

520 read:

521 166.033 Development permits and orders

; development

522

preapplication consulting services program required

.—

523

(1)(a)

By January 1, 2027, each municipality with a

524

population of 10,000 or greater shall create and implement a

525

program for the purpose of making available development

526

preapplication consultation services at an applicant’s request.

527

This subsection may not be construed to affect or require the

528

modification of a municipal program that makes available the

529

same or substantially similar development preapplication

530

consulting services to an applicant for a development permit or

531

development order, including a program that requires mandatory

532

preapplication meetings for specified types of developments, if

533

such municipal program exists on or before July 1, 2026.

534

1. The preapplication consultation services authorized in

535

this subsection are limited to those applications for permits as

536

defined in s. 163.3169.

537

2. The municipality may use a qualified contractor or a

538

qualified contractor firm as defined in s. 163.3169 to fulfill

539

the preapplication consultation services required in this

540

subsection.

541

(b) A development preapplication consultation services

542

program must, at minimum, provide all of the following:

543

1. The minimum information that must be submitted in an

544

application for a permit as defined in s. 163.3169.

545

2. The review and precertification of completeness of the

546

application and all related documents, including site

547

engineering plans or site plans or their functional equivalent,

548

or plats, and their compliance with all relevant existing land

549

development regulations.

550

(c) If an applicant chooses to use the development

551

preapplication consultation services program, the municipality,

552

upon receipt of the proposed development application, shall

553

confirm receipt, verify completeness, and issue a written

554

notification to the applicant indicating that all required

555

information has been submitted, or specify in writing with

556

particularity any deficiencies within 5 business days. If the

557

application is deficient, the applicant has 30 days to address

558

the deficiencies by submitting the required information. If the

559

municipality fails to issue the written notification within 5

560

business days, the application is deemed complete by operation

561

of law without conditions, and the municipality must process the

562

application as required in paragraph (d).

563

(d)1. Upon receipt of the applicant’s completed

564

application, the municipality must process the application for

565

final action and must approve, approve with conditions, or deny

566

the application within 45 days after submission of a complete

567

application, except the municipality may not review again those

568

plans specified in subparagraph (b)2.

569

2.

If the municipality fails to take final action to

570

approve, approve with conditions, or deny the application within

571

the 45 days, the applicant shall notify the municipality in

572

writing. If the municipality fails to respond within 10 days,

573

the application is deemed approved by operation of law without

574

conditions, and the applicant is entitled to proceed with the

575

proposed activity or development as though the municipality had

576

granted unconditional approval. Approval pursuant to this

577

subparagraph may not be construed to relieve the applicant of

578

the obligation to comply with all other applicable federal,

579

state, and local laws, regulations, and ordinances.

580

(2)

If an applicant for a development permit or development

581

order is not eligible

, does not request, or elects not to use

582

the municipality’s development preapplication consulting

583

services program pursuant to subsection (1), all of the

584

following requirements shall apply:

585

(a)

(1)

A municipality shall specify in writing the minimum

586 information that must be submitted for an application for a

587 zoning approval, rezoning approval, subdivision approval,

588 certification, special exception, or variance. A municipality

589 shall make the minimum information available for inspection and

590 copying at the location where the municipality receives

591 applications for development permits and orders, provide the

592 information to the applicant at a preapplication meeting, or

593 post the information on the municipality’s website.

594

(

b

)

1.

(2)

Within 5 business days after receiving an

595 application for approval of a development permit or development

596 order, a municipality shall confirm receipt of the application

597 using contact information provided by the applicant. Within 30

598 days after receiving an application for approval of a

599 development permit or development order, a municipality must

600 review the application for completeness and issue a written

601 notification to the applicant indicating that all required

602 information is submitted or specify in writing with

603 particularity any areas that are deficient. If the application

604 is deficient, the applicant has 30 days to address the

605 deficiencies by submitting the required additional information.

606

2.

For applications that do not require final action

607 through a quasi-judicial hearing or a public hearing, the

608 municipality must approve, approve with conditions, or deny the

609 application for a development permit or development order within

610 120 days after the municipality has deemed the application

611 complete.

612

3.

For applications that require final action through a

613 quasi-judicial hearing or a public hearing, the municipality

614 must approve, approve with conditions, or deny the application

615 for a development permit or development order within 180 days

616 after the municipality has deemed the application complete.

617

4.

Both parties may agree in writing or in a public meeting

618 or hearing to an extension of time, particularly in the event of

619 a force majeure or other extraordinary circumstance. An

620 approval, approval with conditions, or denial of the application

621 for a development permit or development order must include

622 written findings supporting the municipality’s decision.

623

624 The timeframes contained in this

paragraph

subsection

do not

625 apply in an area of critical state concern, as designated in s.

626 380.0552 or chapter 28-36, Florida Administrative Code. The

627 timeframes contained in this

paragraph

subsection

restart if an

628 applicant makes a substantive change to the application. As used

629 in this

paragraph

subsection

, the term “substantive change”

630 means an applicant-initiated change of 15 percent or more in the

631 proposed density, intensity, or square footage of a parcel.

632

(c)1.

(3)(a)

When reviewing an application for a development

633 permit or development order that is certified by a professional

634 listed in s. 403.0877, a municipality may not request additional

635 information from the applicant more than three times, unless the

636 applicant waives the limitation in writing.

637

2.

(b)

If a municipality makes a request for additional

638 information and the applicant submits the required additional

639 information within 30 days after receiving the request, the

640 municipality must review the application for completeness and

641 issue a letter indicating that all required information has been

642 submitted or specify with particularity any areas that are

643 deficient within 30 days after receiving the additional

644 information.

645

3.

(c)

If a municipality makes a second request for

646 additional information and the applicant submits the required

647 additional information within 30 days after receiving the

648 request, the municipality must review the application for

649 completeness and issue a letter indicating that all required

650 information has been submitted or specify with particularity any

651 areas that are deficient within 10 days after receiving the

652 additional information.

653

4.

(d)

Before a third request for additional information,

654 the applicant must be offered a meeting to attempt to resolve

655 outstanding issues. If a municipality makes a third request for

656 additional information and the applicant submits the required

657 additional information within 30 days after receiving the

658 request, the municipality must deem the application complete

659 within 10 days after receiving the additional information or

660 proceed to process the application for approval or denial unless

661 the applicant waived the municipality’s limitation in writing as

662 described in paragraph (a).

663

5.

(e)

Except as provided in

subsection (4)

subsection (7)

,

664 if the applicant believes the request for additional information

665 is not authorized by ordinance, rule, statute, or other legal

666 authority, the municipality, at the applicant’s request, shall

667 proceed to process the application for approval or denial.

668

(d)

(4)

A municipality must issue a refund to an applicant

669 equal to:

670

1.

(a)

Ten percent of the application fee if the

671 municipality fails to issue written notification of completeness

672 or written specification of areas of deficiency within 30 days

673 after receiving the application.

674

2.

(b)

Ten percent of the application fee if the

675 municipality fails to issue written notification of completeness

676 or written specification of areas of deficiency within 30 days

677 after receiving the additional information pursuant to

678

subparagraph (c)2.

paragraph (3)(b)

.

679

3.

(c)

Twenty percent of the application fee if the

680 municipality fails to issue written notification of completeness

681 or written specification of areas of deficiency within 10 days

682 after receiving the additional information pursuant to

268683

subparagraph (c)3.

paragraph (3)(c)

.

684

4.

(d)

Fifty percent of the application fee if the

685 municipality fails to approve, approves with conditions, or

686 denies the application within 30 days after conclusion of the

687 120-day

timeframe specified in subparagraph

(b)2.

or

the

180-day

688 timeframe specified in

subparagraph (b)3

.

subsection (2)

.

689

5.

(e)

One hundred percent of the application fee if the

690 municipality fails to approve, approves with conditions, or

691 denies an application 31 days or more after conclusion of the

692 120-day

timeframe specified in subparagraph

(b)2.

or

the

180-day

693 timeframe specified in

subparagraph (b)3

.

subsection (2

).

694

695 A municipality is not required to issue a refund if the

696 applicant and the municipality agree to an extension of time,

697 the delay is caused by the applicant, or the delay is

698 attributable to a force majeure or other extraordinary

699 circumstance.

700

(e)

(5)

When a municipality denies an application for a

701 development permit or development order, the municipality shall

702 give written notice to the applicant. The notice must include a

703 citation to the applicable portions of an ordinance, rule,

704 statute, or other legal authority for the denial of the permit

705 or order.

706

(3)

REQUIREMENTS.—

269

(a6)

By January 1, 2027, the governing body of a local

As used in this section, the terms “development

707 permit” and “development order” have the same meaning as in s.

708 163.3164, but do not include building permits.

270709

(4)

(7)

For any development permit application filed with

710 the municipality after July 1, 2012, a municipality may not

government711 require shall createas a programcondition byof whichprocessing or issuing a development

712 permit or development order that an applicant obtain a permit or

713 approval from any state or federal agency unless the agency has

714 issued a final agency action that denies the federal or state

715 permit before the municipal action on the local development

716 permit.

271717

services office

shall

authorize an applicant to use a qualified

272

contractor to conduct a preapplication review of any permits

273

submitted in an application. The governing body

shall

establish

274

the processes by which an applicant may submit an application to

275

the local government, following a preapplication review

276

conducted by a qualified contractor. The program must specify

,

277

at

a minimum,

all of the following:

278

1.

The manner in which the development services office

279

enters into a contract with a qualified contractor.

280

2.

Minimum requirements for selection as a qualified

281

contractor for the program, including verification of current

282

licensure or certification status and review of any adverse

283

actions, discipline, or restrictions imposed by the applicable

284

professional licensing board. A local government may consider or

285

require as criteria for selection or qualification a minimum of

286

(5)

years of experience for qualified contractors, but may not

287

consider or require for selection or qualification geographic

288

location or any prior or existing work for or with the local

289

government.

290

3.

The minimum and maximum hourly rates that a qualified

291

contractor may charge an applicant, comparable to market

292

averages, as part of the application fee.

293

4.

Other necessary and indispensable procedural

294

requirements to implement this section, such as requirements

295

relating to intake, payment, recordkeeping, and notice

296

processes.

297

(b8)

Additional requirements may not conflict with or impair

298

the intent of this section; may not add to, modify, limit, or

299

condition the rights, duties, standards, scope, qualifications,

300

or effects established by this section; and may not impose any

301

substantive review criteria, terms, or conditions on applicants

302

or qualified contractors.

303

(c)

The program must require a local government to deem an

304

application that meets the requirements of this section

305

administratively complete for purposes of acceptance and

306

processing.

307

Issuance of a development permit or development

718 order by a municipality does not create any right on the part of

719 an applicant to obtain a permit from a state or federal agency

720 and does not create any liability on the part of the

721 municipality for issuance of the permit if the applicant fails

722 to obtain requisite approvals or fulfill the obligations imposed

723 by a state or federal agency or undertakes actions that result

724 in a violation of state or federal law. A municipality shall

725 attach such a disclaimer to the issuance of development permits

726 and shall include a permit condition that all other applicable

727 state or federal permits be obtained before commencement of the

728 development.

729

(6)

(9)

This section does not prohibit a municipality from

730 providing information to an applicant regarding what other state

731 or federal permits may apply.

732 Section 4. Paragraphs (c) and (d) are added to subsection

733 (1) of section 177.071, Florida Statutes, to read:

734 177.071 Administrative approval of plats or replats by

735 designated county or municipal official.—

736 (1)

737

(c) A governing body and its designated administrative

738

authority shall use, upon the written request of the applicant,

739

the registry established in s. 163.3169 to supplement local

740

government staff resources in ways determined by the governing

741

body for processing and expediting the requirements of this

742

section.

743

(

d

)

The program may not impose additional terms,

308

conditions, or duplicative review processes with respect to the

309

preapplication review for an application that meets the

310

requirements of this section. However, the program may allow for

311

the review of ownership authorizations for the development of

312

the property.

313

(

e

)

T

his section

may not

be construed to waive, limit, or

314

otherwise affect any requirement of the Consultants’ Competitive

315

Negotiation Act pursuant to s. 287.055 or a local government’s

316

duly adopted procurement process.

317

(4)

REGISTRY.—

318

(a)

The development services office of a local government

319

shall establish a registry of at least six qualified

320

contractors. If the minimum requirements for the qualified

321

contractor specified in subparagraph (3)(a)2. are met, the

322

development services office

may

add a qualified contractor to

323

the registry upon such entity’s request to be added to the

324

registry.

325

(b)

If, after making reasonable efforts, less than six

326

qualified contractors are available

to be added to the registry

,

327

or if less than three qualified contractors are available for

328

local governments serving populations of less than 10,000, the

329

development services office

A local government may not create, establish, or apply

744

any additional local procedure or condition for the

745

administrative approval of a plat or replat under this section

746

which

is inconsistent with this section or s. 177.091. If

747

infrastructure financial assurances are required as a condition

748

of plat or replat approval, the administrative authority

749

designated in paragraph (a)

must

register any willing

and

330

available qualified contractor

receive and act upon the

750

proposed assurance. The local government shall accept commonly

751

used forms of financial assurance, including performance bonds,

752

letters of credit, and escrow agreements, provided

that

meet

s

the requirements of

331

subparagraph (3)(a)2.

332

(c)

The local government may enter into an agreement with

333

another local government for the purpose of using public

334

employees who meet the requirements for a qualified contractor

335

the

753

assurance is in a form reasonably acceptable to the local

754

government and issued by a financially responsible issuer

755

tomeeting completeobjective, theuniformly preapplicationapplied reviewstandards. A localLocal government may

336

not add its own employees to its own registry.

337

(d)

756

review of such financial assurance shall be limited to verifying

757

that the amount, form, and issuer satisfy the requirements of s.

758

177.091

(8) and (9)

Aand the local governmentgovernment’s shalluniformly adopt and use standardapplied

338

contract terms and conditions for agreements with qualified

339

contractors which are substantially similar in form and

340

759

standards, and may not be used to unreasonably delay approval.

760

substanceIf tothe assurance is deficient, the local government’s standard professionalgovernment

341

services agreements used for materially similar engagements with

342

private sector providers. A local government may not draft or

343

apply contractual terms that impose obligation

s

on qualified

344

contractors which frustrate, impair, or defeat the legislative

345

intent of this section.

346

(5)

SELECTION OF A QUALIFIED CONTRACTOR OF APPLICANT’S

347

CHOICE.—

348

(a)

If any of the following conditions exist

s

, an applicant

349

who elects to participate in the program must have the

350

unconditional right to use a qualified contractor of his or her

351

choice, as long as the qualified contractor satisfies the

352

minimum requirements in subparagraph (3)(a)2., for

353

preapplication review:

354

1.

The governing body of a local government fails to create

355

the program pursuant to subsection (3) before January 1, 2027.

356

2.

The development services office of the local government

357

fails to create the registry as required pursuant to subsection

358

(4).

359

3.

The registry created pursuant to subsection (4) does not

360

consist of the requisite number of qualified contractors and the

361

local government has not complied with the requirements of

362

paragraph (4)(b).

363

(b)

The local government may not condition, deny, delay, or

364

otherwise contest the applicant’s selection or use of the

365

qualified contractor, except upon a written determination

366

supported on specific, articulable facts stating that the

367

qualified contractor does not meet the requirements of this

368

section, or that the qualified contractor has a conflict of

369

interest with the applicant, as defined in s. 112.312, or under

370

any stricter conflict of interest standards applicable to the

371

qualified contractor’s professional license or certification.

372

(6)

PAYMENT, FEES, AND PREAPPLICATION REVIEW.—

373

(a) The applicant shall have sole discretion to choose a

374

qualified contractor from the established registry under

375

subsection (4) to conduct a preapplication review

of a permit

.

376

The applicant may not pay the qualified contractor directly.

377

Such payment must be made to the local government with the

378

initial submission of the application. The local government

must

379

ensure the qualified contractor is paid in compliance with the

380

Local Government Prompt Payment Act under part VII of chapter

381

218.

382

(b) If an applicant uses a qualified contractor for the

383

purposes of conducting a preapplication review, the local

384

government must reduce any application fee by the amount of cost

385

savings realized by the development services office for not

386

having to perform such services. Such reduction may be

387

calculated on a flat fee or percentage basis, or any other

388

reasonable means by which a development services office assesses

389

the cost for its application review. The reduction in the

390

application fee does not relieve the applicant of responsibility

391

for payment of the qualified contractor’s fees as required in

392

paragraph (a). Any application or administrative fee imposed

393

under this section must be reasonably related to the actual cost

394

incurred by the local government in administering the

395

application and processing.

396

(c) If an applicant uses a qualified contractor to conduct

397

a preapplication review, the development services office must

398

provide the qualified contractor with access to the public

399

records and information reasonably necessary to perform the

400

preapplication review.

T

his paragraph

does not authorize

the

401

disclosure of records that are confidential or exempt from

402

public inspection or copying under chapter 119 or any other

403

applicable law, and access to such records

is

provided only toprovide

404

the extent permitted by law.

T

his paragraph

may not

761

written notice of deficiencies within 10 business days.

762 Section 5. Paragraph (a) of subsection (1), paragraphs (a)

763 and (b) of subsection (2), paragraph (a) of subsection (3),

764 subsection (4), paragraphs (b) and (c) of subsection (6), and

765 subsection (8) of section 177.073, Florida Statutes, are

766 amended, and paragraph (d) is added to subsection (2) of that

be767 section, construedto read:

405

to

require a local government to violate the licensing terms of

406

proprietary software or relate

d

vendor agreements.

407

(d)

1.

If an applicant does not use a qualified contractor

408

768 177.073 Expedited approval of residential building permits

769 before a final plat is recorded.—

770 (1) As used in this section, the term:

771 (a) “Applicant” means a homebuilder or developer who files

772 an application with the local governing body to identify the

773 percentage of planned homes, or the number of building permits,

pursuant to this section,774 that the local governmentgoverning body must conductissue anyfor a residential

409

requested preapplication review within the applicable timeframes

410

under ss. 125.022 and 166.033, to the extent those

sections

411

apply to the type of preapplication review requested. If the

412

local government fails to process the application within the

413

required timeframes, the applicant may use a qualified

414

contractor from the registry at the sole expense of the local

415

government

if all of the following conditions are met:

416

a.

T

he local government fail

s

to establish such registry

417

pursuant to subsection (4); and

418

b.

T

he qualified contractor does not have a conflict of

419

interest

in

review

ing

the permits, plans, or plats, including

420

final and preliminary, subject to the preapplication review and

421

otherwise meets the requirements of this section.

422

2.

If the applicant uses a qualified contractor for

423

preapplication review pursuant to this paragraph, such

424

application must be accepted automatically when the local

425

government receives an affidavit from the qualified contractor,

426

and subsection (10) does not apply.

427

(7) RESTRICTIONS ON PREAPPLICATION REVIEW.—A qualified

428

contractor

may

conduct preapplication review only for

429

applications relating to the disciplines covered by such

430

qualified contractor’s licensure or certification granted

431

pursuant to chapter 471, chapter 472, or chapter 481, or as

432

certified by the American Institute of Certified Planners,

433

including single-trade review. A qualified contractor may not

434

conduct a preapplication review pursuant to this section if the

435

qualified contractor is used by the applicant for the same

436

project that is the subject of the application, or has a

437

conflict of interest pursuant to s. 112.312.

438

(8)

AFFIDAVIT REQUIREMENTS.—

439

(a) A qualified contractor performing a preapplication

440

review must determine whether the application is in compliance

441

with all applicable land development regulations, comprehensive

442

plan regulations, ordinances, and codes of the governing

443

jurisdiction. The qualified contractor shall work directly with

444

the applicant to resolve any deficiencies. Upon making the

445

determination that the application complies with all relevant

446

land development regulations, comprehensive plan regulations,

447

ordinances, and codes, the qualified contractor shall prepare an

448

affidavit certifying that the following information is true and

449

correct to the best of the qualified contractor’s knowledge and

450

belief:

451

1. The preapplication review was conducted by the affiant,

452

who is duly authorized to perform a preapplication review

453

pursuant to this section and holds the appropriate license or

454

certificate.

455

2. The permits, plans, or plats, including final and

456

preliminary, reviewed in the application comply with all

457

applicable land development regulations, comprehensive plan

458

regulations, ordinances, and codes.

459

(b)

Such affidavit must bear a written or electronic

460

signature and must be submitted electronically to the

461

development services office.

462

(9) AUTHORIZATION AND APPROVAL.—

463

(a)

Upon receipt of an application accompanied by an

464

affidavit of the qualified contractor pursuant to subsection

465

(8), the development services office must review and accept the

466

application

as

administratively complete or reject such

467

application as administratively incomplete.

468

(b)

Upon a finding that the application is administratively

469

complete, the development services office shall, by the

470

following business day, forward the application for final action

471

by the appropriate approving authority or, if approval is

472

delegated to an employee within the development services office,

473

proceed with final action in accordance with this section and

474

ss. 125.022 and 166.033

.

475

(c)

If the development services office determines that an

775 subdivision

or one or more phases in a multiphased planned

476776

application submitted pursuant to this subsection is

477

administratively incomplete, the office must provide written

478

notice to the applicant specifically identifying any aspects of

479

the application which do not comply with this section;

480

applicable land development regulations;

or

comprehensive plan

481

regulations, ordinances, or codes

, and

the reasons the

482

application was denied with reference to code chapters and

483

sections

,

within 10 business days after receipt of the

484

application and affidavit. If the development services office

485

does not provide written notice to the permit applicant within

486

10 business days, the application shall be deemed

487

administratively complete as a matter of law solely for purposes

488

of acceptance, routing, and processing, and the development

489

services office must, by the following business day, forward the

490

application for final action to the appropriate approving

491

authority or, if the development services office is the

492

approving authority, proceed to final action in accordance with

493

this section and ss. 125.022 and 166.033. An application

494

determined to be administratively complete under this paragraph

495

does not constitute substantive approval of the permit submitted

496

and may not be construed to limit the authority to grant or deny

497

the application consistent with this section; however, the

498

development services office may not conduct any duplicative

499

review of the permit subject to preapplication review except as

500

expressly authorized by this section.

501

(d)

The development services office’s review under this

502

subsection is ministerial and limited to confirming

503

administrative completeness and proper form. The development

504

services office may not re-review the technical sufficiency or

505

substantive compliance of materials subject to preapplication

506

review by a qualified contractor, except as expressly authorized

507

by this section or by law.

508

(10)

CONSTRUCTION.—Any local provision or action

509

inconsistent with this section is preempted, void, and

510

unenforceable to the extent of the inconsistency, and this

511

section shall control and be given full force and effect over

512

any conflicting or more stringent provision of law, whether

513

general, special, or local, including any charter or home rule

514

provision, without regard to the order or time of enactment.

515

(11) DISCIPLINARY GUIDANCE.—When performing a

516

preapplication review, a qualified contractor is subject to the

517

disciplinary guidelines of the applicable professional board

518

with jurisdiction over his or her license or certification under

519

chapter 471, chapter 472, or chapter 481. Notwithstanding the

520

audit procedures in subsection (1

2

), any complaint investigation

521

or discipline that may arise out of a qualified contractor’s

522

preapplication review shall be conducted by the applicable

523

professional board. Complaints regarding conflicts of interest

524

or other ethical violations shall be reviewed as provided in

525

chapter 112.

526

(12) AUDIT PROCEDURES.—A local government may audit the

527

work of a qualified contractor performing preapplication review

528

under this section pursuant to procedures established by the

529

local government. Such procedures must be reasonable, applied in

530

a nondiscriminatory manner, and made publicly available. A

531

qualified contractor must be provided written notice of any

532

audit findings and a reasonable opportunity to respond. Nothing

533

in this subsection limits a local government’s authority to

534

enforce contract terms, address conflicts of interest, remove a

535

qualified contractor from participation in the program, or take

536

action necessary to protect the public health, safety, or

537

welfare

. An audit under this section may not replicate, redo, or

538

substitute for the preapplication review performed by the

539

qualified contractor and may not go beyond the scope of

540

verifying performance, customary practice, and evidentiary

541

support, unless expressly authorized by this section.

542

(13) PREAPPLICATION REVIEW FOR SPECIFIED ENTITIES.

543

Notwithstanding any other law, a county, a municipality, a

544

school district, or an independent special district may use a

545

qualified contractor to provide preapplication review for a

546

public works project by the county, municipality, school

547

district, or independent special district.

548

(14)

CIVIL ACTIONS AUTHORIZED.—

549

(a)

An applicant may bring a civil action for declaratory

550

or injunctive relief against a county or municipality for a

551

violation of this section. In any such action, the court shall

552

award the prevailing party reasonable attorney fees and costs.

553

For purposes of this paragraph, the term “prevailing party”

554

means the party that obtains an enforceable judgment, order, or

555

comparable court-sanctioned relief on the merits which

556

materially alter the legal relationship of the parties in that

557

party’s favor, including the granting of declaratory or

558

injunctive relief or the dismissal with prejudice of the

559

opposing party’s claims. The term does not include a party whose

560

objectives are achieved solely by the voluntary cessation of

561

challenged conduct absent a judicial determination or other

562

relief bearing the court’s imprimatur. If neither party prevails

563

on the significant issues, or if both parties prevail in part,

564

the court may determine that no party is the prevailing party

565

and may equitably apportion fees and costs.

566

(b)

Attorney fees, costs, and damages may not be awarded

567

pursuant to this subsection if:

568

1.

The applicant provides the local government written

569

notice that it is in violation of this section; and

570

2.

The local government complies with this section within

571

14 days or completes a preapplication review for the applicant

572

that has submitted written notice of a violation of this section

573

within 14 days.

574 Section 2. Paragraph (c) is added to subsection (1) of

575 section 177.071, Florida Statutes, to read:

576 177.071 Administrative approval of plats or replats by

577 designated county or municipal official.—

578 (1)

579

(c)

A local government may not create, establish, or apply

580

any additional local procedure or condition for the

581

administrative approval of a plat or replat under this section

582

that is inconsistent with this section or s. 177.091. If

583

infrastructure financial assurances are required as a condition

584

of plat or replat approval, the administrative authority

585

designated in paragraph (a) shall receive and act upon the

586

proposed assurance. The local government shall accept commonly

587

used forms of financial assurance, including performance bonds,

588

letters of credit, and escrow agreements, provided the assurance

589

is in a form reasonably acceptable to the local government and

590

issued by a financially responsible issuer meeting objective,

591

uniformly applied standards. Local government review of such

592

financial assurance shall be limited to verifying that the

593

amount, form, and issuer satisfy the requirements of s. 177.091

594

and the local government’s uniformly applied standards, and may

595

not be used to unreasonably delay approval. If the assurance is

596

deficient, the local government shall provide written notice of

597

deficiencies within 10 business days.

598 Section 3. Paragraph (a) of subsection (1), paragraphs (a)

599 and (b) of subsection (2), paragraph (a) of subsection (3),

600 subsection (4), paragraphs (b) and (c) of subsection (6), and

601 subsection (8) of section 177.073, Florida Statutes, are

602 amended, and paragraph (d) is added to subsection (2) of that

603 section, to read:

604 177.073 Expedited approval of residential building permits

605 before a final plat is recorded.—

606 (1) As used in this section, the term:

607 (a) “Applicant” means a homebuilder or developer who files

608 an application with the local governing body to identify the

609 percentage of planned homes, or the number of building permits,

610 that the local governing body must issue for a residential

611 subdivision

, or one or more phases in a multiphased planned

612

community, subdivision,

or planned community.

613777 (2)(a) By October 1, 2024, the governing body of a county

614778 that has 75,000 residents or more and any governing body of a

615779 municipality that has 10,000 residents or more and 25 acres or

616780 more of contiguous land that the local government has designated

617781 in the local government’s comprehensive plan and future land use

618782 map as land that is agricultural or to be developed for

619783 residential purposes shall create a program to expedite the

620784 process for issuing building permits for residential

621785 subdivisions

or

, one or more phases of a community or subdivision,

in a multiphased planned

786

community

,

subdivision,

622 or planned communities in accordance with the Florida Building

623787 with the Florida Building Code and this section before a final plat is recorded with the

624788 plat is recorded with the clerk of the circuit court. The expedited process must include

625789 expedited process must include an application for an applicant to identify the percentage of

790 to identify the percentage of planned homes, not to exceed 50

626791 planned homes, not to exceed 50 percent of the residential subdivision or

627 subdivision or

a

planned community,

792 or the number of building permits that the governing body must

793 issue for the residential subdivision or planned community. The

794 application or the local government’s final approval may not

795 alter or restrict the applicant from receiving the number of

796 building permits requested, so long as the request does not

797 exceed 50 percent of the planned homes of the residential

798 subdivision or planned community, or the number of building

799 permits. This paragraph does not:

628 permits that800 1. Restrict the governing body mustfrom issueissuing formore thethan residential50

801 percent of the building permits for the residential subdivision

629802 subdivision or planned community. The application or the local

630 government’s final approval may not alter or restrict the

631 applicant from receiving the number of building permits

632 requested, so long as the request does not exceed 50 percent of

633 the planned homes of the residential subdivision or planned

634 community or the number of building permits. This paragraph does

635 not:

636 1. Restrict the governing body from issuing more than 50

637 percent of the building permits for the residential subdivision

638 or planned community.

639803 2. Apply to a county subject to s. 380.0552.

640804 (b)

Subject to the requirements under subsection (6)(b),

paragraph

(6)(b),

a

641805 governing body that had a program in place before July 1, 2023,

642806 to expedite the building permit process, need only update

its

643

807

their

program to approve an applicant’s written application to

644808 issue up to 50 percent of the building permits for the

809 residential subdivision or planned community in order to comply

810 with this section. This paragraph does not restrict a governing

811 body from issuing more than 50 percent of the building permits

645812 for the residential subdivision or planned community.

,

or planned community in order to comply

646 with this section. This paragraph does not restrict a governing

647 body from issuing more than 50 percent of the building permits

648 for the residential subdivision or planned community.

649

813

(d)

1.

If a governing body fails to adopt a program under

650

814

paragraph (a) or

paragraph

(c), or fails to update or modify an

651

815

existing program as required under paragraph (b) by the

652

,

by the

816

applicable statutory deadline, the following will apply without

653

817

further action or approval by the governing body and

654

818

notwithstanding any conflicting local requirement:

655

819

a

.

The applicant

has

The applicant shall have an unconditional, selfself-executing right

656

820

executing right to use a qualified contractor of the applicant’s choosing,

657

821

choosing, within the scope of the contractor’s professional licensure and

658

822

licensure and as authorized under s. 177.073, to perform

659

this section

, to perform technical review

823

technical review and certification necessary to support the issuance of up to 75

660

824

issuance of up to 75 percent of the building permits for the residential subdivision

661

825

residential subdivision or planned community, including one or more phases thereof,

662

826

more phases thereof, before the final plat is recorded, provided the qualified

663

827

the qualified contractor does not have a conflict of interest. For the

664

828

For the purpose

s

of this paragraph,

the term

“conflict of interest” has

665

829

interest” has the same meaning as in s. 112.312.

666

830

b

.

The governing body, local building official, and any

667

831

local government staff may not condition, delay, limit,

668

832

restrict, obstruct, or deny the applicant’s use of a qualified

669

833

contractor under this paragraph. Nothing in this paragraph

670

This paragraph does not

834

prohibitsprohibit a local government from applying neutral, generally

671

835

applicable requirements relating to procurement, contracting,

672

836

insurance, indemnification, conflict-of-interest review,

673

837

credential verification, recordkeeping, or public safety,

674

838

provided such requirements do not materially impair or frustrate

675

839

the applicant’s ability to use a qualified contractor as

676

840

authorized by this paragraph. Any local requirement that

677

841

directly conflicts with this paragraph is preempted to the

678

842

extent of the conflict.

679

843

c

.

The qualified contractor may perform all technical

680

844

review services within the scope of his or her licensure and

681

845

qualifications which are necessary to obtain such building

682

846

permits as specifically authorized under this section, including

683

847

preparing, reviewing, and submitting permit applications and

684848

supporting plans, specifications, and documents, and providing

685

849

signed and sealed documents when required by law. The local

686

850

building official

must

building official shall accept such submissions when prepared and

687

851

and sealed by the qualified contractor as meeting any local

688

852

requirement that the submission be prepared or reviewed by local

689

853

government staff, and

must

government staff, and shall review and issue the permits in

690

854

accordance with the Florida Building Code and applicable state

691

855

law.

This paragraph does not limit

law. Nothing in this paragraph limits the authority of the local

692

856

building official to review such submission by a qualified

693

857

contractor for compliance with the Florida Building Code and

694

858

applicable state law, to identify deficiencies, or to approve or

695

859

deny the permit in accordance with the law.

696

860

d

.

The governing body and the local building official may

697

861

not unreasonably require the applicant or the qualified

698

862

contractor to use a local government registry, rotation,

or

699

863

shortlist, or any other selection or vetting process,

which

has

700

864

the effect of denying or materially delaying the applicant’s use

701

865

of a qualified contractor under this section..

702

866

e

.

The unconditional right provided by this paragraph

703

867

becomes effective immediately upon the governing body’s failure

704

868

to meet the applicable deadlines in paragraph (a) or

paragraph

705

869

(c), continues in effect unless and until the governing body has

706870

adopted or updated a program fully compliant with this section,

707

871

and may not be limited, impaired, or applied retroactively to

708

872

reduce the number or percentage of building permits the

709

873

applicant may obtain or is eligible to obtain under this

710

874

paragraph.

711

875

2

3 unchanged paragraphs

.

This paragraph

may not be construed to

limit or impair

712

876

the authority of the local building official to enforce the

713

877

Florida Building Code, the Florida Fire Prevention Code, or

714

878

other applicable state laws and local laws of general

715

879

application in reviewing and issuing building permits; however,

716

880

the governing body and the local building official may not

717

881

impose any additional local procedures, prerequisites, or

718

882

substantive standards on the applicant or the qualified

719

883

contractor which have the effect of conditioning, delaying,

720

884

restricting, or denying the use of a qualified contractor as

721

885

authorized by this paragraph.

722886 (3) A governing body shall create:

723887 (a) A two-step application process for the adoption of a

724888 preliminary plat,

and for stabilized access roads that can

725

889

support emergency vehicles,

inclusive of any plans, in order to

726890 expedite the issuance of building permits under this section.

727891 The application must allow an applicant to identify the

728892 percentage of planned homes or the number of building permits

729893 that the governing body must issue for the residential

730894 subdivision

,

3 unchanged paragraphs

or

planned community

,

or one or more phases of a

731

895

multiphased planned community or subdivision

.

732896 (4)(a) An applicant may use a private provider

or qualified

733

897

contractor in the same manner as provided in

pursuant to

s.

734898 553.791 to expedite the application process for building permits

any plans

735

necessary to support the approval of a site plan, preliminary or

736

final plat, or

building permits 899 after a preliminary plat is approved under this section.

737 approved under this section.

738900 (b) A governing body shall establish a registry of at least

739

six

, upon the written request of the

901

applicant

, use the qualified contractor registry established in

902

s. 163.3169

establish a registry of at least

three

qualified

903

qualified contractors whom the governing body may use

to supplement staff

740904 to supplement staff resources in ways determined by the governing body for

741905 governing body for processing and expediting the review of an application for a

742906 application for a preliminary plat or any plans related to such application.

A

907

743 application. A qualified contractor on the registry who is hired pursuant to

908

744 pursuant to this section to review an application, or any part thereof, for

909

745 thereof, for a preliminary plat, or any part thereof, may not have a conflict

910

746 have a conflict of interest with the applicant. For purposes of this paragraph,

911

747 this paragraph, the term “conflict of interest” has the same meaning as in s.

748 meaning as in s. 112.312.

749

(c)

912

112.312.

If a913 (6) The governing body failsmust toissue establishthe number or maintain thepercentage

750

registry914 of requiredbuilding underpermits paragraphrequested (b),by an applicant may,in ataccordance itswith

751

sole discretion, retain a private provider or qualified

752

contractor of the applicant’s choosing to process, review, and

753

expedite any application for a preliminary plat, or supporting

754

915 the Florida Building Code and this section, provided the

916 residential buildings or structures are unoccupied and all of

917 the following conditions are met:

918 (b) The applicant provides proof to the governing body that

documents,919 the applicant has provided thata copy of the selectedapproved private provider orpreliminary

755

qualified contractor does not have a conflict of interest. For

756

purposes of this paragraph, the term “conflict of interest” has

757

the same meaning as in s. 112.312. If a conflict of interest is

758

identified after selection, the applicant must promptly replace

759

the private provider or qualified contractor with one

that does

760

not have a

conflict of interest, and the governing body must

761

continue processing without delay or prejudice.

762

(d)

The governing body may not condition, delay, or deny

763

the applicant’s use of such private provider or qualified

764

contractor, and shall accept, process, and act upon reviews,

765

approvals, recommendations, or certifications submitted by the

766

private provider or qualified contractor in the same manner and

767

within the same timeframes as if performed by the governing

768

body’s own staff, or by a qualified contractor on the registry.

769

The governing body may verify credentials, require standard

770

submittal formats, and conduct ministerial compliance checks,

771

but may not impose additional requirements that have the effect

772

of frustrating, negating, or impeding the applicant’s right to

773

use a private provider or qualified contractor under this

774

subsection

. The applicant shall be responsible for all fees and

775

costs associated with the private provider or qualified

776

contractor. Any ordinance, resolution, policy, practice,

777

contract, or requirement to the contrary is preempted and void

778

to the extent of conflict with this paragraph.

779 (6) The governing body must issue the number or percentage

780 of building permits requested by an applicant in accordance with

781 the Florida Building Code and this section, provided the

782 residential buildings or structures are unoccupied and all of

783 the following conditions are met:

784 (b) The applicant provides proof to the governing body that

785 the applicant has provided a copy of the approved preliminary

786920 plat, along with the approved plans, to the relevant electric,

787921 gas, water, and wastewater utilities.

For purposes of this

788

922

paragraph,

the term

“approved plans” means plans approved for

789

923

design and permit review and does not include, and may not be

790

924

construed to require or imply, any certification, attestation,

791

925

or confirmation of the completion of construction of any

792926

subdivision or planned community infrastructure, or improvements

793

927

depicted in, referenced by, or required under such plans, except

794

928

for the construction of the minimum access and roadway

795

929

improvements required by the Florida Fire Prevention Code for

796

930

fire department access and operations, such as a stabilized

797

931

roadway for emergency access. No other subdivision or planned

798

932

community infrastructure or improvements may be required to be

799

933

constructed as a condition of permit issuance or approval.

800

building

permit issuance or

934

approval

authorized under this section

.

935

1.

A local government may not condition, delay, withhold,

801

936

or deny the issuance of any building permit authorized under

802

937

this section on:

803

938

a.

The actual completion, substantial completion, or

804

939

physical installation of any subdivision or planned community

805

940

infrastructure, or improvements identified in the approved

806

941

preliminary plat or approved plans;

807

942

b.

The submission, acceptance, or approval of any

808

943

certification of completion or similar documentation, including,

809

944

but not limited to, certificates of completion, substantial

810

or

substantial

945

completion, engineer’s or architect’s certifications of

811

946

completion, as-built or record drawings, pressure or compaction

812

947

test results, utility acceptance letters, service availability

813

948

letters, or similar confirmations of finished construction or

814

949

readiness for service

; or

815

950

c.

Compliance with an environmental condition that is not

816

which

is not

951

required by its land development regulations or by state law or

817

federal law to obtain a building permit.

818

, a local government

952

comprehensive plan, a regulatory covenant or similar recorded

953

instrument, a decision or order by a local zoning board or other

954

quasi-judicial board, or by state law or federal law to obtain a

955

building permit.

956

2.

This prohibition applies notwithstanding any ordinance,

819

957

resolution, policy, practice, developmentpermit ordercondition, permitconcurrency or

820

958

condition, concurrency or proportionate-share requirement, interlocal agreement, utility

821

development agreement, interlocal agreement, utility policy or

822

959

policy or standard, or other local requirement to the contrary.

823

960

3.

This paragraph

may not be construed to

prohibit a local

824

961

government from requiring documentation strictly necessary to

825

962

demonstrate compliance with the Florida Fire Prevention Code as

826

963

a condition of issuing building permits; however, such

827

964

documentation may not require the physical completion of the

828

965

subdivision or planned community infrastructure, or improvements

829

966

beyond what is expressly required to satisfy the Florida Fire

830

967

Prevention Code.

831 (c) The applicant holds a valid performance bond for up to

832 130 percent of the necessary improvements, as defined in s.

833 177.031(9), that have not been completed upon submission of the

834 application under this section. For purposes of a master planned

835 community as defined in s. 163.3202(5)(b), a valid performance

836 bond is required on a phase-by-phase basis.

968

969

This paragraph may not be construed to

relieve an applicant from

970

completing or installing any infrastructure or improvements as a

971

condition of issuance of a certificate of occupancy.

972 (c) The applicant holds a valid performance bond for up to

973 130 percent of the necessary improvements, as defined in s.

974 177.031(9), that have not been completed upon submission of the

975 application under this section. For purposes of a master planned

976 community as defined in s. 163.3202(5)(b), a valid performance

977 bond is required on a phase-by-phase basis.

For purposes of this

837

978

section, a local government may waive the bondingbond requirement in

838

979

this paragraph through its program or on a case-by-case basis

839

980

upon request of the applicant.

840981 (8) For purposes of this section, an applicant has a vested

841982 right in a preliminary plat that has been approved by a

842983 governing body

for the earlier of at least 5 years or

if all of

843984 the following conditions are met:

844985 (a) The applicant relies in good faith on the approved

845986 preliminary plat or any amendments thereto.

846987 (b) The applicant incurs obligations and expenses,

847988 commences construction of the residential subdivision or planned

848989 community, and is continuing in good faith with the development

849990 of the property.

850991 Section 46. This act shall take effect July 1, 2026.