Ratifi Español Sign in
Ratifi

Federal bills from Congress.gov. State bills from Open States.

SB 7002Session 2025

Water Management Districts

S 7002 e1

Underlined text would be added to current law. Struck-through text would be removed.

CS for SB 7002 First Engrossed 20257002e1 1 A bill to be entitled 2 An act relating to water management districts; 3 amending s. 112.3261, F.S.; defining the term 4 “expenditure”; requiring the Commission on Ethics to 5 investigate a lobbyist or principal who has made a 6 prohibited expenditure and to provide the Governor 7 with a report of its findings and recommendations 8 regarding such investigation; prohibiting certain 9 persons from making or accepting expenditures; 10 reenacting and amending s. 373.026, F.S.; conforming a 11 cross-reference; amending s. 373.0693, F.S.; deleting 12 a provision requiring legislative approval before the 13 establishment of a subdistrict or basin takes effect; 14 amending s. 373.079, F.S.; requiring a quorum for the 15 conduct of official business by the governing board of 16 a water management district; providing requirements 17 for a quorum; requiring an affirmative vote of a 18 majority of the members of the governing board before 19 any action may be taken by the board; amending s. 20 373.1501, F.S.; providing a legislative declaration; 21 authorizing the governing board of the South Florida 22 Water Management District to acquire land to implement 23 a reservoir project in a certain area; providing 24 construction; providing that land necessary for 25 implementing such project be acquired in a specified 26 manner; prohibiting the district or the state from 27 requesting that the United States Army Corps of 28 Engineers acquire lands for such reservoir project by 29 certain methods; prohibiting the inclusion of a 30 provision for such request in a certain agreement; 31 making technical changes; conforming provisions to 32 changes made by the act; amending s. 373.470, F.S.; 33 requiring the South Florida Water Management District, 34 in cooperation with the Department of Environmental 35 Protection, to provide a detailed report that includes 36 the total estimated remaining cost of implementation 37 of the Everglades restoration comprehensive plan and 38 the status of all performance indicators; requiring 39 that project components be subdivided into specified 40 categories based on the project’s status; providing 41 requirements for performance indicators for certain 42 projects or project components; providing legislative 43 recognition of the value of the integrated delivery 44 schedule; requiring the South Florida Ecosystem Task 45 Force to identify certain sources of funding when 46 making recommendations for updates to the integrated 47 delivery schedule; amending s. 373.501, F.S.; 48 prohibiting a water management district from using 49 state funds for a specified purpose; amending s. 50 373.503, F.S.; authorizing the districts to levy 51 certain ad valorem taxes on specified property for 52 certain purposes; requiring a governing board levying 53 ad valorem taxes for certain projects to adopt a 54 resolution approved by a majority vote of the voting 55 electors in the district or basin; providing 56 requirements for such resolution; providing 57 specifications for millage levied; requiring that the 58 referendum question on the ballot specify the purpose 59 of the levy and the maximum length of time the millage 60 may be imposed; defining the term “capital improvement 61 projects”; revising requirements for the maximum total 62 millage rate; reenacting and amending s. 373.535, 63 F.S.; requiring that the preliminary budget for each 64 water management district include a section that 65 contains the district’s capital improvement plan for 66 the current fiscal year and the next fiscal year; 67 requiring that such section contain specified 68 information; requiring the South Florida Water 69 Management District to include a section in its 70 preliminary budget for all projects within the 71 Comprehensive Everglades Restoration Plan; requiring 72 that the section contain specified information; 73 requiring the South Florida Water Management District 74 to indicate the fiscal year from which certain 75 appropriations are expended; requiring the district to 76 incorporate state revenues only in a certain manner 77 when estimating expenditures for the next fiscal year; 78 providing an exception; providing construction; 79 amending s. 373.536, F.S.; authorizing the Legislative 80 Budget Commission to reject certain district budget 81 proposals; providing an exception; providing 82 construction; requiring the South Florida Water 83 Management District to include in its budget document 84 certain sections that incorporate the actual amount of 85 state revenues appropriated for the fiscal year; 86 requiring a water management district’s tentative 87 budget for its proposed operations and funding 88 requirements to include the district’s capital 89 improvement plan for the current year and the next 90 fiscal year; amending s. 373.6075, F.S.; requiring a 91 water management district to give preference to 92 certain bids, proposals, or replies for the design, 93 engineering, or construction of capital improvement 94 projects in excess of a specified amount; requiring a 95 water management district to consider certain factors 96 for the purpose of the competitive bid selection 97 process; amending s. 380.093, F.S.; requiring that 98 certain projects submitted by water management 99 districts to the department for the Statewide Flooding 100 and Sea Level Rise Resilience Plan be ranked on a 101 separate list; revising the information that must be 102 submitted by the department for each project; 103 requiring that each project included in such plan have 104 a certain percentage cost share unless the project was 105 submitted by specified water management districts; 106 specifying the composition of the total amount of 107 funding for such plan; restricting funding available 108 to water management districts; providing exceptions; 109 authorizing the department to issue certain loans by 110 specified means to finance projects submitted by 111 specified water management districts; authorizing the 112 district to borrow certain funds and to repay such 113 funds; providing requirements for the repayment of 114 such loan; providing a penalty; prohibiting additional 115 state loans or grants from being issued to a water 116 management district that defaults under the terms of 117 its loan until the default is remedied; requiring the 118 department to adopt rules necessary to administer the 119 loan program; amending s. 380.0935, F.S.; making a 120 technical change; requiring the department to create 121 and maintain a separate account in the Resilient 122 Florida Trust Fund for certain funds received to 123 administer the revolving loan program for certain 124 projects submitted by water management districts 125 within the Statewide Flooding and Sea Level Rise 126 Resilience Plan; requiring that all repayments be 127 returned to the revolving loan program and made 128 available for the eligible projects in the plan; 129 providing that funds appropriated for the loan program 130 are not subject to reversion; amending s. 380.095, 131 F.S.; requiring that a specified amount of funds 132 deposited into the Indian Gaming Revenue Clearing 133 Trust Fund be distributed to the Resilient Florida 134 Trust Fund for the revolving loan program for 135 specified uses; authorizing the department to submit 136 budget amendments for a certain purpose, subject to 137 the approval of the Legislative Budget Commission; 138 reenacting s. 373.0697, F.S., relating to basin taxes, 139 to incorporate the amendment made to s. 373.503, F.S., 140 in a reference thereto; providing an effective date. 141 142 Be It Enacted by the Legislature of the State of Florida: 143 144 Section 1. Present paragraphs (b), (c), and (d) of 145 subsection (1) of section 112.3261, Florida Statutes, are 146 redesignated as paragraphs (c), (d), and (e), respectively, a 147 new paragraph (b) is added to that subsection, subsection (9) is 148 added to that section, and subsection (7) of that section is 149 amended, to read: 150 112.3261 Lobbying before water management districts; 151 registration and reporting.— 152 (1) As used in this section, the term: 153 (b) “Expenditure” has the same meaning as in s. 112.3215. 154 (7) Upon receipt of a sworn complaint alleging that a 155 lobbyist or principal has failed to register with a district, 156 has made a prohibited expenditure, or has knowingly submitted 157 false information in a report or registration required under 158 this section, the commission shall investigate a lobbyist or 159 principal pursuant to the procedures established under s. 160 112.324. The commission shall provide the Governor with a report 161 of its findings and recommendations in any investigation 162 conducted pursuant to this subsection. The Governor is 163 authorized to enforce the commission’s findings and 164 recommendations. 165 (9) Notwithstanding s. 112.3148, s. 112.3149, or any other 166 law, a lobbyist or principal may not make, directly or 167 indirectly, and a district governing board member, executive 168 director, or any district employee that qualifies as a local 169 officer as defined in s. 112.3145(1) may not knowingly accept, 170 directly or indirectly, any expenditure. 171 Section 2. Paragraph (b) of subsection (8) of section 172 373.026, Florida Statutes, is amended, and paragraph (d) of that 173 subsection is reenacted, to read: 174 373.026 General powers and duties of the department.—The 175 department, or its successor agency, shall be responsible for 176 the administration of this chapter at the state level. However, 177 it is the policy of the state that, to the greatest extent 178 possible, the department may enter into interagency or 179 interlocal agreements with any other state agency, any water 180 management district, or any local government conducting programs 181 related to or materially affecting the water resources of the 182 state. All such agreements shall be subject to the provisions of 183 s. 373.046. In addition to its other powers and duties, the 184 department shall, to the greatest extent possible: 185 (8) 186 (b) To ensure to the greatest extent possible that project 187 components will go forward as planned, the department shall 188 collaborate with the South Florida Water Management District in 189 implementing the comprehensive plan as defined in s. 190 373.470(2)(b), the Lake Okeechobee Watershed Protection Plan as 191 defined in s. 373.4595(2), and the River Watershed Protection 192 Plans as defined in s. 373.4595(2). Before any project component 193 is submitted to Congress for authorization or receives an 194 appropriation of state funds, the department must approve, or 195 approve with amendments, each project component within 60 days 196 following formal submittal of the project component to the 197 department. Prior to the release of state funds for the 198 implementation of the comprehensive plan, department approval 199 shall be based upon a determination of the South Florida Water 200 Management District’s compliance with s. 373.1501(6) s. 201 373.1501(5). Once a project component is approved, the South 202 Florida Water Management District shall provide to the President 203 of the Senate and the Speaker of the House of Representatives a 204 schedule for implementing the project component, the estimated 205 total cost of the project component, any existing federal or 206 nonfederal credits, the estimated remaining federal and 207 nonfederal share of costs, and an estimate of the amount of 208 state funds that will be needed to implement the project 209 component. All requests for an appropriation of state funds 210 needed to implement the project component shall be submitted to 211 the department, and such requests shall be included in the 212 department’s annual request to the Governor. Prior to the 213 release of state funds for the implementation of the Lake 214 Okeechobee Watershed Protection Plan or the River Watershed 215 Protection Plans, on an annual basis, the South Florida Water 216 Management District shall prepare an annual work plan as part of 217 the consolidated annual report required in s. 373.036(7). Upon a 218 determination by the secretary of the annual work plan’s 219 consistency with the goals and objectives of s. 373.4595, the 220 secretary may approve the release of state funds. Any 221 modifications to the annual work plan shall be submitted to the 222 secretary for review and approval. 223 (d) The Executive Office of the Governor, pursuant to its 224 duties under s. 373.536(5) to approve or disapprove, in whole or 225 in part, the budget of each water management district, shall 226 review all proposed expenditures for project components in the 227 district’s budget. 228 Section 3. Subsection (1) of section 373.0693, Florida 229 Statutes, is amended to read: 230 373.0693 Basins; basin boards.— 231 (1)(a) Any areas within a district may be designated by the 232 district governing board as subdistricts or basins. The 233 designations of such basins shall be made by the district 234 governing board by resolutions thereof. The governing board of 235 the district may change the boundaries of such basins, or create 236 new basins, by resolution. 237 (b) No subdistrict or basin in the St. Johns River Water 238 Management District other than established by this act shall 239 become effective until approved by the Legislature. 240 Section 4. Subsection (7) of section 373.079, Florida 241 Statutes, is amended to read: 242 373.079 Members of governing board; oath of office; staff.— 243 (7) The governing board shall meet at least once a month 244 and upon call of the chair. A quorum is necessary for the board 245 to conduct official business. A majority of the members of the 246 governing board, which includes both appointed members and 247 vacancies, constitutes a quorum. A board member’s appearance at 248 a board meeting, whether such appearance is in person or through 249 the use of communications media technology, must be counted for 250 the determination of a quorum. Except where otherwise provided 251 by law, action may be taken by the governing board only upon an 252 affirmative vote of a majority of the members of the governing 253 board. The governing board, a basin board, a committee, or an 254 advisory board may conduct meetings by means of communications 255 media technology in accordance with rules adopted pursuant to s. 256 120.54(5)(b) s. 120.54. 257 Section 5. Present subsections (4) through (10) of section 258 373.1501, Florida Statutes, are redesignated as subsections (5) 259 through (11), respectively, a new subsection (4) is added to 260 that section, and present subsection (9) of that section is 261 amended, to read: 262 373.1501 South Florida Water Management District as local 263 sponsor.— 264 (4) The Legislature declares that acquiring land for water 265 storage north of Lake Okeechobee is in the public interest, for 266 a public purpose, and necessary for the public health and 267 welfare. The governing board of the district is authorized to 268 acquire land, if necessary, to implement a reservoir project 269 north of Lake Okeechobee with the goal of providing at least 270 200,000 acre-feet of water storage. Any acquisition of real 271 property for the purpose of a reservoir project constitutes a 272 public purpose for which it is in the public interest to expend 273 public funds. Any land necessary for implementing the projects 274 in this subsection may only be acquired in accordance with s. 275 373.139(2), and chapters 73 and 74. The district and the state 276 are not authorized to request the United States Army Corps of 277 Engineers to acquire the lands for such reservoir project, and 278 may not include any provision for such request in the project 279 partnership agreement for such reservoir project. 280 (10)(9) Final agency action with regard to any project 281 component subject to s. 373.026(8)(b) must shall be taken by the 282 department. Actions taken by the district pursuant to subsection 283 (6) are (5) shall not be considered final agency action. Any 284 petition for formal proceedings filed pursuant to ss. 120.569 285 and 120.57 requires shall require a hearing under the summary 286 hearing provisions of s. 120.574, which is shall be mandatory. 287 The final hearing under this section must shall be held within 288 30 days after receipt of the petition by the Division of 289 Administrative Hearings. 290 Section 6. Paragraph (c) of subsection (7) of section 291 373.470, Florida Statutes, is amended, paragraph (d) is added to 292 that subsection, and subsection (8) is added to that section, to 293 read: 294 373.470 Everglades restoration.— 295 (7) ANNUAL REPORT.—To provide enhanced oversight of and 296 accountability for the financial commitments established under 297 this section and the progress made in the implementation of the 298 comprehensive plan, the following information must be prepared 299 annually as part of the consolidated annual report required by 300 s. 373.036(7): 301 (c) The district, in cooperation with the department, shall 302 provide a detailed report on progress made in the implementation 303 of the comprehensive plan, including the total estimated 304 remaining cost of implementation of the comprehensive plan. The 305 report must also include the status of and applicable 306 performance indicators for all project components. The project 307 components must be subdivided into the following categories 308 based on the project’s status: 309 1. Planning and design phase. 310 2. Construction phase, for which the performance indicators 311 must include, but are not limited to: 312 a. If the project is on time and on budget based on a 313 schedule performance index; and 314 b. If the project had any claims, change orders, or credits 315 upon closeout, including the description, date, and cost of the 316 change, compensatory amounts, and the remedy or resolution 317 exercised as it pertains to the schedule or budget of the 318 project. 319 3. Operational phase, for which the performance indicators 320 must include, but are not limited to, whether the operation of 321 the project is achieving the goals and objectives identified in 322 the final project implementation report. 323 4. Pending projects phase, which includes project 324 components that have not yet entered the planning or design 325 phase. 326 5. The estimated expenditures for the project in the prior 327 fiscal year compared to the actual expenditures, with an 328 explanation for significant variances initiated after the 329 effective date of this act or the date of the last report 330 prepared under this subsection, whichever is later. 331 (d) For a project or project component developed pursuant 332 to s. 255.065, the performance indicators in the report must be 333 consistent with national industry standards for the delivery 334 method. 335 336 The information required in paragraphs (a), (b), and (c), and 337 (d) shall be provided as part of the consolidated annual report 338 required by s. 373.036(7). Each annual report is due by March 1. 339 (8) INTEGRATED DELIVERY SCHEDULE.—The Legislature 340 recognizes the value of the integrated delivery schedule as a 341 forward-looking snapshot of upcoming planning, design, and 342 construction schedules for the comprehensive plan and as a tool 343 that provides information to decision-makers and facilitates 344 achievement of the goals and purposes of the comprehensive plan 345 at the earliest possible time to the extent practical given 346 funding, engineering, and other contractual constraints. The 347 Legislature further recognizes that the schedule acts as a 348 planning document and does not represent a budget or financial 349 commitment on behalf of any of the participants of the South 350 Florida Ecosystem Restoration Task Force. Therefore, when making 351 recommendations for any update to the schedule, state and local 352 members of the task force must identify project funding sources 353 to reflect whether funding will use recurring state funds 354 provided pursuant to s. 375.041(3)(b)1., 4., and 5., or whether 355 the project may be funded with nonrecurring state funds. 356 Section 7. Subsection (3) is added to section 373.501, 357 Florida Statutes, to read: 358 373.501 Appropriation of funds to water management 359 districts.— 360 (3) A water management district may not use state funds as 361 a local match for any state grant program unless such funds have 362 been specifically appropriated to the district for such purpose. 363 Section 8. Subsection (3) of section 373.503, Florida 364 Statutes, is amended to read: 365 373.503 Manner of taxation.— 366 (3)(a)1. The districts may, by resolution adopted by a 367 majority vote of the governing board, levy ad valorem taxes on 368 property within the district solely for the purposes of this 369 chapter and of chapter 25270, 1949, Laws of Florida, as amended, 370 and chapter 61-691, Laws of Florida, as amended. If appropriate, 371 taxes levied by each governing board may be separated by the 372 governing board into a millage necessary for the purposes of the 373 district and a millage necessary for financing basin functions 374 specified in s. 373.0695. 375 2.a. The districts may levy separate ad valorem taxes on 376 property within the district or basin for the purposes of the 377 construction of capital improvement projects. Such levy must be 378 by resolution adopted by a majority vote of the governing board 379 and conditioned to take effect only upon approval by a majority 380 vote of the electors in the district or basin, as applicable, 381 voting in a referendum held at a general election as defined in 382 s. 97.021. The resolution must be conditioned to take effect on 383 the January 1 immediately following voter approval of the 384 referendum. The resolution must include the millage to be 385 levied, a detailed description of the capital improvement 386 projects to be funded by the millage, such projects’ expected 387 dates of completion, and the maximum duration for the levy of 388 the millage, which may not extend beyond the date that the 389 projects are expected to be completed. The millage levied under 390 this subparagraph may be up to an amount that, when combined 391 with millage levied under subparagraph 1., does not exceed the 392 maximum total millage rate authorized under paragraph (b). The 393 referendum question on the ballot must specify a brief and 394 general description of the purpose of the levy and the maximum 395 length of time the millage may be imposed. 396 b. For purposes of this subparagraph, the term “capital 397 improvement projects” means projects related to water supply, 398 including alternative water supply and water resource 399 development projects identified in the district’s regional water 400 supply plans, water quality, flood protection and floodplain 401 management, and natural systems. 402 (b)(a) Notwithstanding any other general or special law, 403 and subject to subsection (4), the maximum total millage rate 404 for all district and basin purposes authorized under this 405 section shall be: 406 1. Northwest Florida Water Management District: 0.05 mill. 407 2. Suwannee River Water Management District: 0.75 mill. 408 3. St. Johns River Water Management District: 0.6 mill. 409 4. Southwest Florida Water Management District: 1.0 mill. 410 5. South Florida Water Management District: 0.80 mill. 411 (c)(b) The apportionment of millages levied pursuant to 412 subparagraph (a)1. in the South Florida Water Management 413 District shall be a maximum of 40 percent for district purposes 414 and a maximum of 60 percent for basin purposes, respectively. 415 (d)(c) Within the Southwest Florida Water Management 416 District, the maximum millage assessed for district purposes may 417 not exceed 50 percent of the total authorized millage if there 418 are one or more basins in the district, and the maximum millage 419 assessed for basin purposes may not exceed 50 percent of the 420 total authorized millage. 421 Section 9. Subsections (1) and (3) of section 373.535, 422 Florida Statutes, are amended, and subsection (2) of that 423 section is reenacted, to read: 424 373.535 Preliminary district budgets.— 425 (1) BUDGET DEVELOPMENT.— 426 (a) By January 15 of each year, each water management 427 district shall submit a preliminary budget for the next fiscal 428 year for legislative review to the President of the Senate, the 429 Speaker of the House of Representatives, and the chairs of each 430 legislative committee and subcommittee having substantive or 431 fiscal jurisdiction over water management districts, as 432 determined by the President of the Senate or the Speaker of the 433 House of Representatives, as applicable, in the form and manner 434 prescribed in s. 373.536(5)(e). 435 (b) Each preliminary budget must also include: 436 1. A section that clearly identifies and provides 437 justification for each proposed expenditure listed in s. 438 373.536(5)(e)4.e. and f. and identifies the source of funds for 439 each proposed expenditure. 440 2. A section identifying the justification for proposed 441 expenditures by core mission area of responsibility and the 442 source of funds needed for activities related to water supply, 443 including alternative water supply and water resource 444 development projects identified in the district’s regional water 445 supply plans, water quality, flood protection and floodplain 446 management, and natural systems. 447 3. A section that includes the district’s capital 448 improvement plan for the current fiscal year and the next fiscal 449 year, which will be incorporated as part of the district’s 5 450 year capital improvement plan. The following information must be 451 included for each project contained in the capital improvement 452 plan: 453 a. Estimated beginning and ending date. 454 b. Current status, such as planning, construction, or 455 operations. 456 c. Funding source, grouped by federal, state, and local 457 pursuant to s. 373.503(3)(a)1., local pursuant to s. 458 373.503(3)(a)2., or other. 459 d. Total cost of the project. 460 e. Whether the project is funded from reserves. 461 f. Total expenditures made to date, by fiscal year. 462 g. Current year estimated expenditures. 463 h. Annual budget, including future budget requests, until 464 project completion, by funding source. 465 i. Project description. 466 j. State program code, such as operations and maintenance 467 or ecosystems restoration. 468 4.3. A section reviewing the adopted and proposed budget 469 allocations by program area and the performance metrics for the 470 prior year. 471 5.4. An analysis of each preliminary budget to determine 472 the adequacy of fiscal resources available to the district and 473 the adequacy of proposed district expenditures related to the 474 core mission areas of responsibility for water supply, including 475 alternative water supply and water resource development projects 476 identified in the district’s regional water supply plans, water 477 quality, flood protection and floodplain management, and natural 478 systems. The analysis must be based on the particular needs 479 within each district for core mission areas of responsibility. 480 The water supply analysis must specifically include a 481 determination of the adequacy of each district’s fiscal 482 resources provided in the district’s preliminary budget to 483 achieve appropriate progress toward meeting the districtwide 20 484 year projected water supply demands, including funding for 485 alternative water supply development and conservation projects. 486 (c)(b) If applicable, the preliminary budget for each 487 district must specify that the district’s first obligation for 488 payment is the debt service on bonds and certificates of 489 participation. 490 (d) In addition to the information that must be included 491 for projects carried out pursuant to the capital improvement 492 plan in subparagraph (b)3., the South Florida Water Management 493 District must include a separate section in its preliminary 494 budget for all projects within the Comprehensive Everglades 495 Restoration Plan. The information for the separate section must 496 be provided on a project-by-project basis and include the source 497 of funds. For each project, all of the following information 498 must be included: 499 1. The project title and a brief description. 500 2. The total estimated cost of the project, delineated by 501 federal and nonfederal sponsor obligations. The local sponsor 502 obligations must be further delineated by state and district 503 obligations. 504 3. The timeline for the project. 505 4. The total expenditures to date and estimated remaining 506 expenditures needed for project completion. 507 5. The estimate of expenditures for the current year. 508 6. The estimate of expenditures for the next fiscal year. 509 (e) For expenditures funded by state appropriations, the 510 South Florida Water Management District must indicate which 511 fiscal year the appropriation is from. In estimating 512 expenditures for the next fiscal year, the district may 513 incorporate state revenues only in an amount up to the amount of 514 funds specifically provided in s. 375.041(3)(b)1., 4., and 5., 515 unless the district commits district revenues on a dollar-for 516 dollar basis for any amount over such amount specifically 517 provided. 518 (2) LEGISLATIVE REVIEW.— 519 (a) The Legislature may annually review the preliminary 520 budget for each district, including, but not limited to, those 521 items listed in s. 373.536(5)(e)4.d.-f., specific to regulation, 522 outreach, management, and administration program areas. 523 (b) On or before March 1 of each year, the President of the 524 Senate and the Speaker of the House of Representatives may 525 submit comments regarding the preliminary budget to the 526 districts, and provide a copy of the comments to the Executive 527 Office of the Governor. Each district shall respond to the 528 comments in writing on or before March 15 of each year to the 529 President of the Senate, the Speaker of the House of 530 Representatives, and the Executive Office of the Governor. 531 (c) If, following such review, the Legislature does not 532 take any action pursuant to s. 373.503 on or before July 1 of 533 each year, a water management district may proceed with budget 534 development as provided in subsection (3) and s. 373.536. 535 (3) FUNDING AUTHORITY GRANTED.—Each district shall use the 536 preliminary budget as submitted pursuant to subsection (1), and 537 as may be amended by the district in response to review by the 538 Legislature pursuant to this section and s. 373.503, as the 539 basis for developing the tentative budget for the next fiscal 540 year as provided in s. 373.536(5). However, this subsection may 541 not be construed to impair any contractual obligations. 542 Section 10. Paragraphs (c) and (e) of subsection (5) of 543 section 373.536, Florida Statutes, are amended to read: 544 373.536 District budget and hearing thereon.— 545 (5) TENTATIVE BUDGET CONTENTS AND SUBMISSION; REVIEW AND 546 APPROVAL.— 547 (c) The Legislative Budget Commission may reject any of the 548 following district budget proposals unless specifically 549 appropriated by the Legislature: 550 1. A single purchase of land in excess of $10 million, 551 except for land exchanges. 552 2. Any cumulative purchase of land during a single fiscal 553 year in excess of $50 million. 554 3. Any issuance of debt on or after July 1, 2012. 555 4. Any program expenditure expenditures as described in 556 sub-subparagraphs (e)4.e. and f. in excess of 15 percent of a 557 district’s total annual budget. 558 5. Any individual variance variances in a district’s 559 tentative budget which is in excess of 25 percent from a 560 district’s preliminary budget. 561 6. Any individual portion of a district’s tentative budget 562 funded with state appropriations. 563 7. Any individual project in the district’s 5-year capital 564 improvement plan except for those projects fully funded with 565 revenues approved by voters pursuant to s. 373.503(3)(a)2.a. 566 567 Written disapproval of any provision in the tentative budget 568 must be received by the district at least 5 business days before 569 the final district budget adoption hearing conducted under s. 570 200.065(2)(d). If written disapproval is not received at least 5 571 business days before the final budget adoption hearing, the 572 governing board may proceed with final adoption. Any provision 573 rejected by the Executive Office of the Governor or the 574 Legislative Budget Commission may not be included in a 575 district’s final budget and may not be acted upon through any 576 other means without the prior approval of the entity rejecting 577 the provision. 578 (e) The tentative budget must be based on the preliminary 579 budget as submitted to the Legislature, and as may be amended by 580 the district in response to review by the Legislature pursuant 581 to ss. 373.503 and 373.535, as the basis for developing the 582 tentative budget for the next fiscal year as provided in this 583 subsection, however, this subsection may not be construed to 584 impair any contractual obligations. The tentative budget and 585 must set forth the proposed expenditures of the district, to 586 which may be added an amount to be held as reserve. The 587 tentative budget must include, but is not limited to, the 588 following information for the preceding fiscal year and the 589 current fiscal year, and the proposed amounts for the upcoming 590 fiscal year, in a standard format prescribed by the Executive 591 Office of the Governor, in consultation with the Legislature: 592 1. The estimated amount of funds remaining at the beginning 593 of the fiscal year which have been obligated for the payment of 594 outstanding commitments not yet completed. 595 2. The estimated amount of unobligated funds or net cash 596 balance on hand at the beginning of the fiscal year; an 597 accounting of the source, balance, and projected future use of 598 the unobligated funds; and the estimated amount of funds to be 599 raised by district taxes or received from other sources to meet 600 the requirements of the district. 601 3. The millage rates and the percentage increase above the 602 rolled-back rate, together with a summary of the reasons the 603 increase is required, and the percentage increase in taxable 604 value resulting from new construction within the district. 605 4. The salaries and benefits, expenses, operating capital 606 outlay, number of authorized positions, and other personal 607 services for the following program areas of the district: 608 a. Water resource planning and monitoring; 609 b. Land acquisition, restoration, and public works; 610 c. Operation and maintenance of works and lands; 611 d. Regulation; 612 e. Outreach for which the information provided must contain 613 a full description and accounting of expenditures for water 614 resources education; public information and public relations, 615 including public service announcements and advertising in any 616 media; and lobbying activities related to local, regional, state 617 and federal governmental affairs, whether incurred by district 618 staff or through contractual services; and 619 f. Management and administration. 620 621 In addition to the program areas reported by all water 622 management districts, the South Florida Water Management 623 District shall include in its budget document separate sections 624 on all costs associated with the Everglades Construction Project 625 and the Comprehensive Everglades Restoration Plan, incorporating 626 the amount of state revenues appropriated for the fiscal year. 627 5. The total estimated amount in the district budget for 628 each area of responsibility listed in subparagraph 4. and for 629 water resource, water supply, and alternative water supply 630 development projects identified in the district’s regional water 631 supply plans. 632 6. A description of each new, expanded, reduced, or 633 eliminated program. 634 7. The funding sources, including, but not limited to, ad 635 valorem taxes, Surface Water Improvement and Management Program 636 funds, other state funds, federal funds, and user fees and 637 permit fees for each program area. 638 8. The water management district’s capital improvement plan 639 for the current fiscal year and the next fiscal year, in the 640 same format as required in the preliminary budget. 641 Section 11. Section 373.6075, Florida Statutes, is amended 642 to read: 643 373.6075 Purchases from contracts of other entities.— 644 (1) A water management district may purchase commodities 645 and contractual services, excluding services subject to s. 646 287.055, from the purchasing contracts of special districts, 647 municipalities, counties, other political subdivisions, 648 educational institutions, other states, nonprofit entities, 649 purchasing cooperatives, or the Federal Government, which have 650 been procured pursuant to competitive bid, request for proposal, 651 request for qualification, competitive selection, or competitive 652 negotiation, and which are otherwise in compliance with general 653 law if the purchasing contract of the other entity is procured 654 by a process that meets the procurement requirements of the 655 water management district. 656 (2) For contractual services for the design, engineering, 657 or construction, or for any combination of the design, 658 engineering, or construction of capital improvement projects 659 with a total project cost estimated at $20 million or more, a 660 water management district shall give preference to the lowest 661 responsible and responsive bid, proposal, or reply that includes 662 proof of district-defined acceptable minimum work experience 663 within this state, project-specific payment and performance 664 bonds in amounts appropriate for the project contract amount, 665 and minimum warranty of 2 years beginning at substantial 666 completion, or that includes proof of a comparable financial 667 assurance mechanism, as defined by district rule. 668 (3) For the purpose of the competitive selection process in 669 s. 287.055(4) or procurement procedures in s. 255.065(3), a 670 water management district shall consider whether a bid, 671 proposal, or reply includes appropriate payment and performance 672 bonds, proof of a comparable financial assurance mechanism, as 673 defined by district rule, or documentation of all bond faults or 674 bond claims within the last 10 years, including all open and 675 closed claims and agreed-upon amounts with a description of the 676 claim and any resolution. 677 Section 12. Present paragraph (i) of subsection (5) of 678 section 380.093, Florida Statutes, is redesignated as paragraph 679 (j) and amended, a new paragraph (i) is added to that 680 subsection, and paragraphs (a), (c), (d), (e), and (h) of that 681 subsection are amended, to read: 682 380.093 Resilient Florida Grant Program; comprehensive 683 statewide flood vulnerability and sea level rise data set and 684 assessment; Statewide Flooding and Sea Level Rise Resilience 685 Plan; regional resilience entities.— 686 (5) STATEWIDE FLOODING AND SEA LEVEL RISE RESILIENCE PLAN.— 687 (a) By December 1 of each year, the department shall 688 develop a Statewide Flooding and Sea Level Rise Resilience Plan 689 on a 3-year planning horizon and submit it to the Governor, the 690 President of the Senate, and the Speaker of the House of 691 Representatives. The plan must consist of ranked projects that 692 address risks of flooding and sea level rise to coastal and 693 inland communities in the state. All eligible projects submitted 694 to the department pursuant to this section must be ranked and 695 included in the plan. All eligible projects submitted by a water 696 management district must be ranked on a separate list. Each plan 697 must include a detailed narrative overview describing how the 698 plan was developed, including a description of the methodology 699 used by the department to determine project eligibility, a 700 description of the methodology used to rank projects, the 701 specific scoring system used, the project proposal application 702 form, a copy of each submitted project proposal application form 703 separated by eligible projects and ineligible projects, the 704 total number of project proposals received and deemed eligible, 705 the total funding requested, and the total funding requested for 706 eligible projects. 707 (c) Each plan submitted by the department pursuant to this 708 subsection must include all of the following information for 709 each recommended project: 710 1. A description of the project. 711 2. The location of the project. 712 3. An estimate of how long the project will take to 713 complete. 714 4. An estimate of the cost of the project. 715 5. The cost-share percentage available for the project, if 716 applicable. 717 6. A summary of the priority score assigned to the project. 718 7. The project sponsor. 719 (d)1. By September 1 of each year, all of the following 720 entities may submit to the department a list of proposed 721 projects that address risks of flooding or sea level rise 722 identified in the comprehensive statewide flood vulnerability 723 and sea level rise assessment or vulnerability assessments that 724 meet the requirements of subsection (3): 725 a. Counties. 726 b. Municipalities. 727 c. Special districts as defined in s. 189.012 which are 728 responsible for the management and maintenance of inlets and 729 intracoastal waterways or for the operation and maintenance of a 730 potable water facility, a wastewater facility, an airport, or a 731 seaport facility. 732 d. Regional resilience entities acting on behalf of one or 733 more member counties or municipalities. 734 735 For the plans submitted by December 1, 2024, such entities may 736 submit projects identified in existing vulnerability assessments 737 that do not comply with subsection (3) only if the entity is 738 actively developing a vulnerability assessment that is either 739 under a signed grant agreement with the department pursuant to 740 subsection (3) or funded by another state or federal agency, or 741 is self-funded and intended to meet the requirements of 742 paragraph (3)(d) or if the existing vulnerability assessment was 743 completed using previously compliant statutory requirements. 744 Projects identified from this category of vulnerability 745 assessments will be eligible for submittal until the prior 746 vulnerability assessment has been updated to meet most recent 747 statutory requirements. 748 2. By September 1 of each year, all of the following 749 entities may submit to the department a list of any proposed 750 projects that address risks of flooding or sea level rise 751 identified in the comprehensive statewide flood vulnerability 752 and sea level rise assessment or vulnerability assessments that 753 meet the requirements of subsection (3), or that mitigate the 754 risks of flooding or sea level rise on water supplies or water 755 resources of the state and a corresponding evaluation of each 756 project: 757 a. Water management districts. 758 b. Drainage districts. 759 c. Erosion control districts. 760 d. Flood control districts. 761 e. Regional water supply authorities. 762 3. Each project submitted to the department pursuant to 763 this paragraph for consideration by the department for inclusion 764 in the plan must include all of the following information: 765 a. A description of the project. 766 b. The location of the project. 767 c. An estimate of how long the project will take to 768 complete. 769 d. An estimate of the cost of the project. 770 e. The cost-share percentage available for the project, if 771 applicable. 772 f. The project sponsor. 773 (e) Each project included in the plan must have a minimum 774 50 percent cost share unless the project was submitted by a 775 water management district, or assists or is within a community 776 eligible for a reduced cost share. For purposes of this section, 777 the term “community eligible for a reduced cost share” means: 778 1. A municipality that has a population of 10,000 or less 779 fewer, according to the most recent April 1 population estimates 780 posted on the Office of Economic and Demographic Research’s 781 website, and a per capita annual income that is less than the 782 state’s per capita annual income as shown in the most recent 783 release from the Bureau of the Census of the United States 784 Department of Commerce that includes both measurements; 785 2. A county that has a population of 50,000 or less fewer, 786 according to the most recent April 1 population estimates posted 787 on the Office of Economic and Demographic Research’s website, 788 and a per capita annual income that is less than the state’s per 789 capita annual income as shown in the most recent release from 790 the Bureau of the Census of the United States Department of 791 Commerce that includes both measurements; or 792 3. A municipality or county that has a per capita annual 793 income that is equal to or less than 75 percent of the state’s 794 per capita annual income as shown in the most recent release 795 from the Bureau of the Census of the United States Department of 796 Commerce. 797 (h) The total amount of funding proposed for each year of 798 the plan must may not be at least less than $100 million and, 799 for projects submitted by a water management district, may 800 include funds that have been repaid by a water management 801 district. Upon review and subject to appropriation, the 802 Legislature shall approve funding for the projects as specified 803 in the plan. The only funding available to water management 804 districts under this subsection is through the loan program 805 pursuant to paragraph (i), except for the Northwest Florida 806 Water Management District and the Suwanee River Water Management 807 District, which may receive grants. Multiyear projects that 808 receive funding for the first year of the project must be 809 included in subsequent plans and funded until the project is 810 complete, provided that the project sponsor has complied with 811 all contractual obligations and funds are available. 812 (i) To finance projects submitted by the St. Johns River 813 Water Management District, the Southwest Florida Water 814 Management District, or the South Florida Water Management 815 District, the department may issue 20-year, interest-free loans 816 through a promissory note or other form of written agreement 817 evidencing an obligation to repay the borrowed funds to the 818 department. The district may borrow funds made available 819 pursuant to this section. Any revenues or other adequate 820 security available to the district, other than state revenues, 821 may be used to repay any funds borrowed. The loans must be 822 repaid in equal installments over a period not to exceed 20 823 years, commencing within 12 months after the execution of the 824 loan agreement. 825 1. The department may impose a penalty for delinquent loan 826 payments in the amount of 6 percent of the amount due, in 827 addition to charging the cost to handle and process the debt. 828 Penalty interest accrues on any amount due and payable beginning 829 on the 30th day following the date that the payment was due. 830 2. If a water management district defaults under the terms 831 of its loan agreement, no additional state loans or grants may 832 be issued to that water management district until the default 833 has been remedied. 834 (j)(i) The department shall adopt rules to implement this 835 section, including, but not limited to, rules necessary to 836 administer the revolving loan program to finance projects 837 submitted by water management districts. 838 Section 13. Present subsection (3) of section 380.0935, 839 Florida Statutes, is redesignated as subsection (4), a new 840 subsection (3) is added to that section, and subsection (2) of 841 that section is amended, to read: 842 380.0935 Resilient Florida Trust Fund.— 843 (2) Moneys deposited in the fund are available as a funding 844 source for the department for the Resilient Florida Grant 845 Program and the Statewide Flooding and Sea Level Sea-Level Rise 846 Resilience Plan, including costs to operate the grant program, 847 to develop the plan, and to provide grants to regional 848 resilience coalitions pursuant to s. 380.093. The department may 849 also use moneys deposited in the fund for administrative and 850 operational costs of the Florida Flood Hub for Applied Research 851 and Innovation pursuant to s. 380.0933 and coastal resilience 852 initiatives. 853 (3) The department shall create and maintain a separate 854 account in the trust fund for funds received pursuant to s. 855 380.095 to administer a revolving loan program for eligible 856 projects submitted by water management districts within the 857 Statewide Flooding and Sea Level Rise Resilience Plan. All 858 repayments must be returned to the revolving loan program and 859 made available for the eligible projects submitted by water 860 management districts in the plan. Notwithstanding s. 216.301, 861 funds appropriated for the loan program are not subject to 862 reversion. 863 Section 14. Paragraph (c) of subsection (2) of section 864 380.095, Florida Statutes, is amended to read: 865 380.095 Dedicated funding for conservation lands, 866 resiliency, and clean water infrastructure.— 867 (2) DISTRIBUTION.—Notwithstanding s. 285.710, the 868 Department of Revenue shall, upon receipt, deposit 96 percent of 869 any revenue share payment received under the compact as defined 870 in s. 285.710 into the Indian Gaming Revenue Clearing Trust Fund 871 within the Department of Financial Services. The funds deposited 872 into the trust fund shall be distributed as follows: 873 (c) The lesser of 26.042 percent or $100 million each 874 fiscal year to the Resilient Florida Trust Fund within the 875 Department of Environmental Protection for the revolving loan 876 fund within the Statewide Flooding and Sea Level Rise Resilience 877 Plan to be used to fund eligible projects submitted by water 878 management districts in accordance with s. 380.093. 879 880 Allocations to trust funds shall be transferred monthly by 881 nonoperating authority to the named trust fund. 882 Section 15. The Department of Environmental Protection may 883 submit budget amendments to request the realignment of funds 884 appropriated for Everglades restoration in the 2025-2026 General 885 Appropriations Act pursuant to s. 216.292(4), Florida Statutes, 886 subject to the approval of the Legislative Budget Commission. 887 Section 16. For the purpose of incorporating the amendment 888 made by this act to section 373.503, Florida Statutes, in a 889 reference thereto, section 373.0697, Florida Statutes, is 890 reenacted to read: 891 373.0697 Basin taxes.—The respective basins may, pursuant 892 to s. 9(b), Art. VII of the State Constitution, by resolution 893 request the governing board of the district to levy ad valorem 894 taxes within such basin. Upon receipt of such request, a basin 895 tax levy shall be made by the governing board of the district to 896 finance basin functions enumerated in s. 373.0695, 897 notwithstanding the provisions of any other general or special 898 law to the contrary, and subject to the provisions of s. 899 373.503(3). 900 (1) The amount of money to be raised by said tax levy shall 901 be determined by the adoption of an annual budget by the 902 district board of governors, and the average millage for the 903 basin shall be that amount required to raise the amount called 904 for by the annual budget when applied to the total assessment of 905 the basin as determined for county taxing purposes. However, no 906 such tax shall be levied within the basin unless and until the 907 annual budget and required tax levy shall have been approved by 908 formal action of the basin board, and no county in the district 909 shall be taxed under this provision at a rate to exceed 1 mill. 910 (2) The taxes provided for in this section shall be 911 extended by the county property appraiser on the county tax roll 912 in each county within, or partly within, the basin and shall be 913 collected by the tax collector in the same manner and time as 914 county taxes, and the proceeds therefrom paid to the district 915 for basin purposes. Said taxes shall be a lien, until paid, on 916 the property against which assessed and enforceable in like 917 manner as county taxes. The property appraisers, tax collectors, 918 and clerks of the circuit court of the respective counties shall 919 be entitled to compensation for services performed in connection 920 with such taxes at the same rates as apply to county taxes. 921 (3) It is hereby determined that the taxes authorized by 922 this subsection are in proportion to the benefits to be derived 923 by the several parcels of real estate within the basin from the 924 works authorized herein. 925 Section 17. This act shall take effect July 1, 2025.

Official text from the Florida Legislature. Formatting has been adapted for reading on Ratifi.