1 A bill to be entitled

1

2 An act relating to mitigation banks; amending s.

533 unchanged paragraphs

3 373.4136, F.S.; beginning on a specified date,

4 revising the schedule for credit release upon issuance

5 of a mitigation bank credit permit; providing

6 specifications for such schedule; authorizing a

7 mitigation bank applicant to propose an alternative

8 credit release schedule; requiring the Department of

9 Environmental Protection or water management district

10 to modify an existing permitted credit release

11 schedule upon request under certain circumstances;

12 prohibiting mitigation credits from being released for

13 freshwater wetland creation until certain conditions

14 are met; authorizing one-time use of mitigation

15 credits outside the mitigation bank service area in

16 certain circumstances; requiring the department and

17 water management districts to apply proximity factor

18 multipliers in a specified manner; specifying that the

19 use of certain multipliers meets certain requirements;

20 requiring the department or water management district

21 to request an accounting of credit availability from

22 mitigation banks within a specified timeframe;

23 specifying the timeframe to reply to such request;

24 requiring the permit applicant to be notified of

25 credits available; providing a presumption if a

26 mitigation bank does not respond within a certain

27 timeframe; limiting the timeframe for the permit

28 applicant to rely on a credit availability

29 determination for specified purposes; requiring each

30 mitigation bank to submit an accounting of credits;

31 requiring the department or water management district

32 to compile such accountings for a specified purpose

33 and to submit a report including certain information

34 to the Legislature on a specified date and annually

35 thereafter; providing an effective date.

36

37 Be It Enacted by the Legislature of the State of Florida:

38

39 Section 1. Subsections (5) and (6) of section 373.4136,

40 Florida Statutes, are amended to read:

41 373.4136 Establishment and operation of mitigation banks.—

42 (5) SCHEDULE FOR CREDIT RELEASE.—After

July 1, 2025, when

43

issuing

awarding mitigation credits to

a mitigation bank

permit

,

44 the department or the water management district shall

adhere to

45

the credit release

schedule

set forth

in paragraph (a)

a

46

schedule

for the release of

those

credits

awarded by

in

the

47 mitigation bank permit. A mitigation credit that has been

48 released may be sold or used to offset adverse impacts from an

49 activity regulated under this part.

50 (a)

1. T

hirty percent of awarded credits shall be released

51

upon the recordation of the conservation easement and

52

establishment of financial assurances required by the mitigation

53

bank permit. If a preservation-only assessment area is used, 100

54

percent of awarded credits shall be released for the recordation

55

of the conservation easement and establishment of financial

56

assurances required by the mitigation bank permit.

57

2.

Thirty percent of awarded credits shall be released

58

following completion of initial construction activities as

59

established by the mitigation bank permit.

60

3. Twenty percent of awarded credits shall be released in

61

increments as monitoring indicates interim performance criteria

62

established by the mitigation bank permit are being met.

63

4. Twenty percent of awarded credits shall be released upon

64

meeting final success criteria established by the mitigation

65

bank permit.

66

(b)

The mitigation bank applicant may propose an

67

alternative credit release schedule and the department or water

68

management district shall consider the proposed alternative

69

credit release schedule.

70

(c)

Upon request by a mitigation bank permittee for

71

modification of the credit release schedule of a permitted

72

mitigation bank, the department or relevant water management

73

district shall modify the credit release schedule to conform it

74

to paragraph (a) if such permitted mitigation bank has not yet

75

had mitigation credits released for the completion of

76

construction activities. The department or water management

77

district may not alter, change, or modify any other provision of

78

the mitigation bank permit unrelated to the credit release

79

schedule

The department or the water management district shall

80

allow a portion of the mitigation credits awarded to a

81

mitigation bank to be released for sale or use prior to meeting

82

all of the performance criteria specified in the mitigation bank

83

permit. The department or the water management district shall

84

allow release of all of a mitigation bank’s awarded mitigation

85

credits only after the bank meets the mitigation success

86

criteria specified in the permit

.

87

(b

)

The number of credits and schedule for release shall be

88

determined by the department or water management district based

89

upon the performance criteria for the mitigation bank and the

90

success criteria for each mitigation activity. The release

91

schedule for a specific mitigation bank or phase thereof shall

92

be related to the actions required to implement the bank, such

93

as site protection, site preparation, earthwork, removal of

94

wastes, planting, removal or control of nuisance and exotic

95

species, installation of structures, and annual monitoring and

96

management requirements for success. In determining the specific

97

release schedule for a bank, the department or water management

98

district shall consider, at a minimum, the following factors:

99

1. Whether the mitigation consists solely of preservation

100

or includes other types of mitigation.

101

2. The length of time anticipated to be required before a

102

determination of success can be achieved.

103

3. The ecological value to be gained from each action

104

required to implement the bank.

105

4. The financial expenditure required for each action to

106

implement the bank

.

107

(d)

(c)

Notwithstanding

the provisions of

this subsection,

a

108

mitigation

no

credit

may not

shall

be released for freshwater

109 wetland creation until the success criteria

established

included

110 in the mitigation bank permit

for initial construction

111

activities

are met.

112

(e)

(d)

The withdrawal of mitigation credits from a

113 mitigation bank shall be accomplished as a minor modification of

114 the mitigation bank permit. A processing fee

is not

shall not be

115 required by the department or water management district for this

116 minor modification.

117 (6) MITIGATION SERVICE AREA.—The department or water

118 management district shall establish a mitigation service area

119 for each mitigation bank permit. The department or water

120 management district shall notify and consider comments received

121 on the proposed mitigation service area from each local

122 government within the proposed mitigation service area. Except

123 as provided

in this section

herein

, mitigation credits may be

124 withdrawn and used only to offset adverse impacts in the

125 mitigation service area. The boundaries of the mitigation

126 service area shall depend upon the geographic area where the

127 mitigation bank could reasonably be expected to offset adverse

128 impacts. Mitigation service areas may overlap, and mitigation

129 service areas for two or more mitigation banks may be approved

130 for a regional watershed.

131 (a) In determining the boundaries of the mitigation service

132 area, the department or the water management district shall

133 consider the characteristics, size, and location of the

134 mitigation bank and, at a minimum, the extent to which the

135 mitigation bank:

136 1. Contributes to a regional integrated ecological network;

137 2. Will significantly enhance the water quality or

138 restoration of an offsite receiving water body that is

139 designated as an Outstanding Florida Water, a Wild and Scenic

140 River, an aquatic preserve, a water body designated in a plan

141 approved pursuant to the Surface Water Improvement and

142 Management Act, or a nationally designated estuarine preserve;

143 3. Will provide for the long-term viability of endangered

144 or threatened species or species of special concern;

145 4. Is consistent with the objectives of a regional

146 management plan adopted or endorsed by the department or water

147 management districts; and

148 5. Can reasonably be expected to offset specific types of

149 wetland impacts within a specific geographic area. A mitigation

150 bank need not be able to offset all expected impacts within its

151 service area.

152 (b) The department and water management districts shall use

153 regional watersheds to guide the establishment of mitigation

154 service areas. Drainage basins established pursuant to s.

155 373.414(8) may be used as regional watersheds when they are

156 established based on the hydrological or ecological

157 characteristics of the basin. A mitigation service area may

158 extend beyond the regional watershed in which the bank is

159 located into all or part of other regional watersheds when the

160 mitigation bank has the ability to offset adverse impacts

161 outside that regional watershed. Similarly, a mitigation service

162 area may be smaller than the regional watershed in which the

163 mitigation bank is located when adverse impacts throughout the

164 regional watershed cannot reasonably be expected to be offset by

165 the mitigation bank because of local ecological or hydrological

166 conditions.

167 (c) Once a mitigation bank service area has been

168 established by the department or a water management district for

169 a mitigation bank,

such mitigation bank shall be deemed to

170

implement a plan that provides regional ecological value;

such

171 service area shall be accepted by all water management

172 districts, local governments, and the department

; and the use of

173

credits from such mitigation bank to offset impacts within that

174

bank’s service area shall be considered to have met the

175

cumulative impact requirements of s. 373.414(8)(a)

.

176 (d) If the

provisions of

requirements in

s. 373.414(1)(b)

177 and (8) are met

and an insufficient number or type of credits

178

from banks whose permitted service area overlays in whole or in

179

part the regional watershed in which the impacts occur, the

180

permit applicant is entitled to a one-time use of credits

181

released from a mitigation bank outside the mitigation bank

182

service area to offset impacts pursuant to s. 373.414(1)(b), as

183

established by the procedure in paragraph (f). The

department or

184

water management district must have determined that the

185

mitigation service area lacked the appropriate credit type.

186

Priority must be given to mitigation banks whose permitted

187

service area fully includes the impacted site. If the number of

188

released credits within a mitigation service area only partially

189

offsets the impacts associated with a proposed project in the

190

mitigation service area, the permit applicant may only use out

191

of-service-area credits to account for the difference between

192

the released credits available in the mitigation bank service

193

area and the credits required to offset the impacts associated

194

with the proposed project. In implementing this subsection, the

195

department and water management districts shall apply a

196

proximity factor to determine adequate compensatory mitigation

197

as follows:

198

1. A 1.0 multiplier shall be applied for use of in-kind

199

credits within the service area.

200

2. A 1.0 multiplier shall be applied for use of in-kind and

201

out-of-service-area credits when the service area overlays part

202

of the same regional watershed as the proposed impacts only

203

after credit-deficiency has been established by the procedure

204

set forth in paragraph (f).

205

3. A 1.2 multiplier shall be applied for use of in-kind and

206

out-of-service-area credits located within a regional watershed

207

immediately adjacent to the regional watershed overlain by a

208

bank service area in which proposed impacts are located

only

209

after credit-deficiency has been established by the procedure

210

set forth in paragraph (f).

211

4. When in-kind credits are not available to offset impacts

212

in the regional watershed immediately adjacent to the regional

213

watershed overlain by a mitigation bank service area in which

214

the proposed impacts are located, an additional 0.25 multiplier

215

shall be applied for each additional regional watershed boundary

216

crossed only after credit-deficiency has been established by the

217

procedure set forth in paragraph (f).

218

5. An additional 0.50 multiplier shall be applied after any

219

multipliers required in subparagraphs 1.-4., if the mitigation

220

used to offset impacts entails out-of-kind replacement.

221

(e)

Use of the multipliers in subparagraphs (d)2., 3., 4.,

222

and 5. meets the requirements of s. 373.414(8)(a) for addressing

223

cumulative impacts.

224

(f)

Once

the amount of mitigation required to offset

225

impacts has been determined, and the department or water

226

management district determines

that out

-of-service-area or out

227

of-kind mitigation is necessary, the department or water

228

management district shall contact all mitigation banks with a

229

mitigation service area encompassing the location of the

230

proposed impacts within 7 business days after receipt of the

231

request from the permit applicant and request an accounting of

232

available credits, including out-of-kind credits. The accounting

233

may not include credits reserved for other permit applicants.

234

The mitigation banks contacted by the department or water

235

management district shall be allowed 15 business days after

236

receipt of the request by the department or water management

237

district to reply to such request. If one or more mitigation

238

banks replying to the request notifies the department or the

239

water management district that out-of-kind credits are available

240

to offset the proposed impact and the department or a water

241

management district determines that such out-of-kind credits are

242

appropriate to offset all or part of the proposed impact, the

243

department or the water management district shall notify the

244

permit applicant that sufficient credits are available within

245

that bank’s service area to offset the proposed impacts and the

246

use of credits from another mitigation bank outside of that

247

other mitigation bank’s service area may not occur until use of

248

all of the out-of-kind credits occurs as allowed by the

249

department or water management district

. If

a

mitigation

bank

250

does not reply within the 15 business day timeframe, it is

251

presumed credits

from that bank

are not available. Upon receipt

252

of the accounting from the mitigation banks, the department or

253

water management district shall determine if sufficient credits

254

are available to offset impacts associated with the proposed

255

project and notify the permit applicant of such determination

256

within 15 business days. The permit applicant, and no other

257

entity, may rely on the determination from the department or

258

water management district for a period of

6 months

beginning on

259

the date the department or water management district notifies

260

the permit applicant of such determination, but only for

261

purposes relating to the pending application producing such

262

determination and not any extensions, nor renewals, nor

263

modifications of any permit issued pursuant to that pending

264

application, nor for any other permit application.

265

(g) Beginning July 1, 2026, and each July 1 thereafter,

266

each mitigation bank in this state shall submit to the

267

department or water management district an accounting of the

268

number and type of credits the mitigation bank has available for

269

sale. The accounting may not include names of parties for which

270

credits have been reserved or the contract price paid for the

271

credits. The department or water management district shall

272

compile the information to provide an assessment of this state’s

273

mitigation banking system and submit a report to the President

274

of the Senate and the Speaker of the House of Representatives on

275

October 1, 2026, and each October 1 thereafter

,

the following

276

projects or activities regulated under this part shall be

277

eligible to use

a mitigation bank, regardless of whether they

278

are located within the mitigation service area

:

279

1. Projects with adverse impacts partially located within

280

the mitigation service area.

281

2. Linear projects, such as roadways, transmission lines,

282

distribution lines, pipelines, railways, or seaports listed in

283

s. 311.09(1).

284

3. Projects with total adverse impacts of less than 1 acre

285

in size

.

286 Section 2. This act shall take effect July 1, 2025.