SB 1080Session 2025

Local Government Land Regulation

S 1080 er

Underlined text would be added to current law. Struck-through text would be removed.

ENROLLED 2025 Legislature CS for SB 1080, 2nd Engrossed 20251080er 1 2 An act relating to local government land regulation; 3 amending s. 125.022, F.S.; requiring counties to 4 specify minimum information necessary for certain 5 applications; revising timeframes for processing 6 applications for approval of development permits or 7 development orders; defining the term “substantive 8 change”; providing refund parameters in situations 9 where the county fails to meet certain timeframes; 10 providing exceptions; amending s. 163.3180, F.S.; 11 prohibiting a school district from collecting, 12 charging, or imposing certain fees unless they meet 13 certain requirements; providing a standard of review 14 for actions challenging such fees; amending s. 553.80, 15 F.S.; specifying certain purposes for which local 16 governments may use certain fees to carry out 17 activities relating to obtaining or finalizing a 18 building permit; amending s. 163.31801, F.S.; revising 19 the voting threshold required for approval of certain 20 impact fee increase ordinances by local governments, 21 school districts, and special districts; requiring 22 that certain impact fee increases be implemented in 23 specified increments; prohibiting a local government 24 from increasing an impact fee rate beyond certain 25 phase-in limitations under certain circumstances; 26 deleting retroactive applicability; amending s. 27 163.3184, F.S.; providing that if comprehensive plan 28 amendments are not adopted at a specified hearing, 29 such amendments must be formally adopted within a 30 certain time period or they are deemed withdrawn; 31 increasing the time period within which comprehensive 32 plan amendments must be transmitted; amending s. 33 166.033, F.S.; requiring municipalities to specify 34 minimum information necessary for certain 35 applications; revising timeframes for processing 36 applications for approval of development permits or 37 development orders; defining the term “substantive 38 change”; providing refund parameters in situations 39 where the municipality fails to meet certain 40 timeframes; providing exceptions; providing effective 41 dates. 42 43 Be It Enacted by the Legislature of the State of Florida: 44 45 Section 1. Section 125.022, Florida Statutes, is amended to 46 read: 47 125.022 Development permits and orders.— 48 (1) A county shall specify in writing the minimum 49 information that must be submitted in an application for a 50 zoning approval, rezoning approval, subdivision approval, 51 certification, special exception, or variance. A county shall 52 make the minimum information available for inspection and 53 copying at the location where the county receives applications 54 for development permits and orders, provide the information to 55 the applicant at a preapplication meeting, or post the 56 information on the county’s website. 57 (2) Within 5 business days after receiving an application 58 for approval of a development permit or development order, a 59 county shall confirm receipt of the application using contact 60 information provided by the applicant. Within 30 days after 61 receiving an application for approval of a development permit or 62 development order, a county must review the application for 63 completeness and issue a written notification to the applicant 64 letter indicating that all required information is submitted or 65 specify in writing specifying with particularity any areas that 66 are deficient. If the application is deficient, the applicant 67 has 30 days to address the deficiencies by submitting the 68 required additional information. For applications that do not 69 require final action through a quasi-judicial hearing or a 70 public hearing, the county must approve, approve with 71 conditions, or deny the application for a development permit or 72 development order within 120 days after the county has deemed 73 the application complete., or 180 days For applications that 74 require final action through a quasi-judicial hearing or a 75 public hearing, the county must approve, approve with 76 conditions, or deny the application for a development permit or 77 development order within 180 days after the county has deemed 78 the application complete. Both parties may agree in writing or 79 in a public meeting or hearing to a reasonable request for an 80 extension of time, particularly in the event of a force majeure 81 or other extraordinary circumstance. An approval, approval with 82 conditions, or denial of the application for a development 83 permit or development order must include written findings 84 supporting the county’s decision. The timeframes contained in 85 this subsection do not apply in an area of critical state 86 concern, as designated in s. 380.0552. The timeframes contained 87 in this subsection restart if an applicant makes a substantive 88 change to the application. As used in this subsection, the term 89 “substantive change” means an applicant-initiated change of 15 90 percent or more in the proposed density, intensity, or square 91 footage of a parcel. 92 (3)(a)(2)(a) When reviewing an application for a 93 development permit or development order that is certified by a 94 professional listed in s. 403.0877, a county may not request 95 additional information from the applicant more than three times, 96 unless the applicant waives the limitation in writing. 97 (b) If a county makes a request for additional information 98 and the applicant submits the required additional information 99 within 30 days after receiving the request, the county must 100 review the application for completeness and issue a letter 101 indicating that all required information has been submitted or 102 specify with particularity any areas that are deficient within 103 30 days after receiving the additional information. 104 (c) If a county makes a second request for additional 105 information and the applicant submits the required additional 106 information within 30 days after receiving the request, the 107 county must review the application for completeness and issue a 108 letter indicating that all required information has been 109 submitted or specify with particularity any areas that are 110 deficient within 10 days after receiving the additional 111 information. 112 (d) Before a third request for additional information, the 113 applicant must be offered a meeting to attempt to resolve 114 outstanding issues. If a county makes a third request for 115 additional information and the applicant submits the required 116 additional information within 30 days after receiving the 117 request, the county must deem the application complete within 10 118 days after receiving the additional information or proceed to 119 process the application for approval or denial unless the 120 applicant waived the county’s limitation in writing as described 121 in paragraph (a). 122 (e) Except as provided in subsection (7) (5), if the 123 applicant believes the request for additional information is not 124 authorized by ordinance, rule, statute, or other legal 125 authority, the county, at the applicant’s request, shall proceed 126 to process the application for approval or denial. 127 (4) A county must issue a refund to an applicant equal to: 128 (a) Ten percent of the application fee if the county fails 129 to issue written notification of completeness or written 130 specification of areas of deficiency within 30 days after 131 receiving the application. 132 (b) Ten percent of the application fee if the county fails 133 to issue a written notification of completeness or written 134 specification of areas of deficiency within 30 days after 135 receiving the additional information pursuant to paragraph 136 (3)(b). 137 (c) Twenty percent of the application fee if the county 138 fails to issue a written notification of completeness or written 139 specification of areas of deficiency within 10 days after 140 receiving the additional information pursuant to paragraph 141 (3)(c). 142 (d) Fifty percent of the application fee if the county 143 fails to approve, approves with conditions, or denies the 144 application within 30 days after conclusion of the 120-day or 145 180-day timeframe specified in subsection (2). 146 (e) One hundred percent of the application fee if the 147 county fails to approve, approves with conditions, or denies an 148 application 31 days or more after conclusion of the 120-day or 149 180-day timeframe specified in subsection (2). 150 151 A county is not required to issue a refund if the applicant and 152 the county agree to an extension of time, the delay is caused by 153 the applicant, or the delay is attributable to a force majeure 154 or other extraordinary circumstance. 155 (5)(3) When a county denies an application for a 156 development permit or development order, the county shall give 157 written notice to the applicant. The notice must include a 158 citation to the applicable portions of an ordinance, rule, 159 statute, or other legal authority for the denial of the permit 160 or order. 161 (6)(4) As used in this section, the terms “development 162 permit” and “development order” have the same meaning as in s. 163 163.3164, but do not include building permits. 164 (7)(5) For any development permit application filed with 165 the county after July 1, 2012, a county may not require as a 166 condition of processing or issuing a development permit or 167 development order that an applicant obtain a permit or approval 168 from any state or federal agency unless the agency has issued a 169 final agency action that denies the federal or state permit 170 before the county action on the local development permit. 171 (8)(6) Issuance of a development permit or development 172 order by a county does not in any way create any rights on the 173 part of the applicant to obtain a permit from a state or federal 174 agency and does not create any liability on the part of the 175 county for issuance of the permit if the applicant fails to 176 obtain requisite approvals or fulfill the obligations imposed by 177 a state or federal agency or undertakes actions that result in a 178 violation of state or federal law. A county shall attach such a 179 disclaimer to the issuance of a development permit and shall 180 include a permit condition that all other applicable state or 181 federal permits be obtained before commencement of the 182 development. 183 (9)(7) This section does not prohibit a county from 184 providing information to an applicant regarding what other state 185 or federal permits may apply. 186 Section 2. Present paragraph (j) of subsection (6) of 187 section 163.3180, Florida Statutes, is redesignated as paragraph 188 (k), and a new paragraph (j) is added to that subsection, to 189 read: 190 163.3180 Concurrency.— 191 (6) 192 (j) A school district may not collect, charge, or impose 193 any alternative fee in lieu of an impact fee to mitigate the 194 impact of development on educational facilities unless such fee 195 meets the requirements of s. 163.31801(4)(f) and (g). In any 196 action challenging a fee under this paragraph, the school 197 district has the burden of proving by a preponderance of the 198 evidence that the imposition and amount of the fee meet the 199 requirements of state legal precedent. 200 Section 3. Paragraph (a) of subsection (7) of section 201 553.80, Florida Statutes, is amended to read: 202 553.80 Enforcement.— 203 (7)(a) The governing bodies of local governments may 204 provide a schedule of reasonable fees, as authorized by s. 205 125.56(2) or s. 166.222 and this section, for enforcing this 206 part. These fees, and any fines or investment earnings related 207 to the fees, may only be used for carrying out the local 208 government’s responsibilities in enforcing the Florida Building 209 Code, including, but not limited to, any process or enforcement 210 related to obtaining or finalizing a building permit. When 211 providing a schedule of reasonable fees, the total estimated 212 annual revenue derived from fees, and the fines and investment 213 earnings related to the fees, may not exceed the total estimated 214 annual costs of allowable activities. Any unexpended balances 215 must be carried forward to future years for allowable activities 216 or must be refunded at the discretion of the local government. A 217 local government may not carry forward an amount exceeding the 218 average of its operating budget for enforcing the Florida 219 Building Code for the previous 4 fiscal years. For purposes of 220 this subsection, the term “operating budget” does not include 221 reserve amounts. Any amount exceeding this limit must be used as 222 authorized in subparagraph 2. However, a local government that 223 established, as of January 1, 2019, a Building Inspections Fund 224 Advisory Board consisting of five members from the construction 225 stakeholder community and carries an unexpended balance in 226 excess of the average of its operating budget for the previous 4 227 fiscal years may continue to carry such excess funds forward 228 upon the recommendation of the advisory board. The basis for a 229 fee structure for allowable activities must relate to the level 230 of service provided by the local government and must include 231 consideration for refunding fees due to reduced services based 232 on services provided as prescribed by s. 553.791, but not 233 provided by the local government. Fees charged must be 234 consistently applied. 235 1. As used in this subsection, the phrase “enforcing the 236 Florida Building Code” includes the direct costs and reasonable 237 indirect costs associated with review of building plans, 238 building inspections, reinspections, and building permit 239 processing; building code enforcement; and fire inspections 240 associated with new construction. The phrase may also include 241 training costs associated with the enforcement of the Florida 242 Building Code and enforcement action pertaining to unlicensed 243 contractor activity to the extent not funded by other user fees. 244 2. A local government must use any excess funds that it is 245 prohibited from carrying forward to rebate and reduce fees, to 246 upgrade technology hardware and software systems to enhance 247 service delivery, to pay for the construction of a building or 248 structure that houses a local government’s building code 249 enforcement agency, or for training programs for building 250 officials, inspectors, or plans examiners associated with the 251 enforcement of the Florida Building Code. Excess funds used to 252 construct such a building or structure must be designated for 253 such purpose by the local government and may not be carried 254 forward for more than 4 consecutive years. An owner or builder 255 who has a valid building permit issued by a local government for 256 a fee, or an association of owners or builders located in the 257 state that has members with valid building permits issued by a 258 local government for a fee, may bring a civil action against the 259 local government that issued the permit for a fee to enforce 260 this subparagraph. 261 3. The following activities may not be funded with fees 262 adopted for enforcing the Florida Building Code: 263 a. Planning and zoning or other general government 264 activities not related to obtaining a building permit. 265 b. Inspections of public buildings for a reduced fee or no 266 fee. 267 c. Public information requests, community functions, 268 boards, and any program not directly related to enforcement of 269 the Florida Building Code. 270 d. Enforcement and implementation of any other local 271 ordinance, excluding validly adopted local amendments to the 272 Florida Building Code and excluding any local ordinance directly 273 related to enforcing the Florida Building Code as defined in 274 subparagraph 1. 275 4. A local government must use recognized management, 276 accounting, and oversight practices to ensure that fees, fines, 277 and investment earnings generated under this subsection are 278 maintained and allocated or used solely for the purposes 279 described in subparagraph 1. 280 5. The local enforcement agency, independent district, or 281 special district may not require at any time, including at the 282 time of application for a permit, the payment of any additional 283 fees, charges, or expenses associated with: 284 a. Providing proof of licensure under chapter 489; 285 b. Recording or filing a license issued under this chapter; 286 c. Providing, recording, or filing evidence of workers’ 287 compensation insurance coverage as required by chapter 440; or 288 d. Charging surcharges or other similar fees not directly 289 related to enforcing the Florida Building Code. 290 Section 4. Effective January 1, 2026, paragraphs (g) and 291 (h) of subsection (6) of section 163.31801, Florida Statutes, 292 are amended to read: 293 163.31801 Impact fees; short title; intent; minimum 294 requirements; audits; challenges.— 295 (6) A local government, school district, or special 296 district may increase an impact fee only as provided in this 297 subsection. 298 (g)1. A local government, school district, or special 299 district may increase an impact fee rate beyond the phase-in 300 limitations established under paragraph (b), paragraph (c), 301 paragraph (d), or paragraph (e) by establishing the need for 302 such increase in full compliance with the requirements of 303 subsection (4), provided the following criteria are met: 304 a.1. A demonstrated-need study justifying any increase in 305 excess of those authorized in paragraph (b), paragraph (c), 306 paragraph (d), or paragraph (e) has been completed within the 12 307 months before the adoption of the impact fee increase and 308 expressly demonstrates the extraordinary circumstances 309 necessitating the need to exceed the phase-in limitations. 310 b.2. The local government jurisdiction has held at least 311 not less than two publicly noticed workshops dedicated to the 312 extraordinary circumstances necessitating the need to exceed the 313 phase-in limitations set forth in paragraph (b), paragraph (c), 314 paragraph (d), or paragraph (e). 315 c.3. The impact fee increase ordinance is approved by at 316 least a unanimous two-thirds vote of the governing body. 317 2. An impact fee increase approved under this paragraph 318 must be implemented in at least two but not more than four equal 319 annual increments beginning with the date on which the impact 320 fee increase ordinance is adopted. 321 3. A local government may not increase an impact fee rate 322 beyond the phase-in limitations under this paragraph if the 323 local government has not increased the impact fee within the 324 past 5 years. Any year in which the local government is 325 prohibited from increasing an impact fee because the 326 jurisdiction is in a hurricane disaster area is not included in 327 the 5-year period. 328 (h) This subsection operates retroactively to January 1, 329 2021. 330 Section 5. Paragraphs (b) and (c) of subsection (3) of 331 section 163.3184, Florida Statutes, are amended to read: 332 163.3184 Process for adoption of comprehensive plan or plan 333 amendment.— 334 (3) EXPEDITED STATE REVIEW PROCESS FOR ADOPTION OF 335 COMPREHENSIVE PLAN AMENDMENTS.— 336 (b)1. If a plan amendment or amendments are adopted, the 337 local government, after the initial public hearing held pursuant 338 to subsection (11), shall transmit, within 10 working days after 339 the date of adoption, the amendment or amendments and 340 appropriate supporting data and analyses to the reviewing 341 agencies. The local governing body shall also transmit a copy of 342 the amendments and supporting data and analyses to any other 343 local government or governmental agency that has filed a written 344 request with the governing body. 345 2. The reviewing agencies and any other local government or 346 governmental agency specified in subparagraph 1. may provide 347 comments regarding the amendment or amendments to the local 348 government. State agencies shall only comment on important state 349 resources and facilities that will be adversely impacted by the 350 amendment if adopted. Comments provided by state agencies shall 351 state with specificity how the plan amendment will adversely 352 impact an important state resource or facility and shall 353 identify measures the local government may take to eliminate, 354 reduce, or mitigate the adverse impacts. Such comments, if not 355 resolved, may result in a challenge by the state land planning 356 agency to the plan amendment. Agencies and local governments 357 must transmit their comments to the affected local government 358 such that they are received by the local government not later 359 than 30 days after the date on which the agency or government 360 received the amendment or amendments. Reviewing agencies shall 361 also send a copy of their comments to the state land planning 362 agency. 363 3. Comments to the local government from a regional 364 planning council, county, or municipality shall be limited as 365 follows: 366 a. The regional planning council review and comments shall 367 be limited to adverse effects on regional resources or 368 facilities identified in the strategic regional policy plan and 369 extrajurisdictional impacts that would be inconsistent with the 370 comprehensive plan of any affected local government within the 371 region. A regional planning council may not review and comment 372 on a proposed comprehensive plan amendment prepared by such 373 council unless the plan amendment has been changed by the local 374 government subsequent to the preparation of the plan amendment 375 by the regional planning council. 376 b. County comments shall be in the context of the 377 relationship and effect of the proposed plan amendments on the 378 county plan. 379 c. Municipal comments shall be in the context of the 380 relationship and effect of the proposed plan amendments on the 381 municipal plan. 382 d. Military installation comments shall be provided in 383 accordance with s. 163.3175. 384 4. Comments to the local government from state agencies 385 shall be limited to the following subjects as they relate to 386 important state resources and facilities that will be adversely 387 impacted by the amendment if adopted: 388 a. The Department of Environmental Protection shall limit 389 its comments to the subjects of air and water pollution; 390 wetlands and other surface waters of the state; federal and 391 state-owned lands and interest in lands, including state parks, 392 greenways and trails, and conservation easements; solid waste; 393 water and wastewater treatment; and the Everglades ecosystem 394 restoration. 395 b. The Department of State shall limit its comments to the 396 subjects of historic and archaeological resources. 397 c. The Department of Transportation shall limit its 398 comments to issues within the agency’s jurisdiction as it 399 relates to transportation resources and facilities of state 400 importance. 401 d. The Fish and Wildlife Conservation Commission shall 402 limit its comments to subjects relating to fish and wildlife 403 habitat and listed species and their habitat. 404 e. The Department of Agriculture and Consumer Services 405 shall limit its comments to the subjects of agriculture, 406 forestry, and aquaculture issues. 407 f. The Department of Education shall limit its comments to 408 the subject of public school facilities. 409 g. The appropriate water management district shall limit 410 its comments to flood protection and floodplain management, 411 wetlands and other surface waters, and regional water supply. 412 h. The state land planning agency shall limit its comments 413 to important state resources and facilities outside the 414 jurisdiction of other commenting state agencies and may include 415 comments on countervailing planning policies and objectives 416 served by the plan amendment that should be balanced against 417 potential adverse impacts to important state resources and 418 facilities. 419 (c)1. The local government shall hold a second public 420 hearing, which shall be a hearing on whether to adopt one or 421 more comprehensive plan amendments pursuant to subsection (11). 422 If the local government fails, within 180 days after receipt of 423 agency comments, to hold the second public hearing, and to adopt 424 the comprehensive plan amendments, the amendments are deemed 425 withdrawn unless extended by agreement with notice to the state 426 land planning agency and any affected person that provided 427 comments on the amendment. If the amendments are not adopted at 428 the second public hearing, the amendments shall be formally 429 adopted by the local government within 180 days after the second 430 public hearing is held or the amendments are deemed withdrawn 431 The 180-day limitation does not apply to amendments processed 432 pursuant to s. 380.06. 433 2. All comprehensive plan amendments adopted by the 434 governing body, along with the supporting data and analysis, 435 shall be transmitted within 30 10 working days after the final 436 adoption hearing to the state land planning agency and any other 437 agency or local government that provided timely comments under 438 subparagraph (b)2. If the local government fails to transmit the 439 comprehensive plan amendments within 30 10 working days after 440 the final adoption hearing, the amendments are deemed withdrawn. 441 3. The state land planning agency shall notify the local 442 government of any deficiencies within 5 working days after 443 receipt of an amendment package. For purposes of completeness, 444 an amendment shall be deemed complete if it contains a full, 445 executed copy of: 446 a. The adoption ordinance or ordinances; 447 b. In the case of a text amendment, the amended language in 448 legislative format with new words inserted in the text 449 underlined, and words deleted stricken with hyphens; 450 c. In the case of a future land use map amendment, the 451 future land use map clearly depicting the parcel, its existing 452 future land use designation, and its adopted designation; and 453 d. Any data and analyses the local government deems 454 appropriate. 455 4. An amendment adopted under this paragraph does not 456 become effective until 31 days after the state land planning 457 agency notifies the local government that the plan amendment 458 package is complete. If timely challenged, an amendment does not 459 become effective until the state land planning agency or the 460 Administration Commission enters a final order determining the 461 adopted amendment to be in compliance. 462 Section 6. Section 166.033, Florida Statutes, is amended to 463 read: 464 166.033 Development permits and orders.— 465 (1) A municipality shall specify in writing the minimum 466 information that must be submitted for an application for a 467 zoning approval, rezoning approval, subdivision approval, 468 certification, special exception, or variance. A municipality 469 shall make the minimum information available for inspection and 470 copying at the location where the municipality receives 471 applications for development permits and orders, provide the 472 information to the applicant at a preapplication meeting, or 473 post the information on the municipality’s website. 474 (2) Within 5 business days after receiving an application 475 for approval of a development permit or development order, a 476 municipality shall confirm receipt of the application using 477 contact information provided by the applicant. Within 30 days 478 after receiving an application for approval of a development 479 permit or development order, a municipality must review the 480 application for completeness and issue a written notification to 481 the applicant letter indicating that all required information is 482 submitted or specify in writing specifying with particularity 483 any areas that are deficient. If the application is deficient, 484 the applicant has 30 days to address the deficiencies by 485 submitting the required additional information. For applications 486 that do not require final action through a quasi-judicial 487 hearing or a public hearing, the municipality must approve, 488 approve with conditions, or deny the application for a 489 development permit or development order within 120 days after 490 the municipality has deemed the application complete., or 180 491 days For applications that require final action through a quasi 492 judicial hearing or a public hearing, the municipality must 493 approve, approve with conditions, or deny the application for a 494 development permit or development order within 180 days after 495 the municipality has deemed the application complete. Both 496 parties may agree in writing or in a public meeting or hearing 497 to a reasonable request for an extension of time, particularly 498 in the event of a force majeure or other extraordinary 499 circumstance. An approval, approval with conditions, or denial 500 of the application for a development permit or development order 501 must include written findings supporting the municipality’s 502 decision. The timeframes contained in this subsection do not 503 apply in an area of critical state concern, as designated in s. 504 380.0552 or chapter 28-36, Florida Administrative Code. The 505 timeframes contained in this subsection restart if an applicant 506 makes a substantive change to the application. As used in this 507 subsection, the term “substantive change” means an applicant 508 initiated change of 15 percent or more in the proposed density, 509 intensity, or square footage of a parcel. 510 (3)(a)(2)(a) When reviewing an application for a 511 development permit or development order that is certified by a 512 professional listed in s. 403.0877, a municipality may not 513 request additional information from the applicant more than 514 three times, unless the applicant waives the limitation in 515 writing. 516 (b) If a municipality makes a request for additional 517 information and the applicant submits the required additional 518 information within 30 days after receiving the request, the 519 municipality must review the application for completeness and 520 issue a letter indicating that all required information has been 521 submitted or specify with particularity any areas that are 522 deficient within 30 days after receiving the additional 523 information. 524 (c) If a municipality makes a second request for additional 525 information and the applicant submits the required additional 526 information within 30 days after receiving the request, the 527 municipality must review the application for completeness and 528 issue a letter indicating that all required information has been 529 submitted or specify with particularity any areas that are 530 deficient within 10 days after receiving the additional 531 information. 532 (d) Before a third request for additional information, the 533 applicant must be offered a meeting to attempt to resolve 534 outstanding issues. If a municipality makes a third request for 535 additional information and the applicant submits the required 536 additional information within 30 days after receiving the 537 request, the municipality must deem the application complete 538 within 10 days after receiving the additional information or 539 proceed to process the application for approval or denial unless 540 the applicant waived the municipality’s limitation in writing as 541 described in paragraph (a). 542 (e) Except as provided in subsection (7) (5), if the 543 applicant believes the request for additional information is not 544 authorized by ordinance, rule, statute, or other legal 545 authority, the municipality, at the applicant’s request, shall 546 proceed to process the application for approval or denial. 547 (4) A municipality must issue a refund to an applicant 548 equal to: 549 (a) Ten percent of the application fee if the municipality 550 fails to issue written notification of completeness or written 551 specification of areas of deficiency within 30 days after 552 receiving the application. 553 (b) Ten percent of the application fee if the municipality 554 fails to issue written notification of completeness or written 555 specification of areas of deficiency within 30 days after 556 receiving the additional information pursuant to paragraph 557 (3)(b). 558 (c) Twenty percent of the application fee if the 559 municipality fails to issue written notification of completeness 560 or written specification of areas of deficiency within 10 days 561 after receiving the additional information pursuant to paragraph 562 (3)(c). 563 (d) Fifty percent of the application fee if the 564 municipality fails to approve, approves with conditions, or 565 denies the application within 30 days after conclusion of the 566 120-day or 180-day timeframe specified in subsection (2). 567 (e) One hundred percent of the application fee if the 568 municipality fails to approve, approves with conditions, or 569 denies an application 31 days or more after conclusion of the 570 120-day or 180-day timeframe specified in subsection (2). 571 572 A municipality is not required to issue a refund if the 573 applicant and the municipality agree to an extension of time, 574 the delay is caused by the applicant, or the delay is 575 attributable to a force majeure or other extraordinary 576 circumstance. 577 (5)(3) When a municipality denies an application for a 578 development permit or development order, the municipality shall 579 give written notice to the applicant. The notice must include a 580 citation to the applicable portions of an ordinance, rule, 581 statute, or other legal authority for the denial of the permit 582 or order. 583 (6)(4) As used in this section, the terms “development 584 permit” and “development order” have the same meaning as in s. 585 163.3164, but do not include building permits. 586 (7)(5) For any development permit application filed with 587 the municipality after July 1, 2012, a municipality may not 588 require as a condition of processing or issuing a development 589 permit or development order that an applicant obtain a permit or 590 approval from any state or federal agency unless the agency has 591 issued a final agency action that denies the federal or state 592 permit before the municipal action on the local development 593 permit. 594 (8)(6) Issuance of a development permit or development 595 order by a municipality does not create any right on the part of 596 an applicant to obtain a permit from a state or federal agency 597 and does not create any liability on the part of the 598 municipality for issuance of the permit if the applicant fails 599 to obtain requisite approvals or fulfill the obligations imposed 600 by a state or federal agency or undertakes actions that result 601 in a violation of state or federal law. A municipality shall 602 attach such a disclaimer to the issuance of development permits 603 and shall include a permit condition that all other applicable 604 state or federal permits be obtained before commencement of the 605 development. 606 (9)(7) This section does not prohibit a municipality from 607 providing information to an applicant regarding what other state 608 or federal permits may apply. 609 Section 7. Except as otherwise expressly provided in this 610 act, this act shall take effect October 1, 2025.

Official text from the Florida Legislature. Formatting has been adapted for reading on Ratifi.